HomeMy WebLinkAbout08. Cash Contract 664B Fire Stn Walls AGENDA MEMO DATE: January 26, 2010 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: Brian A. Ragland, Director of Public Works SUBJECT: CASH CONTRACT NO. 664B FIRE STATION NO. 1 PERIMETER WALLS PROJECT RECOMMENDATION: That the City Council award Cash Contract No. 664B in the amount of $25,998 to Titanium Construction Group, Inc. for the Fire Station No. 1 Perimeter Walls Project. BACKGROUND: On June 24, 2008, the City Council approved the plans and specifications for the replacement of the existing chain link fence and old unreinforced block walls adjacent to the Emergency Operations Center (EOC) building at Fire Station No. 1, along the east side and south side of the facility along Orange Avenue. Included in the project was the demolition of the existing fencing and the installation of a new six-foot high concrete block wall and two remotely operated motorized sliding metal gates. The Council granted authority to advertise for bids as Cash Contract No. 664. On September 30, 2008, six bids were received and all bids substantially exceeded the project budget. On November 10, 2008, the City Council rejected all bids and granted authority to re-advertise for bids. On December 2, 2008, eight bids were received for the revised project under Cash Contract No. 664A. However, all bids received still exceeded both the engineer's estimate and the funding budgeted for the project. On January 27, 2009, the City Council rejected all bids. Staff from the Public Works Department and Fire Department continued to pursue and analyze other alternatives to reduce the scope and costs for the project while maintaining the intended objective of enhancing security at Fire Station No. 1. The project was ultimately divided into two phases and during its meeting of December 15, 2009, the City Council approved plans and specifications and granted authority to re- advertise for bids on the subject project under Cash Contract No. 664B. DISCUSSION: On January 12, 2010, fourteen bids were received ranging from $25,998 to $57,945 as shown on the attached bid summation. The apparent low bidder was Titanium Construction Group, Inc. with a bid of $25,998. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. 664B – Fire Station No. 1 Perimeter Walls Project January 26, 2010 Page 2 The work under this phase of the project will include the removal of the existing chain link fence and old unreinforced block walls and the construction of a six-foot eight-inch high split-face masonry block wall. New motorized sliding metal gates will be installed to replace the existing sliding chain link gates at a later date under the second phase of this project. FINANCIAL IMPACT: A detailed cost accounting and funding analysis, based upon the bid received from the Titanium Construction Group, Inc., is summarized below. The total estimated cost of the project is $41,298. Funds for the project, in the amount of $51,925, are included in the Fiscal Year 2009/2010 Budget. ESTIMATED PROJECT COSTS Total Bid Amount $25,998 Contingencies - 10% $3,900 TOTAL CONTRACT WORK: $29,898 Construction Surveying $2,100 Construction Engineering & Contract Administration $9,300 TOTAL PROJECT COST: $41,298 FUNDING Total Acct. No. Capital Projects Fund 40-13922 $51,925 $51,925 TOTAL PROJECT FUNDING: $51,925 Attachment: Bid Summation S:\AgendaMemosCC2010\01-26-10\CC664B FS 1 Walls ùûéôùíîèêûùèîíú öÓÊ×éÈÛÈÓÍÎîÍ ì×ÊÓÏ×È×ÊåÛÐÐÉìÊÍÒ×ÙÈ úóøéçïïûèóíî òÛÎÇÛÊà  èÓÈÛÎÓÇÏùÍÎÉÈÊÇÙÈÓÍÎ HYM Engineering, Inc.Riel Construction õÊÍÇÌóÎÙ ItemDescriptionQty.UnitUnit PriceAmount Unit PriceAmount çÎÓÈìÊÓÙ×ûÏÍÇÎÈ úûé÷úóøóè÷ïé Construct 6’-8” Reinforced Concrete Block Wall with A Normal Weight Single-Side Split Face Block 1 SF585$ 20.50$11,992.50$ 19.50$11,407.50    Construct 6’-8” Reinforced Concrete Block Wall with B Normal Weight Precision Block 2 SF725$ 12.90$ 9,352.50$ 18.90$13,702.50    C Construct Temporary 2-inch Thick Cold-Mix AC Pavement 3 SF82$ 10.00$ 820.00$ 8.60$ 705.20      D $ 25,815.2022,165.00$ èíèûðúûé÷úóøóè÷ïéóÈ×ÏÉ ÈÔÊÍÇÕÔ     ûðè÷êîûè÷úóøóè÷ïé Demolish and Dispose of Existing Block Wall and Foundation A-1 SF680$ 3.50$ 2,380.00$ 1.80$ 1,224.00    Demolish and Dispose of Existing PCC Slab and AC Pavement A-2 SF340$ 1.50$ 510.00$ 3.60$ 1,224.00     Construct PCC Slab A-3 SF50$ 12.50$ 625.00$ 6.00$ 300.00     E Construct AC Pavement A-4 SF155$ 9.00$ 1,395.00$ 19.35$ 2,999.25     F $ 5,747.254,910.00$ èíèûðûðè÷êîûè÷úóøóè÷ïéóÈ×ÏÉû ÈÔÊÍÇÕÔû     èíèûðúóøûïíçîèúÛÉ×úÓØóÈ×ÏÉ ÈÔÊÍÇÕÔ ÛÎØûÐÈ×ÊÎÛÈ×úÓØ G $ 31,562.4527,075.00$   óÈ×ÏÉû ÈÔÊÍÇÕÔû % Difference Between This Bid and Lowest Bidder:4.14%21.40% % Difference Between This Bid and Previous Low Bidder:4.14%16.57% íèô÷êúóøéê÷ù÷óæ÷øùíêê÷ùèóíîé ôû Rafael 26 Construction, Inc.$ 35,200.25Corrected Amount, Bid Read:11,407.00$ Simgel Co., Inc.$ 36,795.00Corrected Amount, Bid Read:13,702.00$ ú Sturgeon General, Inc.$ 39,431.00Corrected Amount, Bid Read:705.00$ ù JMJ Contractors, Inc.$ 41,133.29Corrected Total Base Bid Items, Bid Read:25,814.00$ óø EBS Concrete, Inc.$ 41,438.22Corrected Amount, Bid Read:3,000.00$ ÷ G Coast Construction, Inc.$ 43,555.00Corrected Total Alternate Bid Items, Bid Read:$ 5,748.00 ö Castillo Contractors Corporation$ 44,572.00Corrected Total Bid Amount, Bid Read:31,562.00$ õ Granstrom Masonry, Inc.$ 45,560.00Corrected Total Bid Amount, Bid Read:35,211.00$ ô Envirocon Contracting, Inc.$ 50,807.25Corrected Total Bid Amount, Bid Read:41,133.40$ òó El Camino Construction & Engineering Corporation$ 56,030.00Corrected Total Bid Amount, Bid Read:50,818.00$ ò Malibu Pacific Tennis Courts, Inc.$ 57,945.00 CC664B Bid Sum.xls