Loading...
HomeMy WebLinkAbout03. Cash Contract S.S. 622 Streets Resurfacing AGENDA MEMO DATE: September 13, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:RECOMMENDATION TO ACCEPT COMPLETION OFCASH CONTRACT NO. S.S. 622 – RESIDENTIAL STREETS RESURFACING PROJECT; AND TO DIRECT THE PUBLIC WORKS DIRECTOR TO FILE THE NOTICE OF COMPLETION RECOMMENDATION That the City Council accept the improvements constructed under Cash Contract No. S.S. 622 – Residential Streets Resurfacing Project, approve the final construction contract amount of $1,055,191.42 and direct the Public Works Director to file the Notice of Completion. BACKGROUND On November 9, 2010, the City Council approved plans and specifications for Cash Contract No. S.S. 622 - Residential Streets Resurfacing Project, on various residential street segments throughout the City. The goal of the project was to extend the pavement life on residential streets, enhance accessibility for pedestrians, and improve drainage, and eliminate potentially hazardous conditions. On January 11, 2011, the City Council awarded Cash Contract No. S.S. 622 to Hardy & Harper, Incorporated for the Residential Streets Resurfacing Project in the amount of $1,247,000.00. The City successfully negotiated three contract change orders with Hardy & Harper, Incorporated, to effect certain changes in the scope of work on the project. These change orders primarily involved credits for deleted or modified work such as utilizing conventional asphalt concrete pavement in lieu of rubberized asphalt concrete and reducing the depth of pavement grinding and excavation needed to resurface the residential streets. The net overall savings resulting from these change orders was $183,058.88. DISCUSSION As of July 29, 2011, all work under Cash Contract No. S.S. 622 has been completed per previously approved plans and specifications and to the satisfaction of staff; therefore, the project is deemed complete and staff recommends releasing the remaining funds to Hardy & Harper, Incorporated. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. 622 – Residential Streets Resurfacing Project September 13, 2011 Page 2 Specifically, the improvements constructed under the Residential Streets Resurfacing Project included the following items: Reconstruction/resurfacing of deteriorated pavement on various residential street segments throughout the City (approx. 4.1 miles of residential streets, 8,862 tons of asphalt concrete pavement); Construction of new curb ramps at intersections to enhance pedestrian accessibility; Repair of uplifted sidewalk, curb ramps, driveway approaches and curb and gutter; Reconstruction of non-standard driveway approaches, curb ramps, and sidewalk to comply with Americans with Disabilities Act (ADA) standards; Reconstruction of deteriorated cross gutters; Trimming and root pruning of parkway trees; Replacement of traffic striping and pavement markings; and Incidental replacement of traffic signal loop detectors. FINANCIAL IMPACT The final cost of the construction work, including all change orders and net reduction in contract quantities, is $1,055,191.42. The total authorized amount by the City Council for the construction work, which included a ten percent contingency, was $1,500,000.00. The total final project cost is $1,184,145.04, which includes all design, construction, contract administration, and inspection costs. Sufficient funding is available for all items of work for this project, as detailed in the table on the following page. Mayor and Members of the City Council Cash Contract No. 622 – Residential Streets Resurfacing Project September 13, 2011 Page 3 CONSTRUCTION CONTRACT COST SUMMARY Description Amount Base Contract Amount $1,247,000.00 Contract Change Orders (Savings) ($183,058.88) Decrease in Contract Quantities (Savings) ($8,749.70) TOTAL CONSTRUCTION CONTRACT COST $1,055,191.42 TOTAL PROJECT COST SUMMARY Description Amount Total Construction Contract Cost $1,055,191.42 Project Design $52,840.00 Inspection, Construction Engineering & Contract Administration $76,113.62 TOTAL PROJECT COST: $1,184,145.04 PROJECT FUNDING Account Number Gas TaxTotal 26-16622 $1,500,000.00 $1,500,000.00 TOTAL PROJECT FUNDING: $1,500,000.00 FUNDING SURPLUS: $315,854.96 S:\AgendaMemosCC2011\09-13-11\SS622 Acceptance