Loading...
HomeMy WebLinkAbout06. Cash Contract S.S. 593 Downey Pave Rehab-Accept AGENDA MEMO DATE: June 28, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:RECOMMENDATION TO ACCEPT COMPLETION OFCASH CONTRACT NO. S.S. 593 – DOWNEY AVENUE PAVEMENT REHABILITATION; AND TO DIRECT THE PUBLIC WORKS DIRECTOR TO FILE THE NOTICE OF COMPLETION RECOMMENDATION: That the City Council accept the improvements constructed under Cash Contract No. S.S. 593, approve the final construction contract amount of $1,407,200.48, and direct the Public Works Director to file the Notice of Completion. BACKGROUND: On August 10, 2010, the City Council approved plans and specifications for Cash Contract No. S.S. 593, the Downey Avenue Pavement Rehabilitation Project, from th 5 Street to Gallatin Road. The goal of the project was to extend the life of the roadway pavement, enhance accessibility for pedestrians, improve drainage, upgrade potable water facilities, beautify the streetscape, and eliminate potentially hazardous conditions. On November 23, 2010, the City Council awarded Cash Contract No. S.S. 593 to Silvia th Construction, Inc. for the Downey Avenue Pavement Rehabilitation project, from 5 Street to Gallatin Road, in the amount of $1,384,047. DISCUSSION: All work under Cash Contract No. 593 has been completed per previously approved plans and specifications and to the satisfaction of staff; therefore, the project is deemed complete and staff recommends releasing the remaining funds to Silvia Construction, Inc. Specifically, the improvements constructed under the Downey Avenue Pavement th Rehabilitation Project, from 5 Street to Gallatin Road, included the following items: Reconstruction/resurfacing of deteriorated pavement on Downey Ave. from th 5 Street to Gallatin Road; Construction of new sidewalk and curb ramps at intersections to enhance pedestrian accessibility; CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. S.S. 593 – Downey Avenue Pavement Rehabilitation June 28, 2011 Page 2 Reconstruction of non-standard driveway approaches and sidewalk to comply with Americans with Disabilities Act (ADA) standards and the repair of uplifted sidewalk, curb ramps, driveway approaches and curb and gutter; Reconstruction of deteriorated cross gutters; Replacement of aging water service meters and fire hydrants and abandonment of old water distribution lines; Trimming, pruning, and planting of new street trees; and Incidental replacement of traffic signal loop detectors, striping and pavement markings. FINANCIAL IMPACT: The final cost of the construction work, including all change orders and a net increase in contract quantities, is $1,407,200.48. The total authorized amount by the City Council for the construction work was $1,554,623, which included a $170,576 (12%) contingency. Included in the final cost are two change orders, paid on a lump sum and force-account basis, in the amount of $118,340.16 for changes to roadway design, correcting subgrade failures, additional water valve replacements, potholing utilities, and relocating existing improvements such as fire hydrants, light poles, fences and planters to accommodate new sidewalk. The total final project cost is $1,586,503.48, which includes all design, construction, contract administration, material testing, and inspection costs. Sufficient funding is available for all items of work for this project, as detailed in the table on page 3. Mayor and Members of the City Council Cash Contract No. S.S. 593 – Downey Avenue Pavement Rehabilitation June 28, 2011 Page 3 CONSTRUCTION CONTRACT COST SUMMARY Description Amount Base Contract Amount $1,384,047.40 Contract Change Orders $118,340.16 Decrease in Contract Quantities ($95,187.08) TOTAL CONSTRUCTION CONTRACT COST $1,407,200.48 TOTAL PROJECT COST SUMMARY Description Amount Total Construction Contract Cost $1,407,200.48 Design, Inspection, Material Testing, Construction Engineering & Contract Administration $179,303.00 TOTAL PROJECT COST: $1,586,503.48 PROJECT FUNDING Total Account Number Prop 1B Gas Tax 26-1-6593 $1,688,623.00 $1,688,623.00 26-1-6593 $600,000.00 $600,000.00 TOTAL PROJECT FUNDING: $2,288,623.00 FUNDING SURPLUS: $702,119.52 S:\AgendaMemosCC2011\6-28-11\SS593AcceptFinalconstruction