Loading...
HomeMy WebLinkAbout05. Cash Contract 676A Smallwood Abate Accept AGENDA MEMO DATE: September 14, 2010 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:CASH CONTRACT NO. 676A – SMALLWOOD TRANSIT YARD ASBESTOS AND LEAD ABATEMENT PROJECT RECOMMENDATION: That the City Council accept the improvements constructed under Cash Contract No. 676A, and approve the final construction contract amount of $26,089. DISCUSSION: On May 11, 2010, the City Council awarded Cash Contract No. 676A to Specialized Environmental, Inc. for the abatement of lead and asbestos containing material at the Smallwood Transit Yard facility in the amount of $18,952. Prior to the start of the abatement work, additional testing of asbestos-containing materials such as floor tile, floor mastic, exterior stucco, wall plaster and window putty was conducted to verify the results of tests that were performed in 2003. Test results determined that the asbestos content in the exterior stucco material was below the regulated levels currently in place, indicating that the material did not need to be abated. The elimination of the exterior stucco abatement activities from the original scope of work resulted in a cost savings of $12,000. Staff met with Specialized Environmental, Inc. and requested a quote for the demolition and disposal of the entire Transit Yard including the structures, concrete slabs and asphalt concrete pavement. The quote received was for $18,000 and on June 22, 2010, the City Council authorized the issuance of a contract change order for the demolition of the facility. The abatement work was satisfactorily completed without any additional costs. The demolition work was also satisfactorily completed; however, Specialized Environmental, Inc. did request and received approval for additional compensation in the amount of $1,500 for the removal of unforeseen buried asphalt pavement below the existing structures at the facility. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. 676-A - Smallwood Transit Yard Asbestos and Lead Abatement Project September 14, 2010 Page 2 FINANCIAL IMPACT: The final cost of the construction work, including all change orders and a net decrease in contract quantities, is $26,089. The total authorized amount by the City Council for the abatement and demolition work, which included a 15 percent contingency, was $28,695. The total final project cost is $37,382, which includes all construction, engineering, contract administration, and inspection costs. Sufficient funding is available for all items of work for this project, as detailed in the following table: CONSTRUCTION CONTRACT COST SUMMARY Description Amount Abatement of Lead and Asbestos $18,952 Demolition of Buildings and Pavement $18,000 Removal of Buried Asphalt Pavement $ 1,500 Reduction in Scope of Work (Eliminated Abatement of Stucco) $ -12,000 Decrease in Contract Quantities $ - 363 TOTAL CONSTRUCTION CONTRACT COST $26,089 TOTAL PROJECT COST SUMMARY Description Amount Total Construction Contract Cost $26,089 Environmental Consultant Services $ 7,430 Construction Engineering & Contract Administration $ 3,863 TOTAL PROJECT COST: $37,382 PROJECT FUNDING Total Acct. No. Water Fund 51-1-8665 $51,900 $51,900 TOTAL PROJECT FUNDING: $51,900 FUNDING SURPLUS: $14,518 S:\AgendaMemosCC2010\09-14-10\CC767A Smallwood Abatement