HomeMy WebLinkAbout08. Cash Contract S.S. 576 Paramount Pave Rehab AGENDA MEMO DATE: February 8, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:RECOMMENDATION TO ACCEPT COMPLETION OFCASH CONTRACT NO. S.S. 576 - PARAMOUNT BOULEVARD PAVEMENT REHABILITATION PROJECT; AND TO DIRECT THE PUBLIC WORKS DIRECTOR TO FILE THE NOTICE OF COMPLETION RECOMMENDATION: That the City Council accept the improvements constructed under Cash Contract No. S.S. 576, approve the final construction contract amount of $688,433.81 and direct the Public Works Director to file the Notice of Completion. BACKGROUND On September 14, 2010, the City Council awarded Cash Contract No. S.S. 576 to Hardy & Harper, Inc. for the Paramount Boulevard Pavement Rehabilitation Project, from Brookmill Road to Alameda Street, in the amount of $625,000. The goal of the project was to extend the life of the roadway pavement, enhance accessibility for pedestrians, improve drainage, and eliminate potentially hazardous conditions. The improvements constructed under the Paramount Boulevard Pavement Rehabilitation Project included the following items: Reconstruction/resurfacing of deteriorated pavement; Construction of curb ramps at intersections to enhance accessibility; Reconstruction of non-standard driveway approaches and sidewalk to comply with Americans with Disabilities Act (ADA) standards and the repair of uplifted sidewalk, curb ramps, driveway approaches and curb and gutter; Reconstruction of deteriorated cross gutters; Installation of communications conduit for future communications between City Hall and Fire Station 1, water well sites, and signalized intersections along Paramount Boulevard; and Incidental replacement of traffic loop detectors, pavement markings and striping. DISCUSSION: Included in the final cost is one $5,331.10 change order, paid on a force-account basis, for the repair of an unmarked sewer line that was damaged during the installation of the communication conduit, as well as excavation to expose another sewer line to assess its condition. In addition, Hardy & Harper, Inc. was assessed $2,000 in liquidated damages for exceeding the contractual number of working days by four (4) days. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. S.S. 576 – Paramount Boulevard Pavement Rehabilitation February 8, 2011 Page 2 As of December 13, 2010, all work under Cash Contract No. S.S. 576 has been completed per previously approved plans and specifications and to the satisfaction of staff; therefore, the project is deemed complete. Staff is satisfied with the final product and recommends releasing the remaining funds to Hardy & Harper, Inc. FINANCIAL IMPACT: The final cost of the construction work, including the change order, liquidated damages and a net increase in contract quantities, is $688,433.81. The original construction contract amount was $625,000. The total authorized amount by the City Council for the construction work, which included a $100,000 (16%) contingency, was $725,000. The total final project cost is $821,103.03, which includes all design, construction, contract administration, material testing, and inspection costs. Sufficient funding is available for all items of work for this project, as detailed in the following table: CONSTRUCTION CONTRACT COST SUMMARY DescriptionAmount Base Contract Amount $625,000.00 Contract Change Order $5,331.10 Liquidated Damages $500 Per Day For Four Days ($2,000.00) @ Increase in Contract Quantities $ 60,102.71 TOTAL CONSTRUCTION CONTRACT COST $688,433.81 TOTAL PROJECT COST SUMMARY DescriptionAmount Total Construction Contract Cost $688,433.81 Design, Inspection, Material Testing, Construction Engineering & Contract Administration $132,669.22 TOTAL PROJECT COST: $821,103.03 PROJECT FUNDING Account NumberProp CSAFETEA-LUTotal 54-1-6576$182,400 $645,000 $827,400.00 TOTAL PROJECT FUNDING: $827,400.00 FUNDING SURPLUS: $6,296.97 S:\AgendaMemosCC2011\02-08-11\SS 576 Accept and Approve Final Construction and File NOC.doc