Loading...
HomeMy WebLinkAbout06. Cash Contract S.S. 590 Paramount Fiberoptic Contract AGENDA MEMO DATE: December 14, 2010 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECTCASH CONTRACT NO. S.S. 590 – AWARD CONSTRUCTION : CONTRACT FOR THE PARAMOUNT BOULEVARD FIBEROPTIC COMMUNICATION SYSTEM, PHASE 1 PROJECT RECOMMENDATION: That the City Council: 1. Award Cash Contract No. S.S. 590, in the amount of $578,550.66, to C.T. & F., Inc. for the Paramount Boulevard Fiberoptic Communication System, Phase 1 Project, and 2. Appropriate $427,400 from the Measure R Fund and $121,500 from the Gas Tax Fund for this project. BACKGROUND: The City has been building and maintaining a fiberoptic traffic signal communications system for the purposes of facilitating the efficient and orderly movement of traffic and to enable remote surveillance capabilities of traffic operations along the City’s arterial streets. Fiberoptic systems are currently in-place along Firestone Boulevard between Ryerson Avenue and Stewart and Gray Road, along Lakewood Boulevard between Gallatin Road and Gardendale Street and along other arterials within the City. This project will construct a similar system along Paramount Boulevard between the north and south City limits (Telegraph Road and Lubec Street). Due to funding limitations, the implementation of the system along Paramount Boulevard is being phased, with the first phase located between Telegraph road and Lubec Street. This phase of work is approximately one mile in length and includes the six (6) signalized intersections along Paramount Boulevard at Telegraph Road, Vista Del Rosa Street, I-5 Northbound On-Off Ramps, Gallatin Road, Suva Street and Lubec Street. The second phase of the project will include the installation of fiberoptic communications as well as modifications to the eleven signalized intersections along Paramount Boulevard between Florence Avenue and Gardendale Street. DISCUSSION: The main objectives of the project are: (1) to enhance traffic safety by upgrading traffic signals at the six (6) signalized intersections along Paramount Boulevard at Telegraph Road, Vista Del Rosa Street, I-5 Northbound On-Off Ramps, Gallatin Road, Suva Street and Lubec Street through the replacement of existing pavement detection loops with CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. S.S. 590 – Paramount Boulevard Fiberoptic Communication System, Phase 1 Project December 14, 2010 Page 2 video detection and other equipment upgrades as necessary; (2) to expand the City’s traffic signal system through the installation of traffic signal communication trunk line, similar to the systems previously implemented along Firestone Boulevard and Lakewood Boulevard; and (3) to enhance traffic flow and operations along Paramount Boulevard through remote surveillance. The communication system will interconnect the traffic signals on Paramount Boulevard and provide two-way video and data transmission between the field and the City’s Traffic Management Center (TMC). In addition, the City’s Water Well No. 4 will be tied into the communication system in order to provide two-way communication between the well site and City Hall and eventually, the Utilities Yard. The location of this project is shown on the attached Vicinity Map. On November 9, 2010, the City Council approved the plans and specifications and granted authority to advertise for bids for Cash Contract No. S.S. 590 – Paramount Boulevard Fiberoptic Communication System, Phase 1. On December 2, 2010, five (5) bids were received as shown on the attached bid summary. The apparent lowest responsive bidder was C.T. & F., Inc. with a bid of $578,550.66. C.T. & F., Inc. has satisfactorily completed similar projects for the Cities of Los Angeles, Newport Beach, Torrance, Santa Monica and Los Angeles County. Staff has verified that C.T. & F., Inc. carries the appropriate contractor’s license and possesses the necessary expertise and resources to complete this project. The construction phase of the project will commence in January of 2011 after the issuance of a Notice-to-Proceed, and completion is anticipated in June of 2011. It is anticipated that the first four (4) months of the construction phase will be the project materials procurement period, therefore; there will be limited construction activities, such as installation of underground conduit, traffic signal pole and cabinet foundations, and pull boxes during this period. In order to minimize the possibility of a period of time with no productivity, the Contractor will be issued two separate notices to proceed, one to start the materials procurement phase of the project, and a second one for the major construction activities. The Contractor will be required to start the second phase of work (major construction activities) immediately after completion of materials procurement and complete it within two (2) months. FINANCIAL IMPACT: Based on the construction cost estimate, the total cost for the Paramount Boulevard Fiberoptic Communication System, Phase 1 Project will be $803,900. This includes the cost of construction, project administration, inspection and materials testing services, Mayor and Members of the City Council Cash Contract No. S.S. 590 – Paramount Boulevard Fiberoptic Communication System, Phase 1 Project December 14, 2010 Page 3 City furnished material and contingencies. This project will be funded through a variety of sources, including Proposition C Local Return, Measure R and Gas Tax. A detailed cost summary for the project is provided herein. CONTRACT COST SUMMARY Description Amount Base Construction Contract Amount $578,551 Contingency @ 10% $57,855 SUBTOTAL CONSTRUCTION CONTRACT COST:$636,406 Design, Construction Engineering, Inspection, $52,494 Materials Testing & Contract Administration City-Furnished Material$115,000 $803,900 TOTAL PROJECT COST: PROJECT FUNDING Account No.Measure RGas TaxProp Cmount A 26-16623$427,400$427,400 $100,000 54-16590$100,000 $100,000 26-16684$100,000 $95,000 26-16579$95,000 $60,000 26-16594$60,000 $21,500 26-16612$21,500 $427,400$276,500$100,000$803,900 $803,900 TOTAL PROJECT FUNDING: Attachment: Bid Summary S:\AgendaMemosCC2010\12-14-10\SS590 Phase 1 Award Construction Contract ùûéôùíîèêûùèîíéé ìÛÊÛÏÍÇÎÈúÍÇÐ×ÆÛÊØöÓÚ×ÊíÌÈÓÙùÍÏÏÇÎÓÙÛÈÓÍÎéÃÉÈ×Ï úóøéçïïûêã ø×Ù×ÏÚ×Ê  Engineer's EstimateFlatiron Electric Group, Inc. ùèöóÎÙ ItemDescriptionQty.UnitUnit PriceAmount Unit PriceAmount çÎÓÈìÊÓÙ×ûÏÍÇÎÈ úûéóùúóø Traffic Control and Mobilization1LS 1$ 6,500.006,500.00$ $ 10,000.0010,000.00$    Install City-Furnished Video Detection Unit (including camera, video detection processing unit, cables, and mounting hardware)22EA 2$ 22,000.001,000.00$ $ 15,840.00720.00$    Furnish & Install RS232 to Ethernet Converter6EA 3$ 6,000.001,000.00$ $ 2,610.00435.00$      Furnish & Install 10 Base-T/100 Base-T Ethernet Switch6EA 4$ 7,200.001,200.00$ $ 12,720.002,120.00$      Furnish & Install Fiber Patch Panel6EA 5$ 6,000.001,000.00$ $ 7,800.001,300.00$    Furnish & Install Optical Fiber – 6 fibers (Drop Cable)560LF 6$ 1,120.002.00$ $ 672.001.20$     Furnish & Install Optical Fiber – 24 fibers (Backbone Cable)6,490LF 7$ 16,225.002.50$ $ 8,437.001.30$      Furnish & Install Optical Fiber – 48 fibers (Distribution Cable)6,490LF 8$ 19,470.003.00$ $ 12,331.001.90$    Furnish and Install #10 Conductors150LF 9$ 225.001.50$ $ 315.002.10$    Furnish & Install Type 334 Cabinet1EA 10$ 10,000.0010,000.00$ $ 20,000.0020,000.00$     Furnish & Install Gigabit Ethernet Switch1EA 11$ 6,000.006,000.00$ $ 60,000.0060,000.00$     Furnish & Install Fiber Distribution Unit2EA 12$ 2,000.001,000.00$ $ 7,600.003,800.00$    Furnish & Install 3’X5’ (Splice) Vault1EA 13$ 2,500.002,500.00$ $ 6,000.006,000.00$     Furnish & Install #6 Pull Box with Extension10EA 14$ 8,500.00850.00$ $ 6,000.00600.00$     Furnish & Install Splice Enclosures7EA 15$ 11,900.001,700.00$ $ 9,800.001,400.00$      Furnish & Install 2” PVC Sch 40 Conduit by open trenching and/or jacking and boring 310LF 16$ 21,700.0070.00$ $ 9,920.0032.00$    Furnish & Install one 4” PVC Sch 40 Conduit w/ four 1.25” innerducts by open trenching or jacking and boring method5,450LF 17$ 109,000.0020.00$ $ 125,350.0023.00$     Furnish & Install one 4” PVC Sch 40 empty (spare) conduit with pull rope by open trenching or jacking and boring method5,450LF 18$ 27,250.005.00$ $ 21,800.004.00$    Remove all existing SIC and DLC’s in existing conduits per intersection5EA 19$ 7,500.001,500.00$ $ 6,500.001,300.00$      Upgrade Traffic Signal at Paramount Boulevard / Lubec Street1LS 20$ 45,100.0045,100.00$ $ 37,000.0037,000.00$       Upgrade Traffic Signal at Paramount Boulevard / Suva Street1LS 21$ 31,500.0031,500.00$ $ 22,000.0022,000.00$      Upgrade Traffic Signal at Paramount Boulevard / Gallatin Road1LS 22$ 49,400.0049,400.00$ $ 37,000.0037,000.00$     Upgrade Traffic Signal at Paramount Boulevard / Vista del Rosa Street1LS 23$ 12,900.0012,900.00$ $ 10,000.0010,000.00$       Upgrade Traffic Signal at Paramount Boulevard / Telegraph Road1LS 24$ 60,600.0060,600.00$ $ 47,000.0047,000.00$      Retrofit Existing Pedestrian Head23EA 25$ 9,200.00400.00$ $ 7,245.00315.00$       Testing, System Integration, Documentation Training1LS 26$ 6,610.006,610.00$ $ 77,000.0077,000.00$   Allowance for Caltrans Double Permit Encroachment Fees1LS 27$ 600.00600.00$ $ 600.00600.00$     èíèûðúûé÷úóø¦óÈ×ÏÉ ÈÍ          % Difference Between This Bid and Lowest Bidder:0.52% % Difference Between This Bid and Previous Low Bidder:0.52% íèô÷êúóøéê÷ù÷óæ÷ø Dynalectric$ 698,811.54 California Professional Engineering, Inc.$ 782,566.50 MSL Electric, Inc.$ 788,612.00