HomeMy WebLinkAbout05. CC 664C Fire Station 1 Gates AGENDA MEMO DATE: December 13, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:CASH CONTRACT NO. 664C – FIRE STATION NO. 1-METAL GATES INSTALLATION PROJECT – APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION FOR BIDS RECOMMENDATION That the City Council approve plans and specifications and authorize solicitation for bids for Cash Contract No. 664C – Fire Station No. 1-Metal Gates Installation Project. BACKGROUND Previously, a five-foot tall perimeter unreinforced block wall, chain link fence and vehicular gates existed at the southeast corner of Fire Station No. 1, adjacent to the Emergency Operations Center (EOC) building. The substandard wall and fencing did not provide adequate security and were susceptible to failure in the event of an earthquake. The City Council approved solicitation of bids for replacement of the substandard wall and fencing. Bids were received for the construction of a new reinforced split-face block wall with two new motorized sliding metal gates, and miscellaneous paving and irrigation work. However, all received bids substantially exceeded the project budget. The City Council rejected all bids and granted authority to re-advertise for bids. The project was re- advertised, and once again all received bids exceeded the budgeted funding. The City Council, again rejected all bids for the project. As a result, in order to meet the primary goal of the project which was to enhance security at Fire Station No. 1, staff has revised the scope of work. Moreover, the project was divided into two phases. The first phase, entailed construction of a new reinforced block wall (without the metal gates) and was completed in May of 2010. The second phase includes the construction of new sliding metal gates with motorized operators. DISCUSSION In coordination with the Fire Department staff, the Engineering Division has completed preparation of the plans, specifications and construction cost estimate for the metal gates installation project and the project is now ready for the solicitation of construction bids. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. 664C – Fire Station No. 1-Metal Gates Installation Project December 13, 2011 Page 2 This project consists of installation of two (2) new 25-foot wide vehicular sliding metal gates with motorized operators and opening controls, one (1) new 4-foot wide swinging pedestrian metal gate and all necessary related work. FINANCIAL IMPACT Based on the construction cost estimate, the total cost for the Fire Station No. 1 Metal Gates Installation Project will be $80,000. This estimate includes a fifteen percent (15%) construction cost contingency, construction engineering, inspection, materials testing and contract administration costs. Sufficient funds have been programmed for this project in the FY 2011-12 Capital Improvement Program under Account No. 40- 13072. A detailed funding summary for the project will be presented at the time of the contract award. Attachment: Project Location Map S:\AgendaMemosCC2011\12-13-11\CC 664C Fire Sta No 1 Metal Gates (Auth to Bid) Ю±°±­»¼ ò ò Ó»¬¿´Ù¿¬»­ Ý×ÌÇÑÚÜÑÉÒÛÇ ÜÛÐßÎÌÓÛÒÌÑÚÐËÞÔ×ÝÉÑÎÕÍÛÒÙ×ÒÛÛÎ×ÒÙÜ×Ê×Í×ÑÒ ÔÑÝßÌ×ÑÒÓßÐ ÝßÍØÝÑÒÌÎßÝÌÒÑòêêìÝÚ×ÎÛÍÌßÌ×ÑÒÒÑòïÓÛÌßÔÙßÌÛÍ ×ÒÍÌßÔÔßÌ×ÑÒÐÎÑÖÛÝÌ