Loading...
HomeMy WebLinkAbout07. Cash Contract S.S. 622 Advertise AGENDA MEMO DATE: November 9, 2010 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECTCASH CONTRACT NO. S.S. 622 : CITYWIDE RESIDENTIAL STREET RESURFACING PROJECT APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT BIDS RECOMMENDATION: That the City Council approve plans and specifications and authorize solicitation for bids for Cash Contract No. S.S. 622 – Citywide Residential Street Resurfacing Project. BACKGROUND: The City implements pavement resurfacing of its residential streets on a recurring basis in order to extend the life of the infrastructure by a minimum of 20 years. The City’s Pavement Management System evaluates, ranks and prioritizes each City street segment based on surface conditions (cracking, surface failures, etc.), pavement structural strength, and other field observations. Street segments earmarked for improvements are selected based on the condition of the pavement for a given street segment relative to the pavement condition of other street segments throughout the City. DISCUSSION: The residential streets programmed under this project include 38 segments with a total length of approximately 4.1 miles. The locations of the various residential street segments are shown on the attached Project Location Map. The street resurfacing work to be completed through this project generally consists of the reconstruction of failed pavement areas, removal and reconstruction of asphalt concrete base course adjacent to concrete gutters, cold milling of asphalt pavement, and the installation of an asphalt concrete overlay. In addition, uplifted or damaged curb, gutter, cross gutters, sidewalk, driveway approaches and ramps will be repaired or replaced. The plans, specifications and construction cost estimate for this project are complete and the City is ready to solicit bids for construction. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. S.S. 622 - Citywide Residential Street Resurfacing Project November 9, 2010 Page 2 FINANCIAL IMPACT: Based on the construction cost estimate, the total cost for the Citywide Residential Street Resurfacing Project will be $1,500,000. This includes the cost of design, construction, project administration, inspection and contingencies. Sufficient funds for this project are programmed in the Fiscal Year 2010/2011 Capital Improvement Program under Account No. 26-16622. The funding source is Gas Tax. A detailed summary of estimated project costs and funding will be presented to the City Council at the time of the award of the construction contract. Attachment: Project Location Map S:\AgendaMemosCC2010\11-09-10\SS622 (Advertise)