Loading...
HomeMy WebLinkAbout03. Cash Contract S.S. 625-Lakewood Imprmts AGENDA MEMO DATE: April 26, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:CASH CONTRACT NO. S.S. 625 – LAKEWOOD BOULEVARD AT COLUMBIA WAY INTERSECTION IMPROVEMENT PROJECT – APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION FOR BIDS RECOMMENDATION: That the City Council approve plans and specifications and authorize solicitation for bids for Cash Contract No. S.S. 625 – Lakewood Boulevard at Columbia Way Intersection Improvement Project BACKGROUND: Columbia Way is a Secondary Arterial roadway within the City and carries approximately 8,000 vehicles per day (VPD). Columbia Way accommodates both sub- regional and local traffic and continues to the south through the Cities of Bellflower and Lakewood and terminates in the City of Long Beach. In addition, this street provides local access within the City of Downey to several key attractions and designations such as Discovery Sports Complex, Columbia Memorial Space Center, Kaiser Medical Center, the Los Angeles County Department of Education and the residential neighborhood on the west side of the Street between Imperial Highway and Lakewood Boulevard. Currently, vehicular traffic traveling southbound on Lakewood Boulevard cannot turn left on Columbia Way due to the presence of a continuous raised median along Lakewood Boulevard. The demand for left-turning traffic from southbound Lakewood Boulevard onto Columbia Way has steadily increased due to the additions of the Discovery Sports Complex, Columbia Memorial Space Center and Kaiser Medical Center. This increased demand has placed a burden on other nearby intersections, such as Lakewood Boulevard at Imperial Highway and has created neighborhood intrusion issues on Rose Avenue and James Street. In order to improve overall traffic circulation, increase convenience for motorists traveling southbound on Lakewood Boulevard destined for the aforementioned uses along Columbia Way and decrease neighborhood intrusion, the City wishes to provide left turn access from southbound Lakewood Boulevard onto southbound Columbia Way. DISCUSSION: The implementation of the Lakewood Boulevard at Columbia Way Intersection Improvement Project will provide the necessary left-turn access at this intersection. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. S.S. 625 – Lakewood Boulevard At Columbia Way Intersection Improvement Project April 26, 2011 Page 2 The Engineering Division staff has completed preparation of the plans, specifications and construction cost estimate and the project is now ready for solicitation of construction bids. The project location is highlighted on the attached Location Map. Specifically, this project will involve the following tasks: Removal of a portion of the existing raised median island, landscaping, irrigation and lighting and replacement with asphalt pavement to provide a left-turn pocket (as an extension of the existing southbound left-turn pocket on Lakewood Boulevard at the Downey Studios driveway); Construction of small raised center island on Columbia Way on the east side of Lakewood Boulevard (as a refuge for pedestrians and for proposed traffic signal equipment); and Modification of existing traffic signal on Lakewood Boulevard at the Downey Studios intersection, street lighting, landscaping and irrigation and signing and striping. FINANCIAL IMPACT : Based on the construction cost estimate, the total cost for the Lakewood Boulevard at Columbia Way Intersection Improvement Project will be $211,000. This includes the cost of design, construction management and inspection, construction and a 10% contingency. Currently, $170,000 is programmed for this project in the FY 2011 Capital Improvement Program, consisting of Gas Tax funds under Account No. 26-16673. Additional funds may be appropriated in conjunction with the contract award, depending on the construction bids received. A detailed funding summary for the project will be presented at the time of the contract award. Attachment: Project Location Map S:\AgendaMemosCC2011\4-26-11\SS625-Lakewood Bl at Columbia Way Intersection Improvement Project (Auth to Bid)