HomeMy WebLinkAboutResolution No. 24-8243 - Approving List of Projs in Proposed FY 24-25 CIP Prog funded by Senate Bill 1RESOLUTION NO.'24-8243
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY
APPROVING THE LIST OF PROJECTS IN THE PROPOSED FISCAL YEAR
2024/2025 CAPITALIMPROVEMENTPROGRAM TO BE FUNDED BY SENATE
BILL 1 THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017 was
passed by the Legislature and signed into law by the Governor in April 2017 in order to address
the significant multi -modal transportation funding shortfalls statewide; and
WHEREAS, SB1 includes accountability and transparency provisions that will ensure the
residents of the City of Downey are aware of the projects proposed for funding in our community
and which projects are in progress or have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion; and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $2,916,275 in`RMRA funding in Fiscal Year
2024/2025 from SB1; and
WHEREAS, this is the seventh year in which the City is receiving SB 1 funding, which will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public 'input into
our community's transportation priorities; and
WHEREAS, the City used a Pavement Management System to develop the SB1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet thecommunity's priorities for transportation investment; and
WHEREAS, the funding from SB1 will help the City maintain and rehabilitate a number of
street pavement rehabilitation projects and add active transportation infrastructure throughout the
City this year and hundreds of similar projects into the future; and
WHEREAS, the 2021 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an at -risk condition, and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a good condition; and
WHEREAS, the local street and road system is also critical for farm to market needs,
interconnectivity, multimodal needs, and commerce; and
WHEREAS, police, fire, and emergency medical services all need safe reliable, roads to
react quickly to emergency calls, and a few minutes of delay can be a matter of life and death; and
WHEREAS, restoring roads before they fail also reduces construction time which results
in less air pollution from heavy equipment and less water pollution from site run-off; and
RESOLUTION NO. 24-8243
PAGE NO. 2
WHEREAS, the SB 1 project list, attached herein as Exhibit "A" and °B", and overall
investment in our local streets and roads infrastructure with a focus on basic maintenance and
safety, investing in complete streets infrastructure, and using cutting -edge technology, materials
and practices, will have significant positive co -benefits statewide.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The City Council of the City of Downey hereby approves the list of newly
proposed projects attached herein as Exhibit "A" to be 'funded In Fiscal Year 2024/2025 with
RMRA revenues.
SECTION 2. The City Council of the City of Downey hereby approves the list of projects
previously proposed and adopted from Fiscal Year 2023/2024 attached herein as Exhibit "B and
may also utilize Fiscal Year 2024/2025 RMRA revenues in their delivery. With the relisting of
these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the
State the City's intent to fund these projects with RMRA revenues.
SECTION 3. This Resolution shall take effect immediately upon its adoption by the City
Council, and the City Clerk shall attest to and certify the vote adopting this Resolution.
APPROVED AND ADOPTED this 28th day of May, 2024.
ATTEST: MARIO TRUJILLO, May
KAARM ALICIA DUART , CMC
City Clerk
APPROVED AS TO FORM:
IZILI W4 T/w,
JOHN .FUNK
City Attorney
RESOLUTION NO. 24-8243
PAGE NO. 3
1 HEREBY CERTIFY that the foregoing Resolution was adopted by the City Council of the
City of Downey at a Regular meeting held on the 281h day of May, 2024, by the following vote, to
wit:
AYES: Council Members Frometa, Ortiz, Pemberton, Sosa, Mayor Trujillo
NOES: Council Member: None.
ABSENT: Council Member: None.
ABSTAIN. Council Member: None.
A A ALICIA DUART , CMC
City Clerk
Exhibit "A
List of Projects in the Proposed FY 2024/2025 Capital
Improvement Program to be Funded by Senate Bill 1 (B1) The
Road Repair and Accountability Act
Estimated '
Proposed
Project
Description
Location
Useful
Schedule of
Life
Completion
Rehabilitation of pavement
on various residential
streets and replacement of
1. Residential
damaged sidewalk and
Streets Pavement
curb and gutter and
Area 3
20 years
06/2025
Rehabilitation —
reconstruction of curb
Area 3
access ramps to comply
with current ADA
requirements.
Annual miscellaneous
2. FY 24/25
concrete construction and
Miscellaneous
Repairs of concrete
Concrete :Repairs
surfaces in Council District
Council District
20 years
06/2025
2 and construction of ADA-
2
and ADA
compliant curb access
Improvements
ramps; drive approaches
and sidewalks
Rehabilitation of pavement
on various residential
streets and replacement of
3. Residential
damaged sidewalk and
Streets Pavement
curb and gutter and
Area 6
20 years
06/2025
Rehabilitation —
reconstruction of curb
Area 6
access ramps to comply
with current ADA
requirements.
ATTACHMENT B
Exhibit 60E99
List of Carryover Projects in the FY 223/224 Capital
Improvement Program Funded by Senate Bill 1 ( 1): The
Road Repair and Accountability Act
Estimated
Proposed
Project
Description
Location
Useful Life '
Schedule of
Com'letion
Rehabilitation of existing
asphalt pavement, repair of
4. Downey Avenue
existing miscellaneous
to
Pavement
concrete surfaces,
5 St. to
20 years
0612025
Rehabilitation
replacement of existing
Alameda St,
striping and pavement
markings and installation of
bike lanes (PS&E only).
Update Citywide Pavement
5. Pavement
Management Plan to
Citywide
3 years
12/2024
Management Plan
prioritize the City's street
paving needs.
Rehabilitation of pavement on
6. Residential
various residential streets and '
Streets Pavement
replacement of damaged
sidewalk and curb and gutter
Area 7
20 years
12/2024
Rehabilitation —
and reconstruction of curb
Area 7
access ramps to comply with
current ADA requirements.
Rehabilitation of existing
7. Lakewood
asphalt pavement, repair of
Boulevard
existing miscellaneous
U.P.R.R. to
20 years
03/2026
Pavement '
concrete surfaces and
Imperial Hwy.
Rehabilitation
replacement of existing striping
and pavement markings: