SUBJECT:RECOMMENDATION TO ACCEPT COMPLETION OFCASH
CONTRACT NO. S.S. 599 - IMPERIAL HIGHWAY TRAFFIC
THROUGHPUT AND SAFETY ENHANCEMENTS PROJECT - PHASE 2;
AND TO DIRECT THE PUBLIC WORKS DIRECTOR TO FILE THE
NOTICE OF COMPLETION
RECOMMENDATION:
That the City Council accept the improvements constructed under Cash Contract No.
S.S. 599, approve the final construction contract amount of $3,206,924.55 and direct
the Public Works Director to file the Notice of Completion.
BACKGROUND
On December 15, 2009, the City Council awarded Cash Contract No. S.S. 599 to Sialic
Contractors Corporation dba Shawnan for the Imperial Highway Traffic Throughput and
Safety Enhancements Project in the amount of $2,981,662.
The Imperial Highway Traffic Throughput and Safety Enhancements Project entailed
improvements along Imperial Highway between Paramount Boulevard and the west city
limit and between Bellflower Boulevard and the east city limit to increase vehicle
throughput, enhance traffic safety and improve the aesthetics and visual appearance of
the Imperial Highway Corridor. The first phase of this project which included the portion
of Imperial Highway between Bellflower Boulevard and Paramount Boulevard, was
completed in August 2007.
DISCUSSION:
As of March 31, 2011, all work under Cash Contract No. S.S. 599 has been completed
per previously approved plans and specifications and to the satisfaction of the City.
Thus, the project is deemed complete, and staff recommends releasing the remaining
contract funds (retention) to Shawnan.
The second phase of the Imperial Highway Traffic Throughput and Safety Enhancements
Project included the following elements and features:
Construction of new raised landscaped median islands within the project limits;
New landscaping of the existing median islands within the project limits;
CITY OF DOWNEY, CALIFORNIA
Mayor and Members of the City Council
Cash Contract No. S.S. 599 - Imperial Highway Traffic
Throughput and Safety Enhancements Project - Phase 2
April 12, 2011
Page 2
Installation of irrigation systems with the state-of-the-art intelligent irrigation
controllers;
Pavement rehabilitation along Imperial Highway between Downey Avenue and
the west city limit;
Minor widening of Imperial Highway at Paramount Boulevard and Downey
Avenue intersections and along the south side of Imperial Highway between
Coldbrook Avenue and Woodruff Avenue;
Construction of concrete masonry wall, sidewalk, curb ramps and
landscaping/irrigation improvements along the frontage road island on the south
side of Imperial Highway between Coldbrook Avenue and Woodruff Avenue;
Traffic signal upgrades and modifications at impacted intersections;
Construction of curb ramps, sidewalks and miscellaneous concrete
improvements at various locations; and
Streetlights and utility relocations at various locations.
FINANCIAL IMPACT:
The final cost of the construction work, including all change orders and a net decrease
in contract quantities, is $3,206,924.55. The total authorized amount by the City
Council for the project work, which included a ten percent contingency, was $3,279,828.
The total final project cost is $3,814,229.10, which includes all design, construction,
engineering, contract administration, and inspection costs. Sufficient funding is
available for all items of work for this project, as detailed in the following table:
Mayor and Members of the City Council
Cash Contract No. S.S. 599 - Imperial Highway Traffic
Throughput and Safety Enhancements Project - Phase 2
April 12, 2011
Page 3
CONSTRUCTION CONTRACT COST SUMMARY
Description Amount
Base Contract Amount $2,813,717.80
Decrease in Contract Quantities <$168,490.20>
Contract Change Order $393,752.75
TOTAL CONSTRUCTION CONTRACT COST $3,206,924.55
TOTAL PROJECT COST SUMMARY
Description Amount
Total Construction Contract Cost $3,206,924.55
Design Consultant Services $223,960.04
City-furnished Street Materials $55,526.64
Construction Engineering & Contract Administration $327,817.87
TOTAL PROJECT COST: $3,814,229.10
PROJECT FUNDING
Total
Fund Account Number
Federal TE Grant 54-1-6599 $1,466,000.00
Proposition 1B 54-1-6599 $1,000,000.00
Proposition C Local Return 54-1-6599 $1,002,610.00
Gas Tax 54-1-6599 $199,751.00
Gas Tax 26-1-6599 $200,000.00
TOTAL PROJECT FUNDING: $3,868,361.00
FUNDING SURPLUS: $54,131.90