HomeMy WebLinkAbout04. Cash Contract S.S. 575 Paramount Pavement AGENDA MEMO DATE: September 14, 2010 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT: CASH CONTRACT NO. S.S. 576 PARAMOUNT BOULEVARD PAVEMENT REHABILITATION PROJECT - BROOKMILL ROAD TO ALAMEDA STREET RECOMMENDATION: That the City Council award Cash Contract No. S.S. 576 in the amount of $625,000 to Hardy & Harper, Inc., for the Paramount Boulevard Pavement Rehabilitation Project from Brookmill Road to Alameda Street. DISCUSSION: On July 13, 2010, the City Council approved Plans and Specifications and granted authority to advertise for bids for the Paramount Boulevard Pavement Rehabilitation Project from Brookmill Road to Alameda Street under Cash Contract No. S.S. 576. Eleven bids were received on August 24, 2010, as shown on the attached Bid Summary. The low bid of $625,000, submitted by Harper & Harper, Inc., is approximately 4% higher than the Engineer’s Estimate. Hardy & Harper, Inc. of Santa Ana has satisfactorily completed various similar pavement resurfacing projects for other municipalities, including the Cities of Pomona, Torrance, Irvine, Glendora, Temecula, Signal Hill, Upland, Ontario, Fontana, and Westminster. The proposed work will generally consist of cold milling the existing asphalt pavement and resurfacing with a 1-3/4 to 2-inch asphalt rubber hot mix surface course on a suitably treated and stabilized base course. The project also includes the replacement of damaged concrete improvements, construction of new ADA compliant ramps and facilities, adjustment of utility boxes and covers to grade, and replacement of traffic signal loops, striping, pavement markings, installation of traffic signal communication conduit and pull boxes, and tree trimming, pruning and installation of root barriers at street tree locations. The project location is shown on the attached vicinity map. Construction is tentatively scheduled to begin the first week of October and be substantially complete prior to the Thanksgiving holiday. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council SS 576 – Paramount Boulevard Pavement Rehabilitation Project September 14, 2010 Page 2 FINANCIAL IMPACT: The FY 2010-11 Capital Improvements Budget has a current balance of $148,000 in the Proposition “C” Local Return Fund and $645,000 in Federal Surface Transportation Program –Local (STPL) funds for this project, for a total of $793,000. The estimated cost and funding for this project is summarized below. ESTIMATED PROJECT COST Bid Amount $ 625,000 Contingencies $ 100,000 TOTAL CONTRACT WORK: $ 725,000 Construction Engineering, Inspection, Material Testing & Contract Admin. $ 68,000 TOTAL PROJECT COST: $ 793,000 FUNDING Prop “C” Local Return Acct. 54-16576 $ 148,000 STPL Acct., 54-16576 $ 645,000 TOTAL PROJECT FUNDING $ 793,000 Attachments: Bid Summary Vicinity Map S:\AgendaMemosCC2010\09-14-10\SS576 Council Award úóøéçïïûêã ùûéôùíîèêûùèîíéé ìÛÊÛÏÍÇÎÈúÍÇÐ×ÆÛÊØìÛÆ×Ï×ÎÈê×ÔÛÚÓÐÓÈÛÈÓÍÎ ûÇÕÇÉÈ  Excel PavingAll American Asphault ôÛÊØÃôÛÊÌ×ÊóÎÙ ItemDescriptionQty.UnitUnit PriceAmount Unit PriceAmount çÎÓÈìÊÓÙ×ûÏÍÇÎÈ úûéóùúóø Traffic Control & Mobilization 1 1LS$ 51,500.0051,500.00$ 59,431.72$ 59,431.72$       Concerete and Bituminous Pavement Removal 300 2CY$ 21,450.0071.50$ 120.00$ 36,000.00$      Unclassified Excavation 300 3CY$ 6,150.0020.50$ 44.00$ 13,200.00$     Cold Mill Existing AC Pavement 2-inch uniform depth 157,902 4SF$ 23,685.300.15$ 0.20$ 31,580.40$       Cold Mill Existing AC Pavement 2.5-inch uniform depth11,417SF 5$ 1,940.890.17$ 0.20$ 2,283.40$       Cold Mill Existing AC Pavement 5-inch uniform depth50,617SF 6$ 26,320.840.52$ 0.44$ 22,271.48$      Construct Asphalt Rubber Hot Mix Course (ARHM)1,813TONS 7$ 146,853.0081.00$ 79.00$ 143,227.00$     Construct 3/4-inch Asphalt Concrete (AC) leveling course750TONS 8$ 59,250.0079.00$ 72.00$ 54,000.00$  Construct Asphalt Concrete (AC) Pavement1,500TONS 9$ 97,500.0065.00$ 67.00$ 100,500.00$    Construct Crushed Miscellaneous Base (CMB)340CY 10$ 16,660.0049.00$ 40.00$ 13,600.00$      Construct PCC curb and gutter, type A2-8 per SPPWC Std. Plan No. 120-2, W=2' (Modified to variable Curb 300LF Face) 11$ 9,600.0032.00$ 16.00$ 4,800.00$      Remove and construct local depression at catch basin per 1LS SPPWC Standard Plan No. 313-3, case per plan 12$ 1,050.001,050.00$ 1,300.00$ 1,300.00$     Construct 4 inches thick PCC sidewalk - Slab2,500SF 13$ 13,125.005.25$ 4.33$ 10,825.00$    Construct PCC curb ramp with Cast in Place Detectable Warning Surface per SPPWC Std. Plan No. 111-4, case 1,300SF and type per plan 14$ 13,000.0010.00$ 4.50$ 5,850.00$     Construct 4 inches thick PCC residential driveway, per 1,200SF City Std. Dwg. No. 19 15$ 6,300.005.25$ 4.50$ 5,400.00$    Construct 6 inches thick PCC commercial driveway per 500SF City Std. Dwg. No. 20, Alley Intersection and Slab 16$ 3,250.006.50$ 5.50$ 2,750.00$   Construct 8 inches thick PCC cross gutter and spandrel 1,000SF over 8-inch thick CMB 17$ 9,000.009.00$ 8.00$ 8,000.00$   Adjust Manhole Frame and Cover to Grade16EA 18$ 7,200.00450.00$ 550.00$ 8,800.00$     Adjust Water Valve, Gas Valve, and Survey Monument 21EA Frame and Cover to Grade 19$ 4,620.00220.00$ 420.00$ 8,820.00$      Furnish and Install Type E Traffic Loop Detectors15EA 20$ 3,525.00235.00$ 250.00$ 3,750.00$      Furnish and Install #6 Pull Box with Extension7EA 21$ 5,250.00750.00$ 750.00$ 5,250.00$     Furnish and Install 2" PVC Schedule 40 Conduit by Open 100LF Trenching and/or Jacking or Boring 22$ 6,000.0060.00$ 59.00$ 5,900.00$     Furnish and Install One 4" PVC Schedule 40 Conduit w/four 1.25" Innerducts by Open Trenching and/or jacking 3,500LF or Boring 23$ 73,500.0021.00$ 20.00$ 70,000.00$     Furnish and Install One 4" PVC Schedule 40 Empty (spare) Conduit with Pull Rope by Open Trenching and/or 3,500LF Jacking or Boring 24$ 11,375.003.25$ 3.27$ 11,445.00$     Traffic Signing1LS 25$ 105.00105.00$ 105.00$ 105.00$       Pavement Markings (2 coats)3,700SF 26$ 5,180.001.40$ 1.50$ 5,550.00$    Traffic Striping (2 coats)10,000LF 27$ 5,000.000.50$ 0.50$ 5,000.00$     èíèûðúûé÷úóø       % Difference Between This Bid and Lowest Bidder:0.54%2.34% % Difference Between This Bid and Previous Low Bidder:0.54%1.79% ùíêê÷ùèóíîé N/A íèô÷êúóøéê÷ù÷óæ÷ø Silvia Construction, Inc.$ 657,878.36 Sully Miller$ 671,668.90 SoCal Engineers$ 682,573.14 EBS, Inc.$ 699,730.45 Griffith Company$ 710,690.66 Shawnan$ 746,493.20 Sequel Contractors$ 747,490.23 Gentry Brothers$ 991,435.14 H:\Pubworks\CAPIMP\SS576 Paramount Rehab\Bid Solicitation\SS576 Bid Sum