HomeMy WebLinkAbout04b. General Plan rpt
City of Downey
General Plan
Annual Progress
Report
2009
11111 Brookshire Avenue, Downey CA 90241
CITY OF DOWNEY
11111 Brookshire Avenue
Downey CA 90241
CITY COUNCIL
(at the time of adoption)
Anne Marie Bayer, Mayor
District 4
Luis H. Marquez, Mayor Pro-Tem
District 5
David R. Gafin
District 1
Dn. Mario A. Guerra, Mayor
District 2
Roger C. Brossmer
District 3
PLANNING COMMISSION
(at the time of adoption)
Louis Morales, Chairman
District 3
Robert Kiefer, Vice-Chairman
District 2
Michael Murray
District 1
Terry Lambros
District 4
Fernando Vasquez
District 5
CITY STAFF
CITY ADMINISTRATION
Gerald M. Caton
City Manager
Gilbert Livas
Assistant City Manager
COMMUNITY DEVELOPMENT DEPARTMENT
Brian Saeki
Director of Community Development
William E. DavisJohn E. Perfitt
City Planner Economic Development Director
Mark Sellheim, AICP Steven C. Yee
Principal Planner Economic Development Manager
David Blumenthal Ed Velasco
Senior Planner Housing Director
Jessica Halak Linda S. Haines
Assistant Planner II Director of Building and Safety
Kevin Nguyen Rebecca Guerrero
Assistant Planner Executive Secretary
Shion Hori
Assistant Planner
John Lufkin
Planning Intern
Sebastian Rodriguez
Planning Intern
Theresa Donahue
Secretary
This document was prepared by Shion Hori, Assistant Planner
City of Downey General Plan Annual Progress Report 2009
Table of Contents
Introduction………...………………….……………………………………………...……....5
Downey Background
Report Acceptance Date
Community Development Department Activities…….…………..………………...……..7
Planning Division
Building and Safety
Housing
Economic Development
General Plan Implementation Status………………………………………..…………...14
Chapter 1: Land Use
Chapter 2: Circulation
Chapter 3: Housing
Chapter 4: Conservation
Chapter 5: Safety
Chapter 6: Noise
Chapter 7: Open Space
Chapter 8: Design
Chapter 9: Economic Development
4
City of Downey General Plan Annual Progress Report 2009
Introduction
The General Plan Annual Progress Report summarizes the City of Downey’s progress with im-
plementing the goals, policies and programs of Vision 2025, the City’s General Plan. It covers
the period from January 1, 2009 through December 31, 2009.
The report also reviews the activities of the Community Development Department including the
Planning, Building and Safety, Economic Development, and Housing Divisions.
This report is prepared in compliance with California Government Code Section 65400(b)
which mandates that all cities and counties submit to the State Office of Planning and Re-
search an Annual Report on the status and implementation of the general plan.
Downey Background
Downey is 12.8 square miles in area and its topography is relatively level. The City is located in
the southeastern part of Los Angeles County, about 12 miles southeast of downtown Los An-
geles. It is bounded by: the Rio Hondo River channel to the west; Telegraph Road to the north;
the San Gabriel River channel to the east; and Gardendale Street and Foster Road to the
south. Cities bordering Downey include Pico Rivera, Santa Fe Springs, Norwalk, Bellflower,
Paramount, South Gate, and Commerce. The City of Downey is provided regional access by
four interstate highways: the I-605 Freeway, the I-5 Freeway, the I-105 Freeway, and the I-710
Freeway. These freeways provide access to major employment centers including Downtown
Los Angeles and employment centers in Orange County.
The City of Downey has matured from its farming roots and its founding in 1873 to become the
premiere city in the southeast area of Los Angeles County. Downey is one of the larger subur-
ban cities in the region with a population over 113,000 residents and an employment base of
over 55,000 jobs in January 2009. In spite of these larger numbers, the City has retained its
small town character.
The issues addressed by Downey Vision 2025 will work towards achieving this vision by adher-
ing to the value of providing excellent housing, education, employment, and recreation opportu-
nities plus the mission of providing a safe, convenient, and attractive community to those that
live, work, or visit Downey.
Acceptance Date
The 2009 General Plan Annual Progress Report was reviewed by the Planning Commission on
April 21, 2010 and accepted by the City Council on May 11, 2010.
5
Community Development
2009
Department Updates
City of Downey General Plan Annual Progress Report 2009
Community Development Department
Planning Division
This section outlines the activities of the division from January 2009 through December 2009.
The day-to-day planning activities include:
Administrating the City’s Zoning Ordinance (Development Code)
Processing planning applications for the Planning Commission.
Preparing reports for the City Council.
Reviewing development plans for compliance with City standards (Plan Checks)
Signing individual developments for final occupancy (Field Inspections)
Reviewing business registration investigation reports for new businesses
Yearly Counter Activity (1998-2009)
Counter Activity
12,000
11,397
10,968
Counter activity represents the
10,368
10,000
number of counter visits re-
9,612
corded in the Planning Division.
8,448
7,996
Records of counter visits are
8,000
7,489
kept and tracked on a monthly
6,830
basis.
5,769
6,000
5,143
4,454
Some of the highlights related to
4,000
3,551
counter visits in 2009 were:
2,000
Total counter visits in 2009
were 7,489
0
199819992000200120022003200420052006200720082009
Year
Counter visits in 2009 were
down 6.30% from 2008
Counter visits have de-
creased by 34.30% since
2006.
791
745
691
678
667
Monthly counter activity in
622625
621
2009 demonstrated a grad-
551
534
ual decrease in the latter
500
434
months of the year, with the
busiest month of the year
being June.
7
City of Downey General Plan Annual Progress Report 2009
Planning Cases
Cases by Type (2009)
Conditional Use Permit (CUP) 28
Planning cases in 2009 totaled 106, which
was a 24.13% decrease from 2008. The
Special Events (SE) 19
sharpest increase from 2008 being Site Plan
Site Plan Review (SPR) 12
Review (SPR) Applications.
Zone Variances (VAR) 11
SPR: 2 in 2008 vs.12 in 2009
Lot Line Adjustments (LLA) 8
The “Other” category includes Design Review
Planned Sign Program (SIGN) 4
Revisions, Certificates of Compliance, Code
General Plan Amendment (GPA) 3
Amendment, Code Amendment Initiation, De-
velopment Agreement, Minor Modification,
Tentative Tract Map (TTM) 3
Miscellaneous, and Minor Site Plan Reviews.
Zone Change (ZC) 3
Additionally, in 2009, the Planning Division
Second Unit Development (SUD) 2
has been working on implementing Accela (a
Lot Merger (LM) 2
new permit tracking system) which is esti-
mated to launch in Spring 2010. Other pro-
Others11
jects included the preparation of the 2010
106
TOTAL
Census and the Downtown Specific Plan.
Planning Commission
The Planning Commission conducts public hearings on most entitlements, including new build-
ings, conditionally permitted uses, variances, etc. On legislative items such a General Plan
Amendments (GPA), amendments to the zoning ordinance, and zone changes, the Planning
Commission acts as an advisory body to the City Council.
In 2009, the Planning Commission conducted 21 meetings, during which they considered 70
items. The Planning Commission also participated in a joint meeting conducted with the City
Council.
Housing Element
Pursuant to State law, the City is required to update the General Plan Housing Element for the
planning period of 2006-2014 and submit a draft of the element to the California State Depart-
ment of Housing and Community Development (HCD) by June 30, 2008. The City met this
deadline after the Planning Commission conducted a public hearing on the draft Housing Ele-
ment on June 18, 2008, and forwarded it to HCD for their comments. The Planning Depart-
ment selected consultant firm, Willdan and Associates to prepare the Draft Housing Element
for the City.
8
City of Downey General Plan Annual Progress Report 2009
On November 2, 2009, the State of California Department of Housing and Community Devel-
opment (HCD) issued a letter notifying the City that the update to the Housing Element to the
General Plan will comply with State law.
The Planning Commission conducted a public hearing on the update to the Housing Element
on December 2, 2009. Afterwards, at the conclusion of which the Planning Commission recom-
mended approval of the Housing Element to the City Council. In January 2010, the Housing
Element was adopted by City Council. Staff forwarded the Element to the HCD for a 90-day
certification process.
Building and Safety Division
The Building and Safety Division is responsible for a variety of tasks including issuing permits,
processing plan check submittals, and inspections. The division reviews all plans and permits
for compliance with the 2007 California Building Code. New building construction and a major-
ity of tenant improvements require plan check review for Zoning and Building Code compli-
ance. These plan checks are reviewed by the Building and Safety Division, Planning Division,
Fire Department, and the Engineering Division.
The submittal of plan checks has steadily decreased since 2006, with only 577 in 2009. This
represents a 26.96% decrease in plan checks submitted from the 2008 amount. Furthermore,
since 2005, there has been a 53.73% decrease in plan checks submitted to the Building and
Safety Division. The decrease in plan checks and permits issued can be attributed primarily to
the recent downturn in the national economy and the slump in the housing market.
9
City of Downey General Plan Annual Progress Report 2009
In addition to reviewing plan checks, the Building and Safety Division also issues permits.
These types of permits include all construction related projects, patio additions, roofing, instal-
lation of condenser units, construction of walls and fences, and repaving of driveways. The
number of permits issued in 2009 was 2,204. This is a 1.15% increase in permits issued from
2008. Since 2005, there has been a 30.45% decrease in permits issued. There was a de-
crease in plan checks and an increase in permits because property owners are pulling mainte-
nance permits, which majority of the time, do not require plan check process.
Economic Development Division
2009 marked the beginning and continuation of major Economic Development projects.
Tierra Luna
The Tierra Luna Specific Plan is a bold plan to facilitate redevelopment of the approximately
80-acre portion of the former NASA Industrial Plant site. Currently, Downey Studios operates
at this location. Tierra Luna would facilitate new mixed use development at the site. In 2009, a
draft Environmental Impact Report (EIR) was circulated for the Tierra Luna Specific Plan. The
Tierra Luna Specific Plan will be completed upon resolution of the ongoing negotiations to lo-
cate a manufacturing and assembly plant for Tesla Motors at the site (discussed below).
Tesla Motors, Inc.
In 2009, the City of Downey approved an incentive package for Tesla Motors to locate its
manufacturing and assembly operations in Downey. Tesla Motors will occupy 56.85 of the 77
acres at the Downey Studios and former NASA site. The new production plant will produce
Tesla’s all-electric Model S sedan vehicles and will create up to 1,000 jobs for the region.
10
City of Downey General Plan Annual Progress Report 2009
The following year, on March 17, 2010, Tesla Motors and Industrial Realty Group received City
approval of all necessary entitlements to operate at the former NASA site. The final certification
of the National Environmental Protection Act (“NEPA”) documents necessary for the project are
expected to be complete in early summer of 2010.
Avenue Theater and Verizon Building Redevelopment
The City of Downey continues to move forward with a strategy to redevelop the Downtown
area. The City seeks to implement several catalytic projects in the Downtown area that can
help to reshape it and stimulate redevelopment. Staff identified the Verizon Building and Ave-
nue Theater in Downtown Downey as properties to target for potential acquisition using rede-
velopment housing set-aside funds.
The Verizon Building and the Avenue Theater were acquired in 2008 with the intent to redevel-
oping both properties with residential units. Both properties are located in the central area of
Downtown.
In 2009, the City selected National Community Renaissance (“National Core”) to be the devel-
oper for the Verizon and Avenue Theater properties. During negotiations in 2009, City staff
decided to separate the Verizon and Avenue Theater projects. During 2010, staff will continue
to prepare the environmental analyses necessary for the Avenue Theater Project, but redevel-
opment is not expected until 2011 due to funding constraints. However, the Verizon Project will
move forward in 2010. It will be seeking its Planning approvals in spring of 2010 and final ap-
proval of the development-related agreements for the project are expected in early summer of
2010. During both 2009 and 2010, staff and National Core will continue to apply for funding for
the project.
Bob’s Big Boy (formerly Johnie’s Broiler site)
The restaurant formerly known as Johnie’s Broiler Coffee Shop/Drive-in, located at 7447 Fire-
stone Boulevard, was illegally demolished in 2007. After this demolition, the City worked ac-
tively to facilitate redevelopment of this site and to save any remaining historical elements of
the building. The Planning and the Economic Development Divisions jointly worked on locating
a new user and obtaining both environmental clearance and entitlement for the project. To
move the redevelopment forward, the City invested, via an owner participation agreement, ap-
proximately $900,000 in federal funds that went toward the historic preservation and recon-
struction of the building.
With City assistance, the Bob’s Big Boy/Johnies Broiler building was reconstructed according
to its original plans and many of the character-defining features of the original Googie Style
building were either recreated or reused in the new building. Bob’s Big Boy opened for busi-
ness on October 19, 2009.
11
City of Downey General Plan Annual Progress Report 2009
Porto’s Bakery
In late 2009, the City entered into an owner participation agreement with Porto’s Bakery to be
located in Downtown Downey. Porto’s is a very successful Cuban-style bakery, but more im-
portantly, it is a regional destination that attracts huge numbers of customers. The addition of
Porto’s to Downtown Downey is a huge step toward remaking Downtown Downey into a more
active and interesting place for both Downey residents and customers from neighboring com-
munities. The Porto’s Bakery project was approved by the Planning Commission on October
7, 2009. The project is located at 8233-8255 Firestone Blvd (northwest corner of Firestone
Blvd & Downey Ave). It includes a 17,715 square foot Porto’s Bakery & Café and a two-level
parking structure on the two-acre site. Porto’s Bakery has two other very successful locations
in Burbank and Glendale. The project is currently under construction and is expected to be
completed, and open for business in the summer of 2010.
Fresh & Easy Grocery Store
During 2009, City staff entered into a parking agreement with Fresh and Easy to facilitate a
new Fresh and Easy store at the former (and vacant) Albertson’s store building, 8320 Firestone
Boulevard. It is located on a key commercial corridor in central Downey and has been a blight-
ing influence on the area for many years. The new 15,000 square foot, Fresh & Easy store,
combined with a new Dollar Tree store adjacent to it, will significantly improve the area. Fresh
& Easy completed its final stage of construction and opened for business in April 2010.
BJ’s Restaurant
In 2008, BJ’s restaurant approached City staff with a request to locate a new restaurant at the
existing Stonewood Mall. BJ’s proposed to locate its store at the southwest corner of the mall
and replace two contiguous tenant spaces, formerly occupied by Citibank and Warehouse Re-
cords.
Working with City staff, BJ’s received approval for both a change of use and a conditional use
permit and implemented both façade and tenant improvement projects. The Downey BJ’s con-
tains about 9,168 square feet of floor area; of which, 5,596 square feet is indoor dining area,
876 square feet is outdoor seating/patio area, and the remaining 2,696 square feet encom-
passes restrooms, a cooler, take-out, and a service area. BJ’s opened for business on August
3, 2009 and its opening night was the busiest ever in company history.
12
City of Downey General Plan Annual Progress Report 2009
Kohl’s Department Store
In late 2008, the City of Downey learned that a major sales-tax-producing retailer, Mervyn’s,
would be closing it’s location at Downey’s regional mall (Stonewood Center). City staff had
worked previously with Kohl’s clothing store to locate a new store at two other locations in
Downey. However, when the vacancy occurred at Stonewood, staff began working with Kohl’s
to locate a new store at the Mervyn’s site. The result of these efforts is the new Kohl’s at
Stonewood Center, which opened for business in September 27, 2009.
Kaiser Permanente
City staff continues to work actively with Kaiser Permanente on the development of Kaiser’s
medical complex located at the former NASA site. After nearly five years of construction, Kai-
ser opened its newest hospital, the Kaiser Downey Medical Center in October 2009. This facil-
ity is a 352-bed, 657,000 square foot, state-of-the art hospital that includes facilities and equip-
ment for several specialty procedures that will bring patients from throughout California. The
new hospital, combined with the approximately 100,000 square-foot Kaiser Medical Office
Building, is a very important economic development engine for Downey.
Housing Division
The City of Downey Housing Division administers both redevelopment housing funds and
funds from the United States Department of Housing and Urban Development. Using these
resources, the Housing Division implements a variety of programs including housing rehab,
handicap and senior accessibility-related improvements, and other housing-related upgrades.
Additionally, the Housing Division administers the Community Development Block Grant Pro-
gram that funds several public service organizations, City code enforcement, and provides
funding for city parks.
(This space left intentionally blank.)
13
City of Downey General Plan Annual Progress Report 2009
General Plan
2009
Implementation Status
14
City of Downey General Plan Annual Progress Report 2009
Chapter 1: Land Use Element
The land use chapter establishes the policies for determining where certain land uses, such as
residential, commercial, industrial, are most desirable. The land use chapter defines the physi-
cal areas in the City serving the needs of residents, businesses, and visitors.
Updates:
Adopt a comprehensive update of the Zoning chapter of the municipal code
(Program 1.3.2.1.).
The Planning Division underwent a comprehensive update to the
Zoning Code that became effective in November of 2008. In 2009, the Planning Depart-
ment prepared a Zoning Code clean-up to correct typographical, grammatical errors,
and minor inconsistencies.
Promote housing, mixed use housing, and other land uses that will generate
nighttime pedestrian traffic in the Downtown (Program 1.2.2.3.).
The Community
Development Department finalized a contract with Hogle-Ireland, Inc. (consultant com-
pany) to draft a new Specific Plan for the downtown. The downtown plan hopes to ex-
pand the downtown area, as well as insert mixed uses into the downtown area. The City
intends to adopt a Specific Plan for the downtown by Summer 2010.
Change the zoning properties where inconsistent with general plan land use des-
ignations (Program 1.3.2.3.).
The Planning Division continues to bring land use desig-
nations and zoning into compliance with each other. In 2009, one (1) Zone Change re-
quest (9920 Lakewood Boulevard) was filed with the department that brought it into
compliance with the General Plan.
Promote livable communities concepts that allow added flexibility in addressing
land use needs (Policy 1.2.1.).
The Downtown Specific Plan and development will pro-
mote livable community concepts.
Adopt a specific plan for the areas surrounding the Downey Landing site with
uses complimentary to the primary uses on the Downey Landing site (Program
1.2.2.5.)
A specific plan and EIR process for the Tierra Luna development has begun
that will include uses that are complimentary to the primary uses on the Downey Land-
ing site.
Promote Downtown Downey as a destination draw for entertainment and dining
uses (Program 1.1.5.2.).
The Request for Proposals issued for the Avenue Theater/
Verizon Building redevelopment project and the Downtown Specific Plan hopes to pro-
mote Downtown Downey as a destination draw. Additionally, in 2009 two new restau-
rants were added to the downtown: Icons Café (8239 2nd Street), a restaurant/ night-
club and Downtown BBQ Company (11045 Downey Avenue), a barbeque restaurant.
15
City of Downey General Plan Annual Progress Report 2009
Chapter 2: Circulation Element
The safe and efficient movement of people and goods through cities is provided by a circula-
tion system ranging from sidewalks to roadways. As population and economic growth contin-
ues, cities have the challenge of improving the circulation system to deal with increased de-
mands. The growth also impacts the infrastructure needed to provide utilities and other ser-
vices needed for those who live, work, and visit the City.
Updates:
Traffic Congestion
Maintain intersections and street segments at acceptable service levels and not
worsen those intersections and street segments currently operating at unaccept-
able levels. (Program 2.1.1.1.).
Capacity improvements were completed at the inter-
sections of Lakewood Blvd. at Firestone Blvd., Imperial Hwy., and on Lakewood Blvd.
between Imperial Hwy. and the I-105 Freeway during 2009. These improvements were
made to provide acceptable levels of service at these intersections and arterial segment.
th
The design for the widening of Lakewood Blvd. between Florence Ave. and 5 Street is
also substantially complete.
Establish a street improvement master plan prioritizing areas to be included in an-
nual updates of the capital improvement program (Program 2.1.1.2.).
The General
Plan Circulation Element serves as the Street Improvement Master Plan. This plan is
used as the basis annually to prioritize areas to be included in annual updates to the
CIP.
Develop a signal system master plan to promote state-of-the-art intelligent trans-
portation system (ITS) improvements to better service on-going traffic conditions.
(Program 2.1.1.3.).
The City of Downey has developed a Traffic Signal System Master
Plan. The City of Downey has previously installed and is operating fiber optic communi-
cation systems along Firestone Blvd. and Lakewood Blvd. and has completed a design
for Paramount Blvd. A Fiber Optic (FO) Traffic Signal System will be constructed in late
2010. In addition, the City is completing the design for the Florence Avenue FO system.
LA County is also completing construction of a FO Traffic Signal Communication Sys-
tem with CCTV surveillance cameras on Imperial Highway, between Bellflower Boule-
vard and Old River School Road. A similar system will be completed on Telegraph Road
between Paramount Boulevard and the east City limits.
Prohibit on-street parking on major, primary, and secondary streets to increase
roadway capacity and improve safety. (Program 2.1.1.4.).
The Department of Public
Works has previously implemented programs to prohibit on-street parking in order to in-
crease peak period capacity. They will continue to seek similar opportunities in 2010.
16
City of Downey General Plan Annual Progress Report 2009
Establish a development recovery fee program to require new developments and
expansions of existing developments to pay the cost of circulation improvements.
(Program 2.1.2.1.).
Developer fees are collected on a case-by-case basis by the Public
Works Department through the development plan review process. Over the last six
years (2003-2009) a total of approximately $242,540 has been collected.
Ensure the mitigation of off-site traffic impacts by development projects to the
maximum extent feasible, including the installation or upgrade of traffic signals at
intersections and/or contribution of its fair-share towards mitigating impacts
(Program 2.1.2.2.).
In 2009, the Public Works Department continued to monitor the po-
tential traffic generation impacts of land development projects on a case-by-case basis.
If the trip generation threshold exceeds the requirements of the Los Angeles County
Congestion Management Program, a traffic impact analysis study is required. The study
will determine mitigation measures necessary to offset the impacts created by the devel-
opment or the amount of development fee to be collected.
Reduce the number of driveway access points on streets (Program 2.1.2.3.).
Re-
ductions in the number of driveways were continuously reviewed on a case-by-case ba-
sis through the development plan review process. For instance, commercial uses are
frequently required to close unused driveways (specifically, properties that are located
adjacent to major intersections) because of traffic safety concerns.
Promote site designs, street patterns, and street signalization that discourage the
use of local streets as through routes (Program 2.1.2.4.).
In 2009, the implementa-
tion of the Imperial Highway Phase II was determined to be completed in 2010 and will
establish a new median on Paramount Boulevard to the west city limit, and on Bellflower
Boulevard to the east city limit.
Truck Traffic
Co-ordinate with local, regional, and state agencies involved in mitigating truck
traffic impacts in the region. (Program 2.3.1.2.).
Coordination is maintained with Los
Angeles County on a regular basis regarding the issuance of overload permits to ensure
that the correct haul routes through the City of Downey are utilized and that proper ar-
rangements have been made in advance. Four (4) overload permits were issued in
2009.
Widen street right-of-way to accommodate truck turning movements. (Program
2.3.1.3.).
The Public Works Department has already modified several intersections
throughout the City by reconstructing the curb returns with larger radii (50’) to accommo-
date truck turns. Several intersections along Lakewood Blvd. have been modified. In
2009, two additional intersections (Paramount Blvd. at Firestone Blvd. and Bellflower
Blvd. at Imperial Hwy.) have been under design to relocate the utilities and to acquire
right-of-way.
17
City of Downey General Plan Annual Progress Report 2009
Promote efforts to encourage the use and extension of the railroad transportation
corridors (including the Alameda Corridor) to relieve traffic on city streets
(Program 2.3.1.4.).
The Ports of LA and Long Beach initiated the PierPass Program in
2005 and continues to be employed. PierPass encourages the use of the Alameda Cor-
ridor to transport containers to the rail yards in Los Angeles versus the freeways and
City’s streets by charging freight companies, which transport containers via the freeways
and local streets during daytime hours, $40.00 per 20’ container and $80.00 per 40’ con-
tainer at the gates of the ports.
Support truck mobility efforts to keep container truck traffic traveling through the
region on freeways (Program 2.3.1.5.).
The Public Works Department and City Man-
ager’s office continue to be involved with the planning and design process to widen the
I-710, I-5 and I-605 Freeways at various locations through the Gateway Cities COG.
These efforts will to provide additional capacity on the freeways to accommodate truck
traffic growth.
Discourage truck parking on public streets (Program 2.3.2.1.).
Municipal Code Sec-
tion 3185 (b) prohibits parking of commercial vehicles exceeding 6,000 lbs. manufac-
turer’s unladen weight or 84 inches in height or width, on all public streets with the ex-
ception of those streets located within areas zoned industrial, the vehicle is involved with
the servicing of the adjacent property or for a period not to exceed eight hours if the ve-
hicle has been involved in an accident or is disabled. This ordinance is actively en-
forced.
Maintain landscape islands on and/or adjacent to truck routes with mature speci-
men fully grown landscape screens to minimize noise, dust, and visual impacts
(Program 2.3.2.2.).
The Public Works Department has constructed raised landscaped
median islands on Lakewood Blvd. between the north and south City limits, Imperial
Hwy. between Paramount Blvd. and Bellflower Blvd. and Bellflower Blvd. between Lake-
wood Blvd. and Foster Rd. All of these streets are truck routes. Raised landscaped me-
dian islands are also proposed for Imperial Hwy. between Paramount Blvd. and the west
city limit and between Bellflower Blvd. and the east city limit, Paramount Blvd. between
Imperial Hwy. and Florence Ave. and on Telegraph Rd. between the west city limit and
east city limit.
Promote property development designs along truck routes that minimize noise,
dust, and visual impacts through the use of berms, landscape screening, walls,
and other design features. (Program 2.3.2.3.).
Physical barriers separating truck
routes from adjacent uses are constructed as necessary in conjunction with capital im-
provement projects. In 2009, it was required for a masonry block wall to be constructed
along the south side of Imperial Hwy. adjacent to residential neighborhoods between
Coldbrook Ave. and Woodruff Ave. in conjunction with the Imperial Hwy. Traffic
Throughput & Safety Enhancements Project - Phase 2 .
18
City of Downey General Plan Annual Progress Report 2009
Regional Traffic
Coordinate with CalTrans, MTA, SCAG, Gateway Cities COG and other agencies to
promote multi-modal improvement strategies to improve the regional transporta-
tion network (Program 2.4.1.1).
The Public Works Dept. coordinates with Caltrans,
Metro, SCAG and Gateway Cities COG through discretionary funding processes and
other programs such as the Congestion Management Program, Highway Performance
Monitoring Survey (HPMS) on an on-going basis to promote multi-modal improvement
strategies to improve the regional transportation network.
Coordinate with l-5 Joint Power Authority regarding increasing capacity of the I-5
Freeway in a method that minimizes impacts on private properties (Program
2.4.1.2).
The Public Works Dept. and City Manager’s office participates on the I-5 JPA
regularly and coordinates with Caltrans on the I-5 widening project, which ultimately will
provide additional capacity on the facility while minimizing the impact on property own-
ers to the extent feasible.
Support efforts to upgrade the I-710 freeway to address and restrict container
truck traffic (Program 2.4.1.3).
The Public Works Dept. and City Manager’s office par-
ticipate in the I-710 planning and environmental review process through the Gateway
Cities COG.
Comply with provisions of the Congestion Management Plan, adopted by Los An-
geles County (Program 2.4.1.4).
The City complies with the LA County Congestion
Management Plan annually through the preparation of the Local Implementation Report
(Planning Dept.) and Biennial Highway Monitoring (Public Works Dept.), as required by
statute. In addition, the City holds land developers accountable for their impacts by re-
quiring traffic impact analyses (TIA) to be completed in accordance with LA County CMP
TIA guidelines.
Support regional efforts to develop high-speed trains and other modes of regional
travel other than single-occupant vehicles (Program 2.4.1.5).
The City facilitates the
implementation of regional transit routes within the City through coordination with LA
County Metro. In 2009, the Public Works and Community Services departments facili-
tated the deployment of the Metro Rapid service along the Firestone Boulevard/
Manchester Boulevard corridor with the eastern terminus at the Downey Depot.
19
City of Downey General Plan Annual Progress Report 2009
Railroad Delays
Evaluate the cost and feasibility of a grade separation of the railroad line
(Program 2.6.1.2).
The cost and feasibility of constructing a railroad grade separation at
the Firestone Blvd. at Old River School Rd. intersection has been ascertained through a
preliminary engineering/environmental study in 2009, which is estimated to be com-
pleted late 2010 – early 2011.
Establish a development recovery fee program to require new developments and
expansions of existing developments to contribute towards an eventual grade
separation and other railroad-related improvements (Program 2.6.1.3).
For several
year, the Public Works Department has collected fees from developers located along
Firestone Blvd. through the land development review process, as a condition of approval
imposed upon land development applicants. These funds will be directed toward the
construction of a railroad grade separation on Firestone Blvd. at Old River School Rd.
Infrastructure and Maintenance
Promote the expansion of communication networks to meet the needs of city resi-
dents, businesses, and other land uses (Program 2.7.1.2.) & Develop master plans
to identify needs, priorities, and cost for infrastructure maintenance and upgrades
(Program 2.7.2.2.).
The Public Works Department is continuously deploying fiber optic
communications infrastructure along major arterials for traffic signal communications
purposes and other purposes as well, including providing communication between the
Water Yard and the City’s well sites. Systems have already been deployed and are in
operation on Firestone Blvd. and Lakewood Blvd. and will be deployed in the near future
on Paramount Blvd. and Florence Ave. In addition, the County of Los Angeles has
nearly completed with the construction of similar systems on Imperial Hwy. between
Bellflower Blvd. and Old River School Rd. and Telegraph Rd. between Paramount Blvd.
and the east city limit.
Promote alternative funding sources for infrastructure maintenance and upgrades
(Program 2.7.2.1.).
The Public Works Department continuously seeks alternate means
of funding infrastructure maintenance and upgrades. In addition to the revenue received
for this purpose through state gas tax and local return subventions, fair share contribu-
tions toward Capital Improvement Projects involving the maintenance and upgrade of
the City’s infrastructure are collected from land development project applicants (through
conditions of approval imposed on development on a case-by-case basis) as a means
of offsetting the development’s impacts on the City’s infrastructure. Property owners are
also assessed fees through their property tax toward the maintenance and operations of
the City’s street lighting, traffic signals and street landscaping as required by the Light-
ing and Landscaping District. This is an on-going process.
20
City of Downey General Plan Annual Progress Report 2009
Develop master plans to identify needs, priorities, and cost for infrastructure
maintenance and upgrades (Program 2.7.2.2).
Public Works developed a sewer mas-
ter plan for sewer infrastructure, which identifies capacity and structural integrity needs,
and costs for maintenance and upgrades in 2009. Public Works is also in the process of
finalizing a water master plan for water infrastructure to identify capacity and structural
integrity needs, as well as costs for maintenance and upgrades. The Public Works De-
partment continuously maintains a Pavement Management System to determine the
needs and prioritize the City streets by the order in which the streets will be rehabilitated
and by the method of resurfacing them (i.e., reconstruction, grind and overlay, slurry
seal, etc.). Cost estimates are prepared for each location identified in the system to de-
termine a projected annual cost to rehabilitate the list of streets scheduled for resurfac-
ing in any given year, which is compared to the projected revenue available for the given
year to ensure adequate funding will be available.
Chapter 3: Housing Element
The California State Legislature has identified the attainment of a decent home and suitable
living environment for every citizen as the State’s major housing goal. Accordingly, the State of
California mandates that each county and city maintain a Housing Element in their General
Plan. Section 65583 of the Government Code sets forth the specific components to be con-
tained in a community’s housing element, including the City’s share of the Regional Housing
Needs Assessment (RHNA).
Housing Element Update.
The Planning Commission recommended approval of the update to
the Housing Element to the City Council on December 2, 2009. In January 2010, the Housing
Element was adopted by City Council. Staff has forwarded the Element to the HCD for a 90-
day certification process.
Regional Housing Needs Assessment.
Like with the rest of the SCAG region, the City
of Downey is within the RHNA planning period for 2006-2014. For this planning period,
the City of Downey was assigned 1,108 units for its share of the regional housing needs.
A summary of the City’s accomplishment to meet this requirement is noted in the follow-
ing table:
Housing Production 2006-2014 Constructed Constructed Total
Requirement 2006-2008 2009Constructed
Extremely Low Income 138000
Very Low Income 139000
Low Income 174011
Moderate Income 187000
Above Moderate Income 470532679
Total Units 1,108532780
21
City of Downey General Plan Annual Progress Report 2009
In addition to providing assistance and guidance for the City’s Housing Element, the Housing
Division administers a variety of programs. The following is in regards to Chapter 8 of The
Housing Element programs administered under the Housing Division:
2. HOUSING IMPROVEMENTS
Objective: Fund 30 rehabilitation projects per year
Time Frame: Housing Element 2006-2014
Status: 34 rehabilitation projects were funded in 2009, with a total of
$1,132,792 in improvements to residential properties occupied by low
income households. Another 14 housing units received modifications
which improved accessible for disabled persons.
3. SENIOR PAINT/FIX-UP PROGRAM
Objective: Assist 30 households annually.
Time Frame: Housing Element 2006-2014
Status: 28 housing units were improved under this Program in 2009.
8. TRANSITIONAL AND SUPPORTIVE HOUSING AND EMERGENCY SHELTERS
Objective: Revise Zoning Code to permit land use
Time Frame: By June 2010
Status: There were no new requests for homeless transitional housing permits
in 2009; The City continued its policy of providing funding for an exist-
ing transitional facility in 2009.
10. AFFORDABLE HOUSING PROGRAM
Objective: Reserve local funds for affordable housing units
Time Frame: Housing Element 2006-2014
Status: In 2009 the City budgeted over $750,000 as seed funding for develop-
ment of new affordable housing units. One (1) single family home with
3 bedrooms was constructed in 2009. Also, eight (8) affordable rental
units was rehabilitated in 2009.
12. FIRST TIME HOMEBUYER
Objective: Assist 12 low income homebuyers per year
Time Frame: Housing Element 2006-2014
Status: No new loans were financed in 2009, because the program was inac-
tive as it was being revised to be brought into compliance with new
State regulations.
22
City of Downey General Plan Annual Progress Report 2009
14. MORTGAGE CREDIT CERTIFICATE PROGRAM
Objective: Provide ongoing promotional and marketing support of the County’s
Program
Time Frame: Housing Element 2006-2014
Status: There were no real estate transactions in Downey that utilized this Pro-
gram in 2009. However, the City continues to participate and adver-
tises its availability.
15. SECTION 8 RENTAL ASSISTANCE
Objective: Continue support of the County’s Program
Time Frame: Housing Element 2006-2014
Status: An average of 490 renter households per month received rent subsi-
dies from the County of Los Angeles, enabling them to preserve afford-
able housing.
(This space left intentionally blank.)
23
City of Downey General Plan Annual Progress Report 2009
Chapter 4: Conservation Element
The City of Downey and the rest of southern California enjoy a temperate climate, access to
both beaches and mountains and many other amenities not found in many other parts of the
world. The quality of life that the region offers its residents is one of the main reasons the re-
gion continues to attract visitors and newcomers. However, southern California is a semi-arid
desert environment with limited natural resources. These limited resources, need to be pre-
served for continued use by existing residents and by future generations.
Water Supply
Continue providing information to the public promoting the benefits of water con-
servation. (Program 4.1.1.1.).
Public Works continues participation in LivingWise Edu-
cational Conservation Program which reaches out to school age children (and their fami-
lies) through the Downey Unified School District.
Develop, through the municipal water company financial incentives for water us-
ers to conserve water, including individual meters and a tiered billing structure
that charges excessive water use at a higher rate. (Program 4.1.1.2.).
Public Works
required developers of multiple unit condominiums (residential/business) to install indi-
vidual meters for each unit thereby promoting water conservation.
Encourage the use of reclaimed water, or re-use of water on-site, for new and re-
development projects. (Program 4.1.1.4).
Public Works continues to require develop-
ers to install reclaimed water piping and meters where reclaimed water is available.
Expand the availability of reclaimed water by extending the dual-pipe water sys-
tem (Program 4.1.1.5.).
The City extended reclaimed water piping along Lakewood
Boulevard between Dalen Street and Gardendale Boulevard, and along Firestone
Boulevard from Lakewood Boulevard to Nash Avenue. In addition, the City has de-
th
signed additional reclaimed water piping in Lakewood from 5 Street to Florence Ave-
nue.
Promote drought-tolerant plants, rain sensors, moisture sensors and other water
conservation methods for plant landscaping projects (Program 4.1.1.6.).
The re-
vised landscape standards in the new Zoning Code require a minimum of 60% of non-
turf material in the non-residential zones to be drought tolerant.
Develop a Water System Master Plan that describes what will be needed for main-
tenance of the system (Program 4.1.2.2.).
The City’s Water Master Plan is under de-
velopment and is slated to be complete in 2010.
24
City of Downey General Plan Annual Progress Report 2009
Rehabilitate groundwater wells on a regular basis to maintain potable water pro-
duction levels (Program 4.1.2.4.).
During 2009, the Public Works Department rehabili-
tated Wells 4, 7, 9, and 24.
Water Quality
Coordinate with local, regional, state and federal efforts to protect the groundwa-
ter supply and enhance groundwater quality (Program 4.2.1.3.).
The Public Works
Department participated in Southern California Edison’s groundwater pumps and wells
Agricultural Energy Efficiency Program (AEEP) in 2009. Through this participation the
City was awarded $26,211 for upgrading groundwater wells to be energy efficient
Stormwater Quality
Provide treatment of runoff generated by properties on-site before release into the
storm drain system (Program 4.3.1.1.).
During 2009, at least 88 development and re-
development projects were approved for construction with infiltration systems to reduce
runoff and pollutant transport. Larger projects included the Bob’s Big Boy at 7447 Fire-
stone Blvd., Fresh and Easy at 8320 Firestone Blvd., Citibank at 8764 Firestone Blvd.
and Walgreens’ at 9020 Firestone Blvd. City Utilities staff conducted our first cleaning of
large trash collecting “CDS” units under Ardis Ave. and adjacent to the Discovery Park
Infiltration Basin. As public, commercial and residential projects are redeveloped, water
quality control measures are implemented resulting in a steady improvement in water
quality with the costs distributed in both time and among the various city stakeholder
groups.
Discourage activities that generate pollutants on parking lots, and public streets
(Program 4.3.1.2.).
This is primarily a code and law enforcement function, while Public
Works can contribute by requiring trash control and regular maintenance within the
Standard Urban Stormwater Mitigation Plan development. Public Works has more ag-
gressively enforced and implemented Publication Vending Machine Permit ordinances,
resulting in the removal of dozens of free and coin operated machines, which results in
less trash in our streets and parking lots. In late 2008, about 330 machines were lo-
cated on public property in the City. This quantity was reduced to 255 in 2009, and 213
in early 2010. During 2010, the City of Downey, using a federal grant, will install screens
in catch basins within the Los Angeles and Rio Hondo Watersheds (west half of
Downey) in compliance with state regulations. Additional support will be required to
maintain these screens and remove the trash and debris they collect.
25
City of Downey General Plan Annual Progress Report 2009
Promote effective street cleaning (Program 4.3.1.3.).
Publically owned streets in the
City of Downey are vacuum swept weekly by Nationwide Environmental Services.
These streets are posted “No Parking” during the appointed period and Parking Enforce-
ment Officers accompanies the sweeper vehicle. Residents obtaining a Street Sweep-
ing Parking Permit are responsible for maintaining the street area that there vehicle
blocks from being cleaned. The sweeper truck also cleans City parking lots weekly.
Encourage proper storage and handling of construction materials to avoid the
contact of pollutants with storm water runoff during construction (Program
4.3.1.4.).
Public Works, Code Enforcement, and Building and Safety staff share respon-
sibility for implementing this program. Public Works focuses on construction projects in
the public right of way, preparation and review of erosion control plans by developers,
compliance by large state permitted construction sites and responding to complaints of
materials in the municipal separate storm sewer system (MS4), which includes streets,
alleys and drains. Building and Safety is primarily responsible for on-site or private
property conditions, while Code Enforcement responds to resident complaints and pro-
vides more aggressive enforcement capabilities to supplement other staff efforts.
Preserve existing naturally vegetated areas and encourage re-vegetation and soil
restoration where feasible (Program 4.3.1.5.).
For many years there has been no
“existing naturally vegetated areas” within the City of Downey. There is a small area to
the south of Wilderness Park planted with native vegetation, but resource limitations
have limited maintenance at this site or further implementation or this program. Devel-
opers are encouraged to include landscaping during redevelopment for water quality im-
provement.
Tree Preservation
Discourage the removal of trees on private and public property (Program
4.4.1.1.).
The revised landscape standards in the new Zoning Code encourage the
preservation of mature landscaping when a site is redeveloped. The Public Works Dept.
Dept. discourages the removal of trees from public property in general and requires per-
mits to be pulled when a tree is considered for removal, particularly mature trees. Addi-
tionally, Section 7607 of the Downey Municipal Code outlines specific criteria for re-
moval of street trees within the public right-of-way, but does not apply to private trees.
The City also conducts a public outreach effort to educate its citizens about the benefits
of planting and preserving trees. Each year, the Public Works Department conducts a
formal Arbor Day observance and tree planting ceremony. Also, informative pamphlets
that include tips on purchasing, planting and caring for trees are disbursed at all City fa-
cilities, including City Hall, Downey Library and the Community Center.
26
City of Downey General Plan Annual Progress Report 2009
Adopt a tree preservation ordinance requiring a permit to remove mature trees
(Program 4.4.1.2.).
In 1998, the City Council adopted Ordinance No. 1059 adding Sec-
tions 7600 – 7611 to the Downey Municipal Code, pertaining to the management of
parkway trees, and it is continuously enforced. Section 7605 of the Downey Municipal
Code specifies… “No public street tree will be removed/planted without having obtained
a permit from the Public Works Department. Additionally, it is the policy of the Public
Works Dept. that when a tree is removed from public property, a new tree from the list of
approved species is planted in its place.
Promote the installation of new trees when damaged or dying trees are removed
(Program 4.4.1.3.).
The City’s development standards encourage planting increased
tree canopy to offset the loss of significant trees on private property and to reap the
maximum benefits that trees provide. Section 7605 of the Downey Municipal Code
specifies that… “Any public street tree removed shall be replaced if a replacement is
deemed appropriate and if it is mutually agreed to by both the City and the Property
owner.” The Public Works Department continues to enforce this program.
Air Quality
Coordinate with other agencies, including school districts, transit agencies, and
regional agencies, including South Coast Air Quality Management District and the
Southern California Association of Governments, in their efforts to implement the
regional Air Quality Management Plan and otherwise improve air quality (Program
4.5.1.1.).
In 2009, the City was awarded a grant from the South Coast Air Quality Man-
agement District for replacing diseased Oleander screen plantings on Florence Avenue
frontage road islands near the east City limits. As a condition of the grant, replacement
plantings will consist of low volatile organic compound (VOC) emitting California native
plant trees and shrubs. Project implementation is anticipated during 2010.
Support regional and sub-regional efforts in strategically managing goods move-
ments in order to reduce emissions from truck traffic (Program 4.5.1.2.) & Reduce
air particulate and other pollutants created by, but not limited to the operation of
diesel engine and increased truck traffic from marine and port operations in the
Long Beach and Los Angeles ports and City operations, especially along the I-710
freeway corridor (Program 4.5.1.3.).
The Public Works Department and City Manager’s
office coordinate with various regional agencies (i.e., Caltrans, Gateway Cities COG, I-5
JPA, etc.) in the planning and implementation process for the widening of the I-710 and
I-5 Freeways. Both projects will provide improved mobility for trucks and a reduction in
truck-related emissions.
27
City of Downey General Plan Annual Progress Report 2009
Encourage alternative modes of travel, such as walking and cycling, to vehicle
use and alternative modes of employment, such as telecommuting and home-
based businesses, to reduce emissions associated with vehicle use (Program
4.5.1.4.).
The Public Works Department encourages walking as an alternate mode of
travel through the implementation of various projects. Public Works has applied for
grant opportunities through the Safe Routes to School and Highway Safety Improvement
Programs to encourage walking and cycling to and from school. Grant funds were re-
ceived for the upgrading of warning signage and pavement markings in the City’s school
zones. In addition, the installation of pedestrian countdown indicators at 20 signalized
intersections; these funds are used for the installation of a pedestrian traffic signal adja-
cent to East Middle School at the intersection of Woodruff Avenue at Via Amorita and for
the installation of vehicle speed feedback signs at 10 locations throughout the City in
residential neighborhoods to enhance pedestrian safety by discourage speeding.
Promote the use of alternative fuel vehicles, including clean diesel, compressed
natural gas, hydrogen, that result in reduced emissions, including in instances
involving City operations (Program 4.5.1.5.).
Funded in part with a grant with the
California Air Resources Board, the Public Works Department purchased a 2009 Case
570M XT Turbo Skip-loader featuring a clean-burning Tier 3 compliant diesel engine
and an aftermarket HUSS exhaust system particulate filter trap. The new skip-loader
was put into service in July 2009. This equipment replaced our heavy-polluting 1992
Massey-Ferguson diesel powered backhoe.
Energy Resources
Ensure the installation of energy efficient street lights and traffic signals (Program
4.6.2.1.).
Public Works completed a citywide retrofit of traffic signal indications with light-
emitting diodes (LEDs) and continues to require the installation of LEDs in all traffic sig-
nal installations and upgrades in conjunction with Capital Improvement Projects to mini-
mize energy consumption and cost. In addition, Public Works has initiated plans to con-
sider the installation of LED overhead safety lighting in Treasure Island Park.
Chapter 5: Safety Element
Natural and non-natural hazards present a variety of risk to persons who live, work, and visit
the city. The aim of the city is to reduce the potential risk of death, injuries, property damage,
and the economic and social dislocation resulting from hazards.
Updates:
Disaster Response
Maintain an emergency operation plan to provide response to a variety of poten-
tial hazards (Program 5.1.2.1.).
An emergency operation plan for the for all City De-
partments is in development and is expected to be adopted by the City Council in 2010.
28
City of Downey General Plan Annual Progress Report 2009
Hazardous Materials
Monitor the location, type of facility, and amount of hazardous materials kept at
properties (Program 5.2.1.2.).
All facilities handling hazardous materials at or above
reportable quantities (as defined in California Health & Safety Code §25503.5) are in-
spected by the Fire Department every other year for compliance with both the California
Health & Safety Code and California Fire Code. Currently, there are 293 facilities re-
porting the handling of hazardous materials. All new businesses handling hazardous
materials are captured during the business license application process. The current in-
spection frequency exceeds the State’s requirement for inspection to be conducted once
every 3 years.
Promote public information regarding the types of hazardous materials, which
may include common household items, and the proper method of disposal
(Program 5.2.1.3.).
The Fire Department has been working on upgrading the Fire De-
partment’s website, which will include an informational section concerning safe handling
and disposal of household chemicals.
Ensure proper disclosure of amounts of hazardous materials by existing uses and
proposed uses, during the business review process (Program 5.2.1.4.).
All new
businesses handling hazardous materials are captured during the business license ap-
plication process. Once identified, these business receive a second inspection by the
Fire Department’s Hazardous Materials Section and are then placed in the Fire Depart-
ment’s database. These facilities are then placed into the every other year inspection
cycle to ensure proper hazardous materials management, and are issued a Operational
Permit to handle hazardous materials.
Ensure the safe transport of hazardous materials through City review of routing
plans (Program 5.2.2.5.).
Traffic Engineering provides information on truck routes and
scheduling, when advised that unusual volume, size, or type of transport is required.
Engineering issues Transportation and Overload Permits, but enforcement is a function
for other departments.
Review continually that Hazardous Materials Emergency Response Plan has ade-
quate resources (Program 5.2.2.6.).
The City of Downey does not have a Hazardous
Materials Area Plan currently. This is being corrected with the award of a $17,500 grant
from the US Department of Transportation (DOT) for the development of the plan. Cur-
rently, the plan is being developed with the assistance of Risk Management Profession-
als (RMP), Inc. The plan will be completed by September 2010.
29
City of Downey General Plan Annual Progress Report 2009
Fire Protection
Identify and maintain an acceptable response time for fire emergency service
calls (Program 5.3.1.1.).
The Fire Department has maintained a speedy response time
for fire emergency calls over the last four years, and has continued training and updat-
ing of systems to ensure adequate response times. Dispatchers are continuously moni-
tored for speed, accuracy and efficiency. Suppression personnel abide by a policy stat-
ing a one minute response from the alarm to exiting the station.
2009
Year200620072008
4:50 min-
Average Response
4:50 min-4:45 min-4:46 min-
utes
Time
utesutesutes
Promote adequate widths on travel lanes along street and alleys to accommodate
emergency vehicles (Program 5.3.1.2. ).
Fire Department’s plan check personnel as-
signed to the fire prevention bureau, diligently review plans to ensure emergency vehicle
access through streets and alleys will be accommodated.
Ensure that development projects install fire hydrants, water mains, or otherwise
contribute its fair share towards mitigating impacts on the fire flow system
(Program 5.3.2.3.).
Requirements for additional fire hydrants are done through the plan
check process. In 2009, fire hydrants were installed for the following projects: Porto’s
Bakery(8233-8255 Firestone Blvd Firestone Boulevard), Bob’s Big Boy (7447 Firestone
Boulevard), Walgreen’s Drugstore (9018 Firestone Boulevard), Tacos El Gavilan (7947
Florence).
Promote the use of fire sprinklers for new, expanded, and remodeled develop-
ments (Program 5.3.2.4.).
The Downey Municipal Code requires sprinkler systems for
new commercial development over 3,600 sq. ft. and tenant improvements of commercial
properties, whose permit valuations exceed 25% of the value of the building.
Ensure access for emergency vehicles through security pedestrian and vehicular
gates (Program 5.3.2.6.).
Vehicle access through security gates is to be maintained at
not less than 20 feet per the Downey Municipal Code.
Keep crime rates and property loss rates at the lowest levels feasible (Program
5.4.1.1.).
In an effort to keep crime and property loss rates low, the Police Department
increased staffing by hiring 15 Police Officers and 9 support staff members. This in-
creased the Department’s capacity to deploy additional officers on patrol.
30
City of Downey General Plan Annual Progress Report 2009
Police Protection
Maintain an acceptable response time for police emergency service calls
(Program 5.4.1.2.).
The Police Department has maintained a swift response time to
high priority emergency calls that require immediate assistance to ensure the public’s
safety.
2009
Year20072008
4:07 minutes
Average Response Time4:33 minutes5:02 minutes
Promote the use of non-sworn personnel for police service tasks wherever possi-
ble to maximize the efficiency of sworn personnel (Program 5.4.1.4.).
The Police
Department deploys non-sworn personnel for various tasks, such as report writing, park-
ing enforcement and report dictation services. This enables officers to increase targeted
enforcement efforts in their assigned areas.
Promote the use technology as tools to improve staff productivity (Program
5.4.1.5.).
The Police Department upgraded its report writing software for officers. Having
combined many different systems used by officers, officer productivity was enhanced by
requiring them to do less work as one program now handles multiple activities. In addi-
tion, the Code Enforcement Division will be included in the City’s new permit tracking
system (Accela) which will eliminate the current manual tracking system.
Coordinate with Federal, State, and County agencies to address illegal activities
(Program 5.4.1.7.).
The Police Department’s Special Enforcement Team works in con-
junction with the State’s Alcohol Beverage Control to monitor and enforce applicable liq-
uor laws at alcohol establishments throughout the City.
Promote the increased visibility of police in neighborhoods (Program 5.4.2.1.).
The
Department deploys a Neighborhood Preservation Unit to proactively patrol areas in
need of upkeep and maintenance.
Support community organizations and neighborhood awareness programs that
promote crime prevention, including preventing gang activity (Program 5.4.2.2.).
The Department participates in awareness programs, such as Gangs Out of Downey,
and promotes crime prevention through its participation in Neighborhood Watch.
31
City of Downey General Plan Annual Progress Report 2009
Earthquake Safety
Monitor groundwater table levels as they relate to liquefaction hazards (Program
5.5.1.3.).
Public Works regularly monitors ground water levels at well sites around the
City of Downey. The ground water table is typically about 50’ below the soil surface,
which limits the risk of liquefaction to residential and typical commercial structures. Lar-
ger structures and those with significant subterranean components may be requested to
provide additional seismic evaluations during the development process or as a condition
of Site Plan Review (SPR) approval.
Ensure the placement of utility lines underground (Program 5.5.1.6.).
The Depart-
ment of Public Works continues to implement Underground Utility Districts (currently
construction in District 21 and designing District 22). Engineering plan checks call for
the use of vaults and pull boxes when appropriate, but many utilities assert the need to
use above ground structures to protect their lines from the intrusion of moisture.
Floods
Continue to participate in the Federal Emergency Management Agency flood pro-
gram (Program 5.6.1.1.).
The City of Downey participates in the FEMA Flood Insurance
Rate Map (FIRM) program; however, since 2002, all but a small portion of the City within
the Rio Hondo Channel itself is in the X flood zone. All plan checks are required to note
the flood map and flood zone for the parcel and proposed project.
Educate the public that the City is located in an “X” flood zone where flood insur-
ance is no longer mandatory (Program 5.6.1.2.).
Handouts regarding the current
FIRM and flood zoning are available from the Public Works Counter, or can be faxed, or
emailed. While the public may be educated that flood insurance is not mandatory, they
must also be cautioned that a flood risk remains, normally between 1% and 0.2% per
year. FIRM information can be found at www.fema.gov and City of Downey information
can be viewed on the website.
Mitigate hazards from possible dam or levee failure, including the raising of
bridges and levees along rivers, including in areas outside the City (Program
5.6.1.3.).
The City of Downey supports efforts by the Army Corps of Engineers (ACOE),
FEMA, Caltrans, and the County of Los Angeles, in reducing the flood risk from dam or
levee failure; however, maintenance and replacement of bridges, levees, and dams is
primarily under the control and undertaken with funds provided by these agencies.
32
City of Downey General Plan Annual Progress Report 2009
Minimize increases in the amount of stormwater generated by existing and pro-
posed land uses (Program 5.6.2.1.).
During Public Works plan checks, new and rede-
velopment projects with 400 square feet or more of new or replacement impervious sur-
faces are generally required to provide infiltration volume commensurate with an instan-
taneous 0.75” storm falling on the new or replacement impervious surface. Larger de-
velopments are required to prepare a Standard Urban Stormwater Mitigation Plan and
demonstrate that no increase in peak runoff rate will be observed as a result of the de-
velopment and that at least the instantaneous first 0.75 inch of projected runoff can be
infiltrated.
Maximize the amount of pervious surfaces on properties to absorb stormwater
and decrease runoff volumes (Program 5.6.2.2.).
While Public Works emphasizes the
benefits of pervious surfaces as a water quality protection measure. No mechanism ex-
ists to implement this program, except as it contributes to a project reducing the poten-
tial peak runoff from a site to comply with peak runoff generation and conveyance re-
quirements.
Preserve existing naturally vegetated areas and encourage re-vegetation and soil
restoration where feasible (Program 5.6.2.3.).
For many years there has been no
“existing naturally vegetated areas” within the City of Downey. There is a small area to
the south of Wilderness Park planted with native vegetation, but resource limitations
have limited maintenance at this site or further implementation or this program. Devel-
opers are encouraged to include landscaping during redevelopment for water quality im-
provement.
Vehicular Traffic
Promote programs that encourage driver courtesy. (Program 5.7.1.4.).
The Public
Works Department provides educational brochures on various driver safety topics, in-
cluding “Choose Courtesy”, “Road Rage” and “Defensive Driving,” at the front counter
on the 2nd floor of City Hall.
Promote the parking and access agreements and parking consolidation to reduce
the number of driveway access points on streets (Program 5.7.1.6.).
The City en-
courages the consolidation of parking and imposes reciprocal access agreements upon
adjacent developments through the plan review process, for purpose of minimizing
driveway curb cuts. For instance, similar agreements were required for the Citibank and
Gomez properties on the southwest corner of Lakewood Blvd. at Firestone Blvd.
33
City of Downey General Plan Annual Progress Report 2009
Adopt a Master Plan for installation of streetlights (Program 5.7.1.1.).
The Public
Works Department intend to complete a Streetlight Master Plan by 2011.
Require street lights for new developments (Program 5.7.1.2.).
The City requires de-
velopers to install new street lights adjacent to the development within the public-right-
of-way as a condition of approval where streetlights currently do not exist. In addition, as
a condition of approval through the development plan review process, applicants are re-
quired to give their consent to the annexation of their property into the City of Downey
Lighting Maintenance District in accordance with Division 15 of the Streets and High-
ways Code, and to incorporate or annex into a new or existing Benefit Assessment or
Municipal Improvement District, in accordance with Division 10 and Division 12 of the
Streets and Highways Code and/or Division 2 of the Government Code of the State of
California. In 2009 45-pedestrian/street lights were installed with street improvement
projects.
Establish a development recovery fee program to require new developments and
expansions of existing developments to fund the cost of streetlights (Program
5.7.1.3.).
A development fee program covering the cost of the installation of new street
lights will be considered as a component of the Street Light Master Plan.
Adopt a Master Plan for installation of sidewalks for major arterials, secondary ar-
terials, collector streets and school routes (Program 5.7.2.1.).
Sidewalks are con-
structed along major arterials, secondary arterials, collector streets and school routes on
a prioritized, as-needed basis as funding will allow. Priority is given to school routes.
For instance, sidewalk was recently constructed along the south side of Florence Ave.
between Newville Ave. and Lesterford Ave. and Rives Ave. between Pivot St. and Arnett
St.
Encourage the installation of sidewalks in new developments and major remodel-
ing consistent with the sidewalk Master Plan (Program 5.7.2.2.).
The City imposes
the construction of new and the repair of existing sidewalks and disabled ramps upon
new developments as a condition of approval through the development plan review
process.
Promote street intersection design and signalization that are safe and convenient
to pedestrians and bicyclists (Program 5.7.2.3.).
Signalized and un-signalized inter-
sections are designed to function in a safe and convenient manner for pedestrians and
bicyclists to the extent possible through the implementation of Capital Improvement Pro-
jects and through the Development Plan Review and plan checking process when such
improvements are constructed by private development.
34
City of Downey General Plan Annual Progress Report 2009
Chapter 6: Noise
Noise can be defined as unwanted sound and is known to have several adverse effects on
people. The most critical impact of noise exposure is hearing loss. Other effects are speech
interference, sleep interference and annoyance.
The City continues to enforce noise ordinances.
Chapter 7: Open Space Element
Typical of most communities located within mature urbanized settings, Downey has a limited
amount of open space areas. Open space areas are important not only to provide recreational
activities for residents but also as a visual break from the built environment.
Updates:
Maintain an adequate level of recreational staffing at park facilities (Program
7.2.2.1.).
The Community Services Department has added staff members for the new
Discovery Sports Complex.
Develop a Park Maintenance Master Plan to identify needed upgrades to existing
park facilities (Program 7.2.2.2.).
The Community Services department produces a
Needs Assessment, which identifies needed upgrades to existing park facilities and
other facilities operated by the Department.
Provide funding for park improvements in the upgrades to existing park facilities
in the Capital Improvement Program (Program 7.2.2.3.).
The Community Services
Department has been working on applying for the State’s new competitive grant pro-
gram, Proposition 84 (Statewide Park Development and Community Revitalization Pro-
gram of 2008). There will be two rounds awarding $368,000,000 to critically under-
served communities throughout California. As of July 1, 2009, the State’s 2009/10
Budget Act appropriated $184,000,000 for the first competitive round. If awarded this
grant, the Community Services Department will apply the funds towards Treasure Island
Park, Apollo Park Project and Rio Hondo Park Project.
Secure alternative means of funding, such as grants, donations, user fees and
public/private partnerships, for park upgrades (Program 7.2.2.5.).
The Community
Services Department applied state grants to fund the Discovery Sports Complex (State
Parks 2002 Per Capita= $307,258.00 and State Parks 2002 RZH = $280,163.00). Addi-
tionally, the City continues in participate in partnerships with different sport league pro-
grams for park upgrades. The Community Service Department has partnered up with
Northwestern Downey League, donating $20,000 for a new snack shack at Furman
Park.
35
City of Downey General Plan Annual Progress Report 2009
Develop a public park at the Downey Landing development site (Program 7.3.1.2.).
The Community Services Department completed the 11-acre, Discovery Sports Com-
plex in the summer of 2009, consisting of two (2) lighted soccer fields and two (2) lighted
baseball/ softball fields.
Develop an open space area or plaza in the downtown area (Program 7.3.1.3.).
The
Planning Division is proposing to incorporated open space areas in the new Downtown
Specific Plan.
Chapter 8: Design Element
Most residents, visitors, and businesses in Downey recognize the city as the premiere quality
city in the southeast area of Los Angeles County. However, others less familiar with the city’s
history may not share this perception and judge the city solely on the physical appearance of
the area. For this reason, it is important that the visual appearance of the community portray a
positive image and that the community image display the distinct and numerous resources it
has to offer.
Promote quality design for new, expanded, and remodeled construction (Goal
8.1).
The Planning Division has incorporated a Site Plan Review process that requires
all new and additions to commercial properties to be reviewed for the design, materials,
and colors, and to be approved by the Planning Commission.
Lack of property maintenance may exhibit a negative image of the City (Issue 8.2).
The Code Enforcement Division is currently monitoring over 200 properties and working
with 28 banks and/ or real estate companies in an effort to keep these properties main-
tained.
Promote compliance with code regulations (Policy 8.2.1.).
The Code Enforcement
Division has initiated a City wide temporary sign enforcement program and they have
submitted letters to all businesses owners in the City and begun issuing notices of viola-
tions.
Reuse existing historic architectural elements in new construction when preser-
vation of historic resources is not feasible (Program 8.4.2.5.).
The Economic Devel-
opment Division negotiated the purchase of the Downey Avenue Theater and plans to
preserve some of the architectural features that make the Theater a Downey cultural re-
source.
Encourage adaptive reuse of older structures (Program 8.4.2.4.).
As part of the re-
development of the Downey Avenue Theater and Verizon Building, the Economic Devel-
opment Division encouraged adaptive reuse as an option for prospective developers.
36
City of Downey General Plan Annual Progress Report 2009
Chapter 9: Economic Development
A strong community owes much to the spirit and involvement of its residents. Community pride
and civic-mindedness, however, are not enough for a city to provide all necessary and desired
services to maintain the local quality of life. A city needs a variety of employment and shopping
opportunities to create balance, make it a desirable place to live, and enhance its image.
Develop economic strategies for business attraction and retention (Program
9.1.1.1.).
Economic Development staff worked with the Downey Chamber of Commerce
and approximately 40 local restaurants in the community to bring forth the “Dine in
Downey” experience that was launched May 1st through May 17, 2009. Patrons with a
promotional coupon visiting a participating restaurant during this period received a 10%
discount. Staff members plan to build on the success of the Dine in Downey event and
expand this program next year.
Continue the revitalization of commercial and industrial corridors (Program
9.1.1.5.).
The Community Development Department has been working on the Down-
town Specific Plan. The Downtown Downey Specific Plan document will provide the
standards, guidelines, and concepts the City will use to create a dynamic downtown
area for the City and its residents. The Specific Plan will focus on creating a mixed-use
environment with a variety of residential and commercial uses, creating a “livable com-
munity” that encourages residents and downtown visitors to walk to various destina-
tions, and to “create a sense of place” within the downtown area. The City has selected
Hogle-Ireland, a consulting firm, to prepare the Downtown Downey Specific Plan.
Promote through public information the benefits of businesses locating in
Downey (Program 9.1.1.7.).
In 2009, the City created a “Welcome Packet” to enhance
and streamline our business entitlement process. It contains materials for businesses
coming to the City and includes a checklist to organize and simplify the required visits
needed from various departments in order to obtain proper business entitlements in
Downey. During the last year, Downey staff members have updated City marketing ma-
terials and will soon embark on a branding strategy for the City. Staff members are
also engaged in entitlement assistance to attract key businesses to Downey and ac-
tively profile and market the many opportunity sites located in Downey.
Convert paper-based information to digital-based formats to facilitate integration
into interdepartmental information networks (Program 9.4.2.4.).
The City has be-
gun implementing Accela Land Management, a software product that will manage all
land use and community development activities such as permits, inspections, reviews,
zoning, project plans, and permits issued by fire administration, code enforcement, and
public works. It is anticipated to be operational by Spring 2010.
37
City of Downey General Plan Annual Progress Report 2009
Expand the use of the city Internet web site for public information (Program
9.4.2.5.).
In 2009, various City Departments have worked towards improved customer
service by developing handouts for the public that include information about City Ser-
vices, the permitting process, business licensing, and Planning Development Stan-
dards. The City went through a website makeover in 2009. After interviewing the pro-
posal with the Website Ad-Hoc Committee, the City entered a contract with Civica Con-
tent Management System to update the City’s primary website. The City significantly
updated its website in March 2010 and is providing more information to constituents via
the Internet. The new website has been developed so that many current processes,
many of them paper-based, can move online and capture the efficiencies that this pro-
vides to Downey residents and to the City.
38