AGENDA MEMO
DATE:
June 8, 2010
TO:
Mayor and Members of the City Council
FROM:
Office of the City Manager
By: Brian A. Ragland, Director of Public Works
SUBJECT: PROGRAM SUPPLEMENT AGREEMENTS FOR CASH CONTRACT
NO. 632-3A AND S.S. 599
RECOMMENDATION:
That the City Council adopt:
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY APPROVING
PROGRAM SUPPLEMENT NOS. 025-N AND 026-N TO THE CITY OF DOWNEY - STATE
MASTER AGREEMENT NO. 07-5334R FOR THE LAKEWOOD BOULEVARD
IMPROVEMENTS PROJECT - PHASE 3A (CASH CONTRACT NO. 632-3A) AND IMPERIAL
HIGHWAY TRAFFIC THROUGHPUT AND SAFETY ENHANCEMENTS PROJECT - PHASE 2
(CASH CONTRACT NO. S.S. 599)
DISCUSSION:
Public agencies utilizing federal funds for highway-related projects are required to
execute a Program Supplement Agreement (PSA) with the California Department of
Transportation (Caltrans) prior to invoicing Caltrans for federal funds expended on the
project. The purpose of the PSA is to specify the terms and conditions of the specific
details of the project between the state and the local agency in order to allow the fund
transfer to occur. Both the Lakewood Boulevard Improvements Project – Phase 3A
(Cash Contract No. 632-3A) and the Imperial Highway Traffic Throughput and Safety
Enhancements Project – Phase 2 (Cash Contract No. S.S. 599) are federally-funded
City projects requiring the execution of PSAs.
The Lakewood Boulevard Improvement Project – Phase 3A will extend the
th
improvements previously made to the Lakewood Boulevard corridor south of 5 Street
th
to the north between 5 Street and Florence Avenue. This project will also receive
federal funds through the American Recovery and Reinvestment Act (ARRA) as well as
an earmark received through the Safe, Accountable, Flexible, Efficient Transportation
Equity Act – A Legacy for Users (SAFETEA-LU). This project phase includes the
following improvements:
Minor widening to provide three twelve–foot travel lanes in each direction in order
to increase vehicle capacity and throughput;
Landscaping in both the center median islands and parkways, identical to the
th
landscaping scheme implemented along prior project phases south of 5 Street,
to improve the aesthetics of the corridor;
CITY OF DOWNEY, CALIFORNIA
Mayor and Members of the City Council
Program Supplement Agreements for Cash Contracts No. 632-3A & SS.599
June 8, 2010
Page 2
Installation of decorative street lighting within the center island medians and
pedestrian sidewalk lighting within the parkways to further enhance safety and
aesthetics;
Construction of a recycled water main to irrigate the proposed landscaping and
serve future customers in the area; and
Resurfacing of existing asphalt concrete and repair of miscellaneous concrete
surfaces to extend the life of the infrastructure by a minimum of 20 years.
The Imperial Highway Traffic Throughput and Safety Enhancements Project is intended
to increase vehicle throughput, enhance traffic safety and improve the aesthetics and
visual appearance of the Imperial Highway Corridor through a series of raised
landscaped median islands and associated improvements. The limits of this project
include the segments of Imperial Highway between Paramount Boulevard and the west
city limit and between Bellflower Boulevard and the east city limit. This project, currently
under construction, includes the following elements and features:
The construction of new raised landscaped median islands within the project
limits where they currently don’t exist;
The re-landscaping of the existing median islands within the project limits;
Lighted City entry monument signs;
Rehabilitation of the existing pavement between Downey Avenue and the west
city limit;
Minor widening of the Imperial Highway at Paramount Boulevard and Downey
Avenue intersections and along Imperial Highway between Coldbrook Avenue
and Woodruff Avenue to provide sufficient width for standard eleven foot wide
lane widths and U-turns in the eastbound and westbound directions at
intersections;
The construction of a concrete masonry wall, sidewalk and landscaping/irrigation
along the frontage road island on the south side of Imperial Highway between
Coldbrook Avenue and Woodruff Avenue;
Traffic signal improvements and modifications at impacted intersections;
The construction of curb ramps and miscellaneous concrete improvements at
various locations;
Mayor and Members of the City Council
Program Supplement Agreements for Cash Contracts No. 632-3A & SS.599
June 8, 2010
Page 3
Streetlights and utility relocations at various locations; and
Signing and striping modifications as necessary.
FINANCIAL IMPACT:
The Engineer’s Estimate for Cash Contract No. 632-3A, is $5,383,740. This amount
has been programmed in the FY 2010-11 Capital Improvement Program, consisting of
$3,317,000 in ARRA (Federal Economic Stimulus) Tier One funds, $1,439,840 in
SAFETEA-LU Federal Earmark funds and $1,011,567 in Gas Tax funds.
Based on the construction contract awarded for Cash Contract No. S.S. 599, the
construction cost, which includes inspection and construction engineering and
management costs, is estimated at $3,668,361. This amount has been programmed in
the FY 2009-10 Capital Improvement Program, consisting of a $1,466,000 Federal
Transportation Enhancements (TE) Grant, $1,000,000 in Proposition 1B funds,
$1,002,610 in Proposition C Local Return funds and $199,751 in Gas Tax Funds.
Attachments:
Resolution
Program Supplement Agreement No. 025-N
Program Supplement Agreement No. 026-N
S:\AgendaMemosCC2010\06-08-10\Cash Contract No. SS 599 & CC632 3A PSA.doc
RESOLUTION NO.
______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY APPROVING
PROGRAM SUPPLEMENT NOS. 025-N AND 026-N TO THE CITY OF DOWNEY -
STATE MASTER AGREEMENT NO. 07-5334R FOR THE LAKEWOOD BOULEVARD
IMPROVE-MENTS PROJECT - PHASE 3A (CASH CONTRACT NO. 632-3A) AND
IMPERIAL HIGHWAY TRAFFIC THROUGHPUT AND SAFETY ENHANCEMENTS
PROJECT - PHASE 2 (CASH CONTRACT NO. S.S. 599)
WHEREAS
, the City Council of the City of Downey has adopted Resolution No. 07-6960
approving the City of Downey - State Master Agreement No. 07-5334R, which covers highway
projects receiving federal aid within the City; and
WHEREAS
, public agencies utilizing federal funds for highway-related projects are
required to execute a Program Supplement Agreement (PSA) with the California Department of
Transportation (Caltrans) prior to invoicing Caltrans for federal funds expended on the project;
and
WHEREAS
, the attached Program Supplement Nos. 025-N and 026-N to the City of
Downey - State Master Agreement No. 07-5334R cover federal aid funding for the Lakewood
Boulevard Improvements Project - Phase 3A (Cash Contract No. 632-3A) and the Imperial
Highway Traffic Throughput and Safety Enhancements Project - Phase 2 (Cash Contract No.
S.S. 599), respectively; and
WHEREAS
, the City of Downey has received authorization from the State of California
Department of Transportation to proceed with construction on these projects.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1.
The City Council of the City of Downey does hereby approve Program
Supplement Agreement Nos. 025-N and 026-N to the City of Downey - State Master Agreement
No. 07-5334R covering funding for construction work on said projects.
SECTION 2.
The City Manager of the City of Downey is hereby authorized and directed
to execute Program Supplement Agreement Nos. 025-N and 026-N on behalf of the City of
Downey.
SECTION 3.
The City Clerk shall certify to the adoption of this resolution and forward
two (2) certified copies of this resolution to the Director of Public Works for transmittal to the
State.
APPROVED AND ADOPTED
this day of June, 2010.
_______________________________
ANNE M. BAYER, Mayor
ATTEST:
___________________________________
KATHLEEN L. MIDSTOKKE, City Clerk
RESOLUTION NO. ______
PAGE TWO
I HEREBY CERTIFY
that the foregoing Resolution was adopted by the City Council of
the City of Downey at a regular meeting held on the _____ day of June, 2010, by the following
vote, to wit:
AYES: Council Members:
NOES: Council Members:
ABSENT: Council Members:
ABSTAIN: Council Members:
KATHLEEN L. MIDSTOKKE, City Clerk