HomeMy WebLinkAbout05. Cash Contract S.S. 633 Slurry Seal-Bids AGENDA MEMO DATE: July 26, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:CASH CONTRACT NO. 633 – SLURRY SEAL PROJECT AREA “B” AND REMAINDER OF AREA “A” – APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION FOR BIDS. RECOMMENDATION That the City Council approve plans and specifications and authorize solicitation for bids for Cash Contract No. 633 – Slurry Seal Project Area “B” and Remainder of Area “A”. BACKGROUND The slurry seal program is designed to seal aged asphalt concrete pavement and extend its life on various streets throughout the City. In order to implement a citywide systematic and efficient slurry seal program, the City has been divided into four areas (Areas “A” through “D”, see Attachment 1) and each year, the roadways within the specified area will be sealed. In the previous fiscal year (2010-11) as part of Cash Contract No. S.S. 626, forty-four (44) street segments within Area “A” were slurry sealed (see Attachment 3). A budget of $392,000 was programmed to do this work; however, the cost to slurry seal Area “A” was approximately $183,000 (including administration, design and inspection) for a cost savings of approximately $209,000. This cost savings was carried over into the current fiscal year (2011-12) allowing the City to slurry seal remaining streets in Area “A” and streets in Area “B”. In subsequent years (FY2012-13 and FY2013-14), roadways within Areas “C” and “D” will be slurry sealed. DISCUSSION The work to be completed generally consists of crack sealing, applying Type I and Type II slurry seal coats, replacement of striping and pavement markings, and all necessary related work. Some street segments will also require the replacement of asphalt concrete pavement at certain locations, which will be handled independently of this project. Engineering Division staff has completed preparation of the plans, specifications and construction cost estimate and the project is now ready for solicitation of construction bids. Staff has selected fifty-nine (59) residential street segments and three (3) arterial street segments in Area “B” and the remainder of Area “A”, covering a total of approximately 9.0 miles of roadway. The streets and limits are shown on the attached Project Locations Map and Project Street List (Attachments 2 and 3). CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. S.S. 633 – Slurry Seal Project Area “B” & Remainder of Area “A” July 26, 2011 Page 2 FINANCIAL IMPACT Based on the construction cost estimate, the total cost for the Slurry Seal Project Area “B” and Remainder of Area “A” will be approximately $388,000. This includes a 10% construction cost contingency, replacement of asphalt concrete, construction engineering, inspection, materials testing and contract administration costs. Currently, $500,000 is available for the City’s FY 2011-12 Capital Improvement Program, consisting of Gas Tax funds under Account No. 26-16633. A detailed funding summary for the project will be presented at the time the contract is awarded. Attachments: Attachment 1 – City of Downey Four Year Slurry Seal Program Map Attachment 2 – Area “B” & Remainder of Area “A” Project Street List Attachment 3 – Area “B” & Remainder of Area “A” Project Locations Map S:\AgendaMemosCC2011\7-26-11\SS633 Advertise ß®»¿þßþ ß®»¿þÜþ ß®»¿þÝþ ß®»¿þÞþ ïôìððéðððïôìððÚ»»¬ Ý×ÌÇÑÚÜÑÉÒÛÇ ÛÒÙ×ÒÛÛÎ×ÒÙÜ×Ê×Í×ÑÒ ÜÛÐßÎÌÓÛÒÌÑÚÐËÞÔ×ÝÉÑÎÕÍ ßÌÌßÝØÓÛÒÌï ÚÑËÎóÇÛßÎÍÔËÎÎÇÍÛßÔÐÎÑÙÎßÓÓßÐ ûèèûùôï÷îè ìêíò÷ùèéèê÷÷èðóéèûê÷ûúê÷ïûóîø÷êíöûê÷ûû éÈÊ××ÈöÊÍÏèÍð×ÎÕÈÔûÊ×Û ÖÈÉËÖÈ èêóéèûîøêïùùûððçïéèîûøûéè   ð÷ûôãûæùçðø÷éûùûø÷îïííêûæ    óúú÷èéíîûæ÷ú÷ðùô÷êéè ùíêîçèûûæ÷ûîõ÷ððéè   ùíêîçèûûæ÷ú÷ðùô÷êéèûîõ÷ððéè   ÷ûéèúêííñûæ÷öíéè÷êêøûîõ÷ððéè    øçîêíúóîûæ÷öíéè÷êêøûîõ÷ððéè     ú÷ðùô÷êéè÷ûéèúêííñûæ÷ùíêîçèûûæ÷  ïûêú÷ðûæ÷øíîíæûîéèïíêãéè   úçùñð÷ééèèêóéèûîøêðûñ÷åííøúðæø   ûêøóî÷éèìûîõúíêîûæ÷î÷åæóðð÷ûæ÷   ðûæóððûéèìûîõúíêîûæ÷î÷åæóðð÷ûæ÷   î÷åæóðð÷ûæ÷ðûæóððûéèûêøóî÷éè    î÷åæóðð÷ûæ÷ïçðð÷êéèëçóîîéè  ëçóîîéèî÷åæóðð÷ûæ÷ð÷éè÷êöíêøûæ÷   ûøíê÷÷éèéèûîúêóøõ÷êøùçðø÷éûù  ûøíê÷÷éèéèûîúêóøõ÷êøûêøóéûæ÷  ûîõ÷ððéèùíêêóõûîûæ÷ùçðø÷éûù   ð÷éè÷êöíêøûæ÷öðíê÷îù÷ûæ÷ù÷ùóðóûéè   úíãî÷éèïûêú÷ðûæ÷ùçðø÷éûù    úã÷êééèïûêú÷ðûæ÷ùçðø÷éûù   ûðúóûéèïûêú÷ðûæ÷ùçðø÷éûù   ùíðøúêííñûæ÷ìêóéùóððûéèûîõ÷ððéè   óâ÷èèûûæ÷ìêóéùóððûéèûîõ÷ððéè   úêííñéôóê÷ûæ÷øûæóééèöóê÷éèíî÷úðæø    õûððûèóîêøðûñ÷åííøúðæøð÷ïíêûîûæ÷    ïùùûððçïéèïûêú÷ðûæ÷ùçðø÷éûù    ïûêú÷ðûæ÷ûðûï÷øûéèïùùûððçïéè    ùûéûî÷éûæ÷ù÷ùóðóûéèì÷ðð÷èéè     öíéèíêóûéèìûîõúíêîûæ÷î÷åæóðð÷ûæ÷   ùûéûî÷éûæ÷õíèôûïéèæóûûïíêóèû    öíîèûîûéèø÷ïóîõûæ÷  ø÷ïóîõûæ÷öíîèûîûéèùçðø÷éûù  ïûêú÷ðûæ÷öíîèûîûéèùçðø÷éûù    úçùñð÷ééèðûñ÷åííøúðæøú÷ððöðíå÷êúðæø ùíêøûæ÷æóûûïíêóèûöðíê÷îù÷ûæ÷  öíéèíêóûéèåííøêçööûæ÷ùçðø÷éûù  ùíêøûæ÷ù÷ùóðóûéèöíéèíêóûéè  ïíêãéèïûêú÷ðûæ÷ðûñ÷åííøúðæøöêè   úíãéíîéèúóêùôøûð÷ûæ÷úðíøõ÷èèûæ÷  ï÷ðæûéèïûêú÷ðûæ÷ðûñ÷åííøúðæøöêè  ïûêú÷ðûæ÷ûðûï÷øûéèï÷ðæûéè    ÷çùûðãìèçééèúêííñéôóê÷ûæ÷úóêùôøûð÷ûæ÷   ï÷ûøíåêøúóêùôøûð÷ûæ÷ðûñ÷åííøúðæø    ìêóéùóððûéèøçîêíúóîûæ÷ûø÷îïííêûæ÷   ûø÷îïííêûæ÷ìêóéùóððûéèûîõ÷ððéè    î÷åæóðð÷ûæ÷öóê÷éèíî÷úðæøûêøóî÷éè  åííøêçööûæ÷ù÷ùóðóûéèöóê÷éèíî÷úðæø  öûêïéèåííøêçööûæ÷ôûéèãûæ÷  úóõúãéèåííøêçööûæ÷ôûéèãûæ÷  æóûûïíêóèûåííøêçööûæ÷ìûîõúíêîûæ÷   ðóîøé÷ãûæ÷ù÷øûêèê÷÷êøúêííñìûêñêø  øûð÷åííøûæ÷úêííñìûêñêøùçðø÷éûù  ûðóåóîéèøûð÷åííøûæ÷èêç÷ûæ÷  ù÷øûêèê÷÷êøñðóî÷øûð÷ûæ÷èêç÷ûæ÷    ñðóî÷øûð÷ûæ÷ù÷øûêèê÷÷êøèêç÷ûæ÷   éíîõö÷éèøêï÷èêíéèè÷ð÷õêûìôêø     ï÷èêíéèéóø÷æó÷åøêèêç÷ûæ÷   ìóùíæóéèûùçðø÷éûùùçðø÷éûù  úêííñìûêñêøèêç÷ûæ÷ìóùíæóéèûêø   éóø÷æó÷åøêúêííñìûêñêøù÷øûêèê÷÷êø    ù÷øûêèê÷÷êøé÷êûìóéûæ÷ùôûî÷ãûæ÷  é÷êûìóéè÷ð÷õêûìôêøùçðø÷éûù       èíèûð