Loading...
HomeMy WebLinkAboutAttachment D - TIAAttachment D prepared by Bryan Crawford Giancarlo Ganddini, PE, PTP GANDDINI GROUP, INC. 555 Parkcenter Drive, Suite 225 Santa Ana, California 92705 714.795.3100 | ganddini.com Project No. 19658 7360 FOSTER BRIDGE RESIDENTIAL PROJECT TRAFFIC AND CIRCULATION ANALYSIS (REVISED) City of Downey November 15, 2023 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) i 19658 TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................................................ IV 1. INTRODUCTION .................................................................................................................................................... 1 Purpose .............................................................................................................................................................................. 1 Project Description .......................................................................................................................................................... 1 Scope of Analysis ............................................................................................................................................................. 1 Study Area ............................................................................................................................................................. 2 Analysis Scenarios ................................................................................................................................................ 2 2. METHODOLOGY ................................................................................................................................................... 5 Intersection Delay Analytical Methodology ............................................................................................................. 5 Performance Standards ...................................................................................................................................... 5 Roadway Segment Capacity Analytical Methodology ........................................................................................... 6 3. EXISTING CONDITIONS ...................................................................................................................................... 8 Existing Roadway System .............................................................................................................................................. 8 Pedestrian Facilities ......................................................................................................................................................... 8 Bicycle Routes .................................................................................................................................................................. 8 Transit Facilities ................................................................................................................................................................ 9 General Plan Context ..................................................................................................................................................... 9 Existing Traffic Volumes ................................................................................................................................................ 9 Existing Levels of Service .............................................................................................................................................. 9 Existing Traffic Signal Warrants ................................................................................................................................... 9 4. PROJECT FORECASTS ....................................................................................................................................... 23 Project Trip Generation .............................................................................................................................................. 23 Project Trip Distribution and Assignment .............................................................................................................. 23 5. FUTURE VOLUME FORECASTS ...................................................................................................................... 31 Other Development ..................................................................................................................................................... 31 Ambient Growth ........................................................................................................................................................... 31 Analysis Scenario Volume Forecasts ....................................................................................................................... 31 Existing Plus Ambient Growth Plus Cumulative ....................................................................................... 31 Existing Plus Ambient Growth Plus Cumulative Plus Project ................................................................ 31 6. FUTURE OPERATIONAL ANALYSIS ............................................................................................................... 40 Existing Plus Ambient Growth Plus Cumulative ................................................................................................... 40 Existing Plus Ambient Growth Plus Cumulative Plus Project............................................................................ 40 Future Traffic Signal Warrant Analysis ................................................................................................................... 40 7. SITE ACCESS AND CIRCULATION .................................................................................................................. 46 Project Design Features .............................................................................................................................................. 46 8. CONGESTION MANAGEMENT PROGRAM ................................................................................................. 47 Criteria for Requiring a Traffic Impact Analysis for CMP ................................................................................... 47 CMP Transit Impact Review ...................................................................................................................................... 47 9. CONCLUSIONS .................................................................................................................................................... 49 Project Trip Generation .............................................................................................................................................. 49 Forecast Levels of Service .......................................................................................................................................... 49 Congestion Management Program .......................................................................................................................... 49 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) ii 19658 APPENDICES Appendix A Glossary Appendix B Scoping Agreement Appendix C Volume Count Worksheets Appendix D Level of Service Worksheets Appendix E Traffic Signal Warrant Graphs LIST OF TABLES Table 1. County of Los Angeles Roadway Segment Daily Capacities .................................................................... 7 Table 2. Existing Roadway Segment Daily Capacity Analysis ................................................................................ 11 Table 3. Existing Intersection Level of Service .......................................................................................................... 12 Table 4. Existing Trip Generation .................................................................................................................................. 24 Table 5. Project Trip Generation ................................................................................................................................... 25 Table 6. Project Trip Generation Comparison ........................................................................................................... 26 Table 7. Other Development Trip Generation .......................................................................................................... 32 Table 8. Existing Plus Ambient Growth Plus Cumulative Roadway Segment Daily Capacity Analysis ................................................................................................................................................................ 42 Table 9. Existing Plus Ambient Growth Plus Cumulative Intersection Level of Service ................................ 43 Table 10. Existing Plus Ambient Growth Plus Cumulative Plus Project Roadway Segment Daily Capacity Analysis .............................................................................................................................................. 44 Table 11. Existing Plus Ambient Growth Plus Cumulative Plus Project Intersection Level of Service.................................................................................................................................................................. 45 LIST OF FIGURES Figure 1. Project Location Map .......................................................................................................................................... 3 Figure 2. Site Plan .................................................................................................................................................................. 4 Figure 3. Existing Lane Geometry and Intersection Traffic Controls .................................................................... 13 Figure 4. Existing Pedestrian Facilities .......................................................................................................................... 14 Figure 5. County of Los Angeles Bikeways Map ........................................................................................................ 15 Figure 6. Los Angeles County Metropolitan Transportation Authority System Map ....................................... 16 Figure 7. City of Downey Circulation Plan .................................................................................................................. 17 Figure 8. City of Downey Roadway Cross-Sections ................................................................................................. 18 Figure 9. City of Bell Gardens Circulation Plan .......................................................................................................... 19 Figure 10. City of Bell Gardens Roadway Cross-Sections ......................................................................................... 20 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) iii 19658 Figure 11. Existing AM Peak Hour Intersection Turning Movement Volumes ..................................................... 21 Figure 12. Existing PM Peak Hour Intersection Turning Movement Volumes ..................................................... 22 Figure 13. Existing Trip Distribution ................................................................................................................................ 27 Figure 14. Project Trip Distribution .................................................................................................................................. 28 Figure 15. Project AM Peak Hour Intersection Turning Movement Volumes ...................................................... 29 Figure 16. Project PM Peak Hour Intersection Turning Movement Volumes ...................................................... 30 Figure 17. Other Development Location Map .............................................................................................................. 33 Figure 18. Other Development AM Peak Hour Intersection Turning Movement Volumes ............................. 34 Figure 19. Other Development PM Peak Hour Intersection Turning Movement Volumes .............................. 35 Figure 20. Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Intersection Turning Movement Volumes ......................................................................................................................................... 36 Figure 21. Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Intersection Turning Movement Volumes ......................................................................................................................................... 37 Figure 22. Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Intersection Turning Movement Volumes ......................................................................................................................... 38 Figure 23. Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Intersection Turning Movement Volumes ......................................................................................................................... 39 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) iv 19658 EXECUTIVE SUMMARY The 1.3-acre project site is located at 7360 Foster Bridge Boulevard in the City of Downey. The project site is currently developed with an 8,480 square foot church which is proposed to be demolished. The proposed project involves construction of a new multifamily residential development with a total of 33 dwelling units. The proposed project is anticipated to be constructed and fully operational by year 2025. The project involves a Zone Change from R-1 to R-3 and General Plan Amendment (GPA) to change the General Plan land use designation from LDR (Low Density Residential) to MDR (Medium Density Residential). The project site is proposed to provide one full access driveway on Foster Bridge Boulevard and will have gated entry. An emergency vehicle access only driveway is proposed on Suva Street. Existing Conditions The existing roadway segments currently operate within acceptable Levels of Service. The study intersections currently operate at acceptable Levels of Service during the peak hours for existing conditions. Project Trip Generation The existing land uses currently generate approximately 64 daily trips, including 3 trips during the AM peak hour and 4 trips during the PM peak hour. The proposed project is forecast to generate approximately 222 daily trips, including 13 trips during the AM peak hour and 17 trips during the PM peak hour. The proposed project is forecast to generate approximately 158 additional daily trips compared to existing project site uses, including 10 additional trips during the AM peak hour and 13 additional trips during the PM peak hour. Forecast Levels of Service For Existing Plus Ambient Growth Plus Cumulative traffic conditions, the study roadway segments are projected to operate at acceptable Levels of Service, except for the following roadway segment that is projected to operate at unacceptable Levels of Service, without improvements:  Paramount Boulevard, East of Suva Street Although this roadway segment is projected to operate at an unacceptable Level of Service, the intersection of Suva Street at Paramount Boulevard (Int. #4) is projected to operate within acceptable Levels of Service during the peak hours. Two through lanes along Paramount Boulevard are maintained through the intersection of Suva Street. Thus, since the roadway segment acts as a free-flowing corridor between points of conflict (intersections), and the point of conflict (Suva Street at Paramount Boulevard – Intersection # 4) is projected to operate at acceptable Levels of Service during the peak hours, improvements are not recommended along this roadway segment. In addition, the project is forecast to add a relatively negligible number of trips per day along this segment such that no appreciable change in the volume-to-capacity ratio is expected for Existing Plus Ambient Growth Plus Cumulative Plus Project conditions. Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) v 19658 The study intersections are forecast to operate within acceptable Levels of Service during the peak hours for Existing Plus Ambient Growth Plus Cumulative and Existing Plus Ambient Growth Plus Cumulative Plus Project conditions; no intersection improvements are recommended. Congestion Management Program The proposed project would result in no operational CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes and no further CMP analysis is warranted. A transit impact review was conducted for compliance with the CMP requirements and found that the proposed project is forecast to have a nominal impact on transit demand. Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 1 19658 1. INTRODUCTION This section describes the purpose of this traffic and circulation analysis, project location, proposed development, and study area. Figure 1 shows the project location map. Figure 2 illustrates the project site plan. Although this is a technical report, every effort has been made to write the report clearly and concisely. To assist the reader with those terms unique to transportation engineering, a glossary of terms is provided in Appendix A PURPOSE The purpose of this study is to evaluate the potential for transportation impacts resulting from development of the proposed project both in the context of the City of Downey’s discretionary authority for conformance with locally established operational standards. Assessment of the project’s vehicle miles traveled (VMT) impact is evaluated in a separate document for compliance with the California Environmental Quality Act (CEQA). Although this is a technical report, effort has been made to write the report clearly and concisely. A glossary is provided in to assist the reader with terms related to transportation engineering. This study was prepared in consultation with City of Downey staff and in accordance with the procedures and methodologies for assessing transportation impacts established by the City. To assess the project’s conformance with local operational standards, this study evaluates the project’s effect on traffic operations and, if necessary, identifies recommended improvements or corrective measures to alleviate operational deficiencies substantially caused or worsened by the proposed project. PROJECT DESCRIPTION The 1.3-acre project site is located at 7360 Foster Bridge Boulevard in the City of Downey. The project site is currently developed with an 8,480 square foot church which is proposed to be demolished. The proposed project involves construction of a new multifamily residential development with a total of 33 dwelling units. The proposed project is anticipated to be constructed and fully operational by year 2025. The project involves a Zone Change from R-1 to R-3 and General Plan Amendment (GPA) to change the General Plan land use designation from LDR (Low Density Residential) to MDR (Medium Density Residential). The project site is proposed to provide one full access driveway on Foster Bridge Boulevard and will have gated entry. An emergency vehicle access only driveway is proposed on Suva Street. SCOPE OF ANALYSIS The scope of this analysis was determined in consultation with City of Downey staff as documented in the City-approved scoping agreement provided in Appendix B. 1 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 2 19658 Study Area Based on the study intersections identified in the approved scoping agreement, the study area consists of the following study intersections and roadway segments within the City of Downey: Study Intersections Jurisdiction 1. Suva Street (NS) at Scout Avenue (EW) Bell Gardens 2. Suva Street (NS) at Bluff Road/Foster Bridge Boulevard (EW) Downey 3. Suva Street (NS) at Guatemala Avenue (EW) Downey 4. Suva Street (NS) at Paramount Boulevard (EW) Downey 5. Foster Bridge Boulevard (NS) at Project Driveway (EW) Downey Notes: (NS) = north-south roadway; (EW) = east-west roadway Study Roadway Segments Jurisdiction 1. Suva Street, between Scout Avenue and Bluff Road Downey 2. Suva Street, between Bluff Road and Guatemala Avenue Downey 3. Scout Avenue, west of Suva Street Bell Gardens 4. Paramount Boulevard, east of Suva Street Downey 4. Paramount Boulevard, west of Suva Street Downey 5. Foster Bridge Boulevard, north of Bluff Road Downey Analysis Scenarios In accordance with City of Downey requirements, the following scenarios are analyzed for weekday AM and PM peak hour conditions:  Existing (2023);  Existing Plus Ambient Growth Plus Cumulative (2025); and  Existing Plus Ambient Growth Plus Cumulative Plus Project (2025). 2 Attachment D Figure 1Project Location Map7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#53Attachment D Figure 2 Site Plan 7360 Foster Bridge Residential Project Traffic And Circulation Analysis 19658 N 4 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 5 19658 2. METHODOLOGY This section discusses the analysis methodologies used to assess transportation facility performance as adopted by the respective jurisdictional agencies. In the absence of published traffic study guidelines from the City of Downey, the City generally follows the County of Los Angeles guidelines. Accordingly, this analysis has been performed based on the Los Angeles County Public Works Transportation Impact Analysis Guidelines (July 23, 2020). INTERSECTION DELAY ANALYTICAL METHODOLOGY The methodology used to assess the performance of intersections is known as the intersection delay methodology based on the procedures contained in the Highway Capacity Manual. The methodology compares the traffic volume using the intersection to the capacity of the intersection to calculate the delay associated with the traffic control at the intersection. The intersection delay is then correlated to a performance measure known as Level of Service based on the following thresholds: Level of Service Intersection Control Delay (Seconds / Vehicle) Signalized Intersection Unsignalized Intersection A ≤ 10.0 ≤ 10.0 B > 10.0 to ≤ 20.0 > 10.0 to ≤ 15.0 C > 20.0 to ≤ 35.0 > 15.0 to ≤ 25.0 D > 35.0 to ≤ 55.0 > 25.0 to ≤ 35.0 E > 55.0 to ≤ 80.0 > 35.0 to ≤ 50.0 F > 80.0 > 50.0 Source: Highway Capacity Manual (Transportation Research Board, 7th Edition). Level of Service is used to qualitatively describe the performance of a roadway facility, ranging from Level of Service A (free-flow conditions) to Level of Service F (extreme congestion and system failure). Intersection delay analysis was performed using the Vistro software. If the paved lane width of a shared through/right turn lane is wide enough to permit a separate right turn, it is common practice for a right turn lane to be considered “de facto.” To function as a de facto right turn lane there must be sufficient width for right turning vehicles to travel outside the through lane. This analysis uses a minimum lane width of 20 feet from curb to lane stripe. Additionally, a de facto right turn lane was only considered where on-street parking is prohibited near the intersection approach. Performance Standards The City of Downey General Plan Circulation Element has established LOS D as the minimum acceptable Level of Service at intersections and roadway segments. If a project is forecast to result in a substantial operational deficiency, recommended corrective measures will be identified that would reduce the project’s effect to a level that does not exceed the specified deficiency criteria. Corrective measures can be in many forms, including the construction of physical improvements (e.g., addition of travel lanes, traffic control modifications, etc.) or the implementation of transportation demand management measures. 5 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 6 19658 ROADWAY SEGMENT CAPACITY ANALYTICAL METHODOLOGY The technique used to assess the capacity needs of the roadway is known as the Volume to Capacity Ratio. Roadway segment operations were evaluated using daily volume to daily capacity ratios, (V/C). The average daily traffic volumes of the study roadways were compared with the county standards by roadway classification. General volume to capacity ratio ranges used for the purposes of estimating overall daily performance along the study roadway segments are as follows in conformance with the City of Downey General Plan: 0.00– 0.80 = Acceptable Capacity. This represents a range of free flow to stable flow, where the unrestricted speed and freedom to maneuver begins to become more limited by the increase in traffic. In general, the driver experiences only minor inconvenience, and traffic flow is quick but light during off-peak hours. 0.81 – 1.00 = Approaches Capacity. This represents high-density but stable flow, where speed and freedom to maneuver are restricted. In general, the driver experiences a degree of inconvenience during peak hours, and traffic flow is slow but steady during peak hours. 1.00 + = Potentially Exceeds Capacity. This is used to define forced or breakdown flow during peak hours. This condition exists wherever the amount of traffic exceeds the amount which can reasonably be handled by the roadway. In general, the driver experiences a high degree of inconvenience, and traffic flow is extremely slow with stop-and-go flow and traffic queues begin to form. This condition is typical of the breakdown in flow which occurs when an accident is present on the roadway. A roadway segment is considered to operate within an acceptable level when the average daily traffic volume is below the daily roadway capacity. Table 1 shows the daily roadway capacities by roadway classification as established in the County of Los Angeles General Plan Update.1 The roadway segment capacity thresholds represent the theoretical maximum two-way average daily traffic volumes that any given roadway is able to accommodate within one day, given typical peak hour characteristics. Generally, roadway segment analysis is performed for planning purposes to determine where potential capacity issues may occur during peak hours and is affected by such factors as the number of intersections (spacing, configuration and control features), degree of access control, roadway grades, design geometrics (horizontal and vertical alignments), sight distance, vehicle mix (truck and bus traffic), and bicycle/pedestrian traffic. Roadway segments benefit from on-going traffic signal progression timing adjustments that maximize green time during peak traffic demands. In the cases where the roadway segment potentially exceeds daily capacity, further evaluation of peak hour operations should be considered. As intersections are typically the most constrained points along a roadway segment, a roadway segment may be considered to operate acceptably if the intersections on both ends of the roadway segment operate acceptably during peak hours, even if the average daily traffic volume exceeds the theoretical capacity. 1 Programmatic Traffic Impact Study County of Los Angeles General Plan Update (Iteris, June 10, 2014) 6 Attachment D A B C D E Major Highway 6 32,400 37,800 43,200 48,600 54,000 Major Highway 8 43,200 50,400 57,600 64,800 72,000 Secondary Highway 4 21,600 25,200 28,800 32,400 36,000 Limited Secondary Highway 4 21,600 25,200 28,800 32,400 36,000 Limited Secondary Highway 2 10,800 12,600 14,400 16,200 18,000 Parkway 2+Varies Varies Varies Varies Varies Collector 2 9,000 10,500 12,000 13,500 15,000 Local St 2 1,500 1,750 2,000 2,250 2,500 Expressway 4 26,400 30,800 35,200 39,600 44,000 Expressway 8 52,800 61,600 70,400 79,200 88,000 Volume Level to of Capacity Service Ratio A 0.000 - 0.600 B 0.601 - 0.700 C 0.701 - 0.800 D 0.801 - 0.900 E 0.901 - 1.000 F >1.000 Notes: (2) Average Daily Traffic Volumes (1) Source: Programmatic Traffic Impact Study County of Los Angeles General Plan Update (Iteris, June 10, 2014); Table 4: Roadway Classifications. (3) These roadway capacities are "rule of thumb" estimates for planning purposes. The Level of Service "E" volumes are estimated maximum daily capacity for respective classifications. Maximum Two-Way Traffic Volume (ADT)1,2 Level of Service Table 1 County of Los Angeles Roadway Segment Daily Capacities Roadway Classification Number of Lanes 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 196587 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 8 19658 3. EXISTING CONDITIONS EXISTING ROADWAY SYSTEM Figure 3 identifies the lane geometry and intersection traffic controls for Existing conditions based on a field survey of the study area. Regional access to the project area is provided by the Interstate 5 freeway approximately 0.9 miles northeast of the project site and the I-710 freeway approximately 1.80 miles west of the project site. The key north-south roadways providing local circulation are Suva Street and Foster Bridge Boulevard. The key east-west roadways providing local circulation are Scout Avenue, Bluff Road, Guatemala Avenue, and Paramount Boulevard. Suva Street is a 2-lane undivided roadway in the study area. Suva Street is classified as a Collector north of Paramount Boulevard to the City of Downey boundary and unclassified south of Paramount Boulevard in the City of Downey Circulation Plan. The City of Bell Gardens also classifies Suva Street as a Collector north of the City boundary. On-street parking is generally permitted in the project area. No bicycle facilities are provided in the study area, Sidewalks are provided on both sides of the roadway north of Paramount Boulevard and not provided south of Paramount Boulevard. Foster Bridge Boulevard is a 2-lane undivided roadway in the study area. Foster Bridge Boulevard is classified as a Collector in the City of Downey Circulation Plan. On-street parking is generally permitted in the project area. No bicycle facilities are provided in the study area. Sidewalks are provided on both sides of the roadway. Scout Avenue is a 4-lane undivided roadway in the study area. Scout Avenue is classified as an Avenue in the City of Bell Gardens Circulation Plan. On-street parking is generally permitted in the project area. No bicycle facilities are provided in the study area. Sidewalks are provided on the north side of the roadway. Bluff Road is a 2-lane undivided roadway in the study area. Bluff Road is classified as a Collector east of Suva Street and is not classified west of Bluff Road in the City of Downey Circulation Plan. On-street parking is generally prohibited in the project area. No bicycle facilities are provided in the study area. Sidewalks are provided on both sides of the roadway west of Suva Street and not provided east of Suva Street. Guatemala Avenue is a 2-lane undivided roadway in the study area. Guatemala Avenue is not classified in the City of Downey Circulation Plan. On-street parking is generally permitted in the project area. No bicycle facilities are provided in the study area. Sidewalks are intermittently provided on the north side of the roadway east of Suva Street and generally not provided west of Suva Street and on the south side of the roadway east of Suva Street. Paramount Boulevard is a 4-lane divided roadway in the study area. Paramount Boulevard is classified as a Major Arterial in the City of Downey Circulation Plan. On-street parking is prohibited in the project area. No bicycle facilities are provided in the study area. Sidewalks are provided on both sides of the roadway. PEDESTRIAN FACILITIES Existing pedestrian facilities in the project vicinity are shown on Figure 4. BICYCLE ROUTES No on-street bicycle facilities are provided in the project area. The County of Los Angeles Bikeways Map is depicted on Figure 5, and shows the Rio Hondo bike path just south of the project site with bike path access points located on the southern boundary of Bluff Road near the project site. 8 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 9 19658 TRANSIT FACILITIES Figure 6 shows the existing transit routes available in the project vicinity. As shown on Figure 6, Los Angeles County Metropolitan Transportation Authority Route 265 services Paramount Boulevard. GENERAL PLAN CONTEXT Figure 7 shows the City of Downey Circulation Plan roadway classifications map. This figure shows the nature and extent of arterial and collector highways that are needed to adequately serve the ultimate development depicted by the Land Use Element of the General Plan. The City of Downey standard roadway cross-sections are illustrated on Figure 8. Figure 9 shows the City of Bell Gardens Circulation Plan roadway classifications map. This figure shows the nature and extent of arterial and collector highways that are needed to adequately serve the ultimate development depicted by the Land Use Element of the General Plan. The City of Bell Gardens standard roadway cross-sections are illustrated on Figure 10. EXISTING TRAFFIC VOLUMES Figure 11 and Figure 12 show the Existing AM and PM peak hour intersection turning movement volumes. Existing peak hour intersection volumes are based upon AM peak period and PM peak period intersection turning movement counts obtained in August 2023 during typical weekday conditions when schools were in session. The weekday AM peak period was counted between 7:00 AM and 9:00 AM and the weekday PM peak period was counted between 4:00 PM and 6:00 PM; these periods capture the peak times for commuter traffic when the roadway system is typically experiencing peak demand. The actual peak hour within each two-hour count period is determined based on the sum of the four consecutive 15-minute periods with the highest total volume. Thus, the weekday PM peak hour at one intersection may be 4:45 PM to 5:45 PM if those four consecutive 15-minute periods have the highest total volume and may vary at other intersections. Intersection turning movement count worksheets are provided in Appendix C. Existing average daily traffic volumes have been based 24-hour roadway segment counts obtained by Ganddini Group, Inc. in August 2023 (see Appendix C) for the roadway segments that have been analyzed in this report as part of the roadway segment analysis. EXISTING LEVELS OF SERVICE The roadway segment Levels of Service for Existing conditions are shown in Table 2. As shown in Table 2, the existing roadway segments currently operate within acceptable Levels of Service. The intersection Levels of Service for existing conditions are shown in Table 3. Existing intersection Level of Service worksheets are provided in Appendix D. As shown in Table 3, the study intersections currently operate within acceptable Levels of Service during the peak hours for existing conditions. EXISTING TRAFFIC SIGNAL WARRANTS The application of traffic control devices is governed by Federal standards adopted by the State of California and contained in the California Manual on Uniform Traffic Control Devices (California Department of Transportation, 2014 Edition) [“CA MUTCD”]. Part 4C – Traffic Control Signal Needs Studies of the CA MUTCD contains a series of warrants, or criteria, which serve to determine whether installation of a traffic signal is justified at a particular location. The CA MUTCD states that a traffic control signal should not be installed unless one or more warrants are satisfied. Application of the traffic signal warrants should be based 9 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 10 19658 on engineering judgement and satisfaction of one or more traffic signal warrants shall not in itself require the installation of a traffic signal. The unsignalized study intersection of Suva Street and Guatemala Avenue was evaluated for the potential need to install a traffic signal using the CA MUTCD peak hour traffic signal warrant graphs (Warrant 3). Peak hour traffic signal warrant worksheets are provided in Appendix E. For existing conditions, a traffic signal does not appear to be warranted at the intersection of Suva Street/Guatemala Avenue based on the CA MUTCD peak hour traffic signal warrant graphs (Warrant 3). 10 Attachment D Lanes Capacity2 Scout Ave to Bluff Road 2 15,000 6,354 0.42 Acceptable A Bluff Road to Guatemala Ave 2 15,000 11,972 0.80 Acceptable C Scout Ave West of Suva St 4 36,000 7,036 0.20 Acceptable A East of Suva St 4 36,000 35,660 0.99 Approaches Capacity E West of Suva St 4 36,000 33,234 0.92 Approaches Capacity E Foster Bridge Blvd North of Bluff Road 2 15,000 4,094 0.27 Acceptable A Notes: (1) See Table 1. (2) The County of Los Angeles roadway maximum capacity at Level of Service "E" (see Table 1). (3) ADT = Average Daily Traffic Volume. (4) V/C = Volume to Capacity Ratio. (5) LOS = Level of Service (Based on the Level of Service standards on Table 1). Table 2 Existing Roadway Segment Daily Capacity Analysis Classification Suva St Collector Collector Roadway Segment Standards1 V/C4Existing ADT3RoadwaySegment LOS5Capacity Threshold Ave Major Arterial Major Arterial Collector Paramount Blvd 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965811 Attachment D Delay2 LOS3 Delay2 LOS3 1. Suva St at Scout Ave AWS 16.9 C 11.6 B 2. Suva St at Bluff Rd/Foster Bridge Blvd TS 15.9 B 12.8 B 3. Suva St at Guatemala Ave AWS 19.6 E 28.0 D 4. Suva St at Paramount Blvd TS 20.8 C 34.6 C Notes: (1) AWS = All Way Stop; TS = Traffic Signal (2) (3) LOS = Level of Service ID Table 3 Existing Intersection Level of Service Traffic Control1 AM Peak Hour PM Peak Hour Delay is shown in seconds/vehicle. For intersections with traffic signal or all way stop control, overall average intersection delay and LOS are shown. Study Intersection 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965812 Attachment D Figure 3Existing Lane Geometry and Intersection Traffic Controls7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 23451Suva St (NS)/Scout Ave (EW)3Suva St (NS)/Guatemala Ave (EW)4Suva St (NS)/Paramount Blvd (EW)5Foster Bridge Blvd (NS)/Project Dwy (EW)Suva St (NS)/Bluff Rd (EW)2Foster B r i d g e BlvdAWSSTOPAWSSTOPSTOPAWS#U#DLegendExisting Lane#-Lane Undivided Roadway#-Lane Divided RoadwayStop SignAll Way StopTraffic Signal2U2U2U2U2U2U2U2U2U2U4D4D4U4Udd De Facto Right Turn Lane13Attachment D Figure 4Existing Pedestrian Facilities7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658NSiteSCOUT AVE FOST ER BRIDGE BL VDBLUFF RDSUVA STSidewalkLegendCross Walk14Attachment D Figure 5County of Los Angeles Bikways Map7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658NSiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V DExisting Bikeway PathLegendBike Path Access PointSource: County of Los Angeles15Attachment D Figure 6 Los Angeles County Metropolitan Transportation Authority System Map 7360 Foster Bridge Residential Project Traffic And Circulation Analysis 19658 Source: L.A. Metro N Site 16 Attachment D Figure 7 City of Downey Circulation Plan 7360 Foster Bridge Residential Project Traffic And Circulation Analysis 19658 N Source: City of Downey Site 17 Attachment D Figure 8 City of Downey Roadway Cross-Sections 7360 Foster Bridge Residential Project Traffic And Circulation Analysis 19658 Source: City of Downey 18 Attachment D Figure 9 City of Bell Gardens Circulation Plan 7360 Foster Bridge Residential Project Traffic And Circulation Analysis 19658 Source: City of Bell Gardens Site 19 Attachment D Figure 10 City of Bell Gardens Roadway Cross-Sections 7360 Foster Bridge Residential Project Traffic And Circulation Analysis 19658 Source: City of Bell Gardens 20 Attachment D Figure 11Existing AM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)1 1 8 8 32Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)137 83 1 73 65 11010258160 1273513Suva St (NS)/Guatemala Ave (EW)12 193 4 97 301 1541062713 4201244Suva St (NS)/Paramount Blvd (EW)16 17 34 200 25 16710511219 1311001315Foster Bridge Blvd (NS)/Project Dwy (EW)0 178 189 0 002 218 214 2 2375 2041110621Attachment D Figure 12Existing PM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)2 1 9 9 52Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)163 108 5 7 173 35 2388242136153Suva St (NS)/Guatemala Ave (EW)12 345 12 134 410 131 7536121426924Suva St (NS)/Paramount Blvd (EW)5 6 4 205 28 161 961132241412631765Foster Bridge Blvd (NS)/Project Dwy (EW)0 187 206 0 000 259 180 11 4253 002500522Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 23 19658 4. PROJECT FORECASTS This section describes how project trip generation, trip distribution, and trip assignment forecasts were developed. The forecast project volumes are illustrated on figures contained in this section. PROJECT TRIP GENERATION Table 4 and Table 5 show the existing land uses and project trip generation for potential church and residential uses based upon trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021). Based on review of the ITE land use descriptions, trip generation rates for Church (ITE Land Use Code 560) and Multi-Family Housing (Low-Rise) (ITE Land Use Code 220) were determined to adequately represent the existing land use and proposed project and were used for calculating the project trip generation forecasts. The existing land use and project trip generation forecasts were determined by multiplying the trip generation rates by the land use quantities. As shown in Table 4, the existing land uses currently generate approximately 64 daily trips, including 3 trips during the AM peak hour and 4 trips during the PM peak hour. As shown in Table 5, the proposed project is forecast to generate approximately 222 daily trips, including 13 trips during the AM peak hour and 17 trips during the PM peak hour. As shown in Table 6, the proposed project is forecast to generate approximately 158 additional daily trips compared to existing project site uses, including 10 additional trips during the AM peak hour and 13 additional trips during the PM peak hour. PROJECT TRIP DISTRIBUTION AND ASSIGNMENT Figure 13 and Figure 14 show the existing and forecast directional distribution patterns for the project generated trips. The existing and project trip distribution patterns are based on review of existing volume data, surrounding land uses, and the local and regional roadway facilities in the project vicinity. The project-generated AM and PM peak hour intersection turning movement volumes are shown on Figure 15 and Figure 16. 23 Attachment D % In % Out Rate % In % Out Rate Church ITE 560 TSF 62% 38% 0.32 44% 56% 0.49 7.60 In Out Total In Out Total Church 8.480 TSF 2 1 3 2 2 4 64 Notes: (1) ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021);### = Land Use Code (2) TSF = Thousand Square Feet Table 4 Existing Trip Generation Trip Generation Rates Land Use Source1 Unit2 AM Peak Hour Daily PM Peak Hour Trips Generated Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Daily 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965824 Attachment D % In % Out Rate % In % Out Rate Multi-Family Housing (Low-Rise) ITE 220 DU 24% 76% 0.40 63% 37% 0.51 6.74 In Out Total In Out Total Multi-Family Housing (Low-Rise)33 DU 3 10 13 11 6 17 222 Notes: (1) ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code (2) DU = Dwelling Units Table 5 Project Trip Generation Trip Generation Rates Land Use Source1 Unit2 AM Peak Hour PM Peak Hour Daily Trips Generated Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Daily 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965825 Attachment D In Out Total In Out Total Existing Land Use1 2 1 3 2 2 4 64 Proposed Project2 3 10 13 11 6 17 222 Net New Trips +1 +9 +10 +9 +4 +13 +158 Notes: (1) See Table 4. (2) See Table 5. Table 6 Project Trip Generation Comparison Trips Generated Land Use AM Peak Hour PM Peak Hour Daily 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965826 Attachment D Figure 13Existing Trip Distribution7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658NSiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 10%5%5%5%5%5%5%40%10%35%30%20%5%10%60%25%10%15% 10%5%45%55%90%40%Percent To/From ProjectLegend10%27Attachment D Figure 14Project Trip Distribution7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658NSiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D25%25%50%30%25%5% 20%100%Percent To/From ProjectLegend10%80%28Attachment D Figure 15Project AM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)0 3 42Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)3 1 0 0 0 0 0010003Suva St (NS)/Guatemala Ave (EW)0 2 0 0 3 0 0000004Suva St (NS)/Paramount Blvd (EW)0 0 0 3 0 1 1000015Foster Bridge Blvd (NS)/Project Dwy (EW)3 0 0 1 270 0 2 1 00 00000029Attachment D Figure 16Project PM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)0 1 22Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)2 0 0 0 1 0 0030003Suva St (NS)/Guatemala Ave (EW)0 6 0 0 1 0 0000004Suva St (NS)/Paramount Blvd (EW)0 0 0 2 0 1 3000035Foster Bridge Blvd (NS)/Project Dwy (EW)10 0 0 2 130 0 6 4 00 00000030Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 31 19658 5. FUTURE VOLUME FORECASTS This section describes how future volume forecasts for each analysis scenario were developed. Forecast study area volumes are illustrated on figures contained in this section. OTHER DEVELOPMENT To account for trips generated by future development, trips generated by other development projects in the Cities of Downey, Bell Gardens, Pico, Rivera, Commerce, and Montebello were added to the study area as provided by each City Planning Department staff. Table 7 shows the trip generation summary for other development projects. Figure 17 shows the other development location map. Figure 18 and Figure 19 show the forecast AM and PM peak hour intersection turning movement volumes for trips generated by other developments. AMBIENT GROWTH To account for ambient growth on roadways, existing traffic volumes were increased by a growth rate of 0.2- percent per year over a two-year period for Cumulative [Opening Year (2025)] conditions; this equates to a total growth factor of approximately 1.004. The ambient growth rate was conservatively applied to all movements at the study intersections. ANALYSIS SCENARIO VOLUME FORECASTS Existing Plus Ambient Growth Plus Cumulative Existing Plus Ambient Growth Plus Cumulative volume forecasts were derived by adding the other development generated trips to Existing volumes with ambient growth. Existing Plus Ambient Growth Plus Cumulative AM and PM peak hour intersection turning movement volumes are shown on Figure 20 and Figure 21. Existing Plus Ambient Growth Plus Cumulative Plus Project Existing Plus Ambient Growth Plus Cumulative Plus Project volume forecasts were derived by adding project generated trips to Existing Plus Ambient Growth Plus Cumulative volumes. Existing Plus Ambient Growth Plus Cumulative Plus Project AM and PM peak hour intersection turning movement volumes are shown on Figure 22 and Figure 23. 31 Attachment D In Out Total In Out Total City of Downey Commercial ITE 821 59.500 TSF 64 39 103 151 157 308 4,017 - Pass-By (40% PM)-- -- -- -60 -63 -123 -123 Fast-Food Restaurant w/ Drive-Thru Window ITE 221 6.508 TSF 148 142 290 112 103 215 3,042 - Pass-By (50% AM, 55% PM)-74 -71 -145 -62 -57 -119 -264 Subtotal 138 110 248 141 140 281 6,672 City of Pico Rivera PR1 8101 Rosemead Blvd Office ITE 710 68.837 TSF 92 13 105 17 82 99 746 City of Commerce Existing Warehousing - Passenger Cars 29 13 41 9 37 45 653 - Trucks 7 12 19 16 3 19 276 Proposed Light Industriall/Warehousing [a] 296.166 TSF - Passenger Cars 97 15 112 16 87 103 746 - Trucks 1 1 2 4 3 7 140 Difference - Passenger Cars 69 3 71 8 51 58 94 - Trucks -6 -11 -17 -12 0 -12 -136 Subtotal 63 -9 55 -4 51 47 -42 293 114 408 154 273 427 7,376 Notes: (2) TSF = Thousand Square Feet Table 7 Other Development Trip Generation Map ID Land Use Source1 AM Peak Hour PM Peak Hour DailyAddress (1) ITE = Institute of Transportation Engineers Trip Generation Manual (11th Edition, 2021); ### = Land Use Code C1 7400 Slauson Ave3 [a] = 7400 Slauson Ave Focused Traffic Assessment (Urban Crossroads, January 4, 2023). Quantity2 7201 Firestone BlvdD1 Total 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965832 Attachment D Other DevelopmentOther Development Legend N ____________________________________________________________________________________________________________________________________________________________________________________________________ Figure 17 Other Development Locaon Map 7360 Foster Bridge Residenal Project Traffic And Circulaon Analysis 19658 MAIN STSite 5 33 Attachment D Figure 18Other DevelopmentAM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)0 0 02Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)0 0 0 0 3 0 0000003Suva St (NS)/Guatemala Ave (EW)0 0 0 0 3 0 0032004Suva St (NS)/Paramount Blvd (EW)0 0 2 8 0 0 01500805Foster Bridge Blvd (NS)/Project Dwy (EW)0 0 0 0 000 0 0 0 30 00000034Attachment D Figure 19Other DevelopmentPM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)0 0 02Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)0 2 0 0 1 0 0000003Suva St (NS)/Guatemala Ave (EW)2 2 2 0 1 0 0010004Suva St (NS)/Paramount Blvd (EW)0 0 0 2 0 0 09021565Foster Bridge Blvd (NS)/Project Dwy (EW)0 0 0 0 000 2 0 0 10 00000035Attachment D Figure 20Existing Plus Ambient Growth Plus CumulativeAM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)1 1 8 9 32Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)138 83 1 73 68 11010258161 1273513Suva St (NS)/Guatemala Ave (EW)12 194 4 97 305 1551062716 6201244Suva St (NS)/Paramount Blvd (EW)16 17 36 209 25 16810511409 1311121325Foster Bridge Blvd (NS)/Project Dwy (EW)0 179 190 0 002 219 215 2 2414 3041110436Attachment D Figure 21Existing Plus Ambient Growth Plus CumulativePM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)2 2 0 0 52Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)164 110 5 7 175 35 2388243136153Suva St (NS)/Guatemala Ave (EW)14 348 14 135 413 132 7536131426924Suva St (NS)/Paramount Blvd (EW)5 6 4 208 28 162 961146241612831835Foster Bridge Blvd (NS)/Project Dwy (EW)0 188 207 0 000 262 181 11 4283 002500537Attachment D Figure 22Existing Plus Ambient Growth Plus Cumulative Plus ProjectAM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)1 1 9 2 72Foster B r i d g e Blvd1Suva St (NS)/Scout Ave (EW)141 84 1 73 68 11010258162 1273513Suva St (NS)/Guatemala Ave (EW)12 196 4 97 308 1551062716 6201244Suva St (NS)/Paramount Blvd (EW)16 17 36 212 25 16910611409 1311121335Foster Bridge Blvd (NS)/Project Dwy (EW)3 179 190 1 272 219 217 3 2414 3041110638Attachment D Figure 23Existing Plus Ambient Growth Plus Cumulative Plus ProjectAM Peak Hour Intersection Turning Movement Volumes7360 Foster Bridge Residential ProjectTraffic And Circulation Analysis19658N1SiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 234Study IntersectionLegend#Project Driveway#5Suva St (NS)/Bluff Rd (EW)2Foster B r i d g e Blvd2 2 0 1 7 1Suva St (NS)/Scout Ave (EW)166 110 5 7 176 35 2388246136153Suva St (NS)/Guatemala Ave (EW)14 354 14 135 414 132 7536131426924Suva St (NS)/Paramount Blvd (EW)5 6 4 210 28 163 991146241612831865Foster Bridge Blvd (NS)/Project Dwy (EW)10 188 207 2 130 262 187 15 4283 002500539Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 40 19658 6. FUTURE OPERATIONAL ANALYSIS Detailed intersection Level of Service calculation worksheets for each of the following analysis scenarios are provided in Appendix D. EXISTING PLUS AMBIENT GROWTH PLUS CUMULATIVE Table 8 shows the roadway segment capacity analysis for Existing Plus Ambient Growth Plus Cumulative conditions. As shown in Table 8, the study roadway segments are forecast to operate within acceptable Levels of Service for Existing Plus Ambient Growth Plus Cumulative conditions, except for the following roadway segment that is forecast to potentially exceed capacity:  Paramount Boulevard, East of Suva Street Although this roadway segment is projected to operate at an unacceptable Level of Service, the intersection of Suva Street at Paramount Boulevard (Int. #4) is projected to operate within acceptable Levels of Service during the peak hours (see Table 9). Two through lanes along Paramount Boulevard are maintained through the intersection of Suva Street. Thus, since the roadway segment acts as a free-flowing corridor between points of conflict (intersections), and the point of conflict (Suva Street at Paramount Boulevard – Intersection # 4) is projected to operate at acceptable Levels of Service during the peak hours, improvements are not recommended along this roadway segment. Intersection Levels of Service for Existing Plus Ambient Growth Plus Cumulative are shown in Table 9. As shown in Table 9, the study intersections are forecast to operate within acceptable Levels of Service during the peak hours for Existing Plus Ambient Growth Plus Cumulative conditions; no intersection improvements are recommended. EXISTING PLUS AMBIENT GROWTH PLUS CUMULATIVE PLUS PROJECT Table 10 shows the roadway segment capacity analysis for Existing Plus Ambient Growth Plus Cumulative Plus Project conditions. As shown in Table 10, the study roadway segments are forecast to operate within acceptable Levels of Service for Existing Plus Ambient Growth Plus Cumulative Plus Project conditions, except for the following roadway segment that is forecast to potentially exceed capacity:  Paramount Boulevard, East of Suva Street Improvements are not recommended along this roadway segment even though the roadway segment due to acceptable peak hour operations at the adjacent points of conflict (Suva Street/Paramount Boulevard intersection) as previously described. In addition, the project is forecast to add a relatively negligible number of trips per day along this segment such that no appreciable change in the volume-to-capacity ratio is expected for Existing Plus Ambient Growth Plus Cumulative Plus Project conditions. Intersection Levels of Service for Existing Plus Ambient Growth Plus Cumulative Plus Project are shown in Table 11. As shown in Table 11, the study intersections are forecast to operate within acceptable Levels of Service during the peak hours for Existing Plus Ambient Growth Plus Cumulative Plus Project conditions; no intersection improvements are recommended. FUTURE TRAFFIC SIGNAL WARRANT ANALYSIS The unsignalized study intersection of Suva Street and Guatemala Avenue was evaluated for the potential need to install a traffic signal using the CA MUTCD peak hour traffic signal warrant graphs (Warrant 3). Peak hour traffic signal warrant worksheets are provided in Appendix E. 40 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 41 19658 For all future conditions evaluated, a traffic signal does not appear to be warranted at the intersection of Suva Street/Guatemala Avenue based on the CA MUTCD peak hour traffic signal warrant graphs (Warrant 3). 41 Attachment D Lanes Capacity2 Existing Existing Plus Ambient Growth Cumulative Existing Plus Ambient Growth Plus Cumulative Scout Ave to Bluff Road 2 15,000 6,354 6,379 22 6,401 0.43 Acceptable A Bluff Road to Guatemala Ave 2 15,000 11,972 12,020 22 12,042 0.80 Approaches Capacity D Scout Ave West of Suva St 4 36,000 7,036 7,064 0 7,064 0.20 Acceptable A East of Suva St 4 36,000 35,660 35,803 480 36,283 1.01 Potentially Exceeds Capacity F West of Suva St 4 36,000 33,234 33,367 408 33,775 0.94 Approaches Capacity E Foster Bridge Blvd North of Bluff Road 2 15,000 4,094 4,110 0 4,110 0.27 Acceptable A Notes: (1) See Table 1. (2) The County of Los Angeles roadway maximum capacity at Level of Service "E" (see Table 1). (3) ADT = Average Daily Traffic Volume. (4) Ambient Growth Rate of 0.2% per year. (5) V/C = Volume to Capacity Ratio. (6) LOS = Level of Service (Based on the Level of Service standards on Table 1). Table 8 Existing Plus Ambient Growth Plus Cumulative Roadway Segment Daily Capacity Analysis Classification Roadway Segment Standards1 Roadway Segment LOS6Capacity Threshold Collector Suva St Collector Collector V/C5 ADT3 Ave Paramount Blvd Major Arterial Major Arterial 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965842 Attachment D Delay2 LOS3 Delay2 LOS3 1. Suva St at Scout Ave AWS 17.1 C 11.7 B 2. Suva St at Bluff Rd/Foster Bridge Blvd TS 16.0 B 12.8 B 3. Suva St at Guatemala Ave AWS 20.3 E 29.1 D 4. Suva St at Paramount Blvd TS 20.9 C 38.6 D Notes: (1) AWS = All Way Stop; TS = Traffic Signal (2) (3) LOS = Level of Service ID Study Intersection Traffic Control1 Delay is shown in seconds/vehicle. For intersections with traffic signal or all way stop control, overall average intersection delay and LOS are shown. Table 9 Existing Plus Ambient Growth Plus Cumulative Intersection Level of Service AM Peak Hour PM Peak Hour 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965843 Attachment D Lanes Capacity2 Existing Plus Ambient Growth Plus Cumulative4 Project Existing Plus Ambient Growth Plus Cumulative Plus Project Scout Ave to Bluff Road 2 15,000 6,401 52 6,453 0.43 Acceptable A Bluff Road to Guatemala Ave 2 15,000 12,042 73 12,115 0.81 Approaches Capacity D Scout Ave West of Suva St 4 36,000 7,064 50 7,114 0.20 Acceptable A East of Suva St 4 36,000 36,283 50 36,333 1.01 Potentially Exceeds Capacity F West of Suva St 4 36,000 33,775 51 33,826 0.94 Approaches Capacity E Foster Bridge Blvd North of Bluff Road 2 15,000 4,110 151 4,261 0.28 Acceptable A Notes: (1) See Table 1. (2) The County of Los Angeles roadway maximum capacity at Level of Service "E" (see Table 1). (3) ADT = Average Daily Traffic Volume. (4) See Table 8. (5) V/C = Volume to Capacity Ratio. (6) LOS = Level of Service (Based on the Level of Service standards on Table 1). Classification Table 10 Existing Plus Ambient Growth Plus Cumulative Plus Project Roadway Segment Daily Capacity Analysis Capacity Threshold Paramount Blvd Major Arterial Major Arterial Collector Suva St Collector Collector Ave SegmentRoadway Roadway Segment Standards1 ADT3 V/C5 LOS6 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965844 Attachment D Delay2 LOS3 Delay2 LOS3 1. Suva St at Scout Ave AWS 17.4 C 11.8 B 2. Suva St at Bluff Rd/Foster Bridge Blvd TS 16.1 B 12.9 B 3. Suva St at Guatemala Ave AWS 20.7 E 29.6 D 4. Suva St at Paramount Blvd TS 21.0 C 39.7 D 5. Foster Bridge Blvd at Project Dwy CSS 9.7 C 9.9 A Notes: (1) AWS = All Way Stop; TS = Traffic Signal; CSS = Cross Street Stop (2) (3) LOS = Level of Service Delay is shown in seconds/vehicle. For intersections with traffic signal or all way stop control, overall average intersection delay and LOS are shown. For intersections with cross street stop control, Level of Service is based on average delay of the worst minor street approach or major street left turn movement. Table 11 Existing Plus Ambient Growth Plus Cumulative Plus Project Intersection Level of Service Traffic Control1 AM Peak Hour PM Peak Hour ID Study Intersection 7360 Foster Bridge Residential Project Traffic and Circulation Analysis 1965845 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 46 19658 7. SITE ACCESS AND CIRCULATION This section includes a description of project improvements necessary to provide site access and an evaluation of site access and circulation. PROJECT DESIGN FEATURES  Construct the Foster Bridge Boulevard (NS) at Project Driveway (EW) (#5) to provide one inbound lane and one outbound lane with eastbound stop-control. This analysis also assumes the project shall comply with the following conditions as part of the City of Downey standard development review process:  A construction work site traffic control plan shall comply with State standards set forth in the California Manual of Uniform Traffic Control Devices and shall be submitted to the City for review and approval prior to the issuance of a grading permit or start of construction. The plan shall identify any roadway, sidewalk, bike route, or bus stop closures and detours as well as haul routes and hours of operation. All construction-related trips shall be restricted to off-peak hours to the extent possible.  All on-site and off-site roadway design, traffic signing and striping, and traffic control improvements relating to the proposed project shall be constructed in accordance with applicable State/Federal engineering standards and to the satisfaction of the City of Downey.  Site-adjacent roadways shall be constructed or repaired at their ultimate half-section width, including landscaping and parkway improvements in conjunction with development, or as otherwise required by the City of Downey.  Adequate off-street parking shall be provided to the satisfaction of City of Downey.  Adequate emergency vehicle access shall be provided to the satisfaction of the Downey Fire Department.  The final grading, landscaping, and street improvement plans shall demonstrate that sight distance requirements are met in accordance with applicable City of Downey sight distance standards. 46 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 47 19658 8. CONGESTION MANAGEMENT PROGRAM This section provides analysis of the project impacts at County facilities in accordance with typical Los Angeles County Congestion Management Program (CMP) requirements. CRITERIA FOR REQUIRING A TRAFFIC IMPACT ANALYSIS FOR CMP The Los Angeles County 2010 CMP provides the following thresholds for requiring a CMP-compliant traffic impact analysis:  All CMP arterial monitoring intersections, including monitored freeway on or off-ramp intersections, where the proposed project will add 50 or more trips during either the AM or PM weekday peak hours (of adjacent street traffic)  If CMP arterial segments are being analyzed rather than intersections, the study area must include all segments where the proposed project will add 50 or more peak hour trips (total of both directions).  Mainline freeway monitoring locations were the project will add 150 or more trips, in either direction, during either the AM or PM weekday peak hours. As previously shown in Table 6, the proposed project is forecast to generate approximately 10 new AM peak hour trips and 13 new PM peak hour trips, which are distributed to/from the project site. The project will not add 50 or more peak hour trips to CMP intersections or 150 or more peak hour trips to the freeway network since the project generates less than this threshold in total during each peak hour. Therefore, the proposed project would not result in a CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes and no further CMP traffic analysis is warranted. CMP TRANSIT IMPACT REVIEW The Los Angeles County Metropolitan Transportation Authority 2010 Congestion Management Program, Appendix D - Guidelines for CMP Transportation Impact Analysis, utilizes a conversion factor based on the daily and AM and PM peak hour trip generation to provide for a transit analysis. The conversion is as follows:  Multiply the total trips generated by 1.4 to convert vehicle trips to person trips;  For each time period, multiply the result by one of the following factors: 3.5% of Total Person Trips Generated for most cases, except: 10% primarily Residential within 1/4 mile of a CMP transit center 15% primarily Commercial within 1/4 mile of a CMP transit center 7% primarily Residential within 1/4 mile of a CMP multi-modal transportation center 9% primarily Commercial within 1/4 mile of a CMP multi-modal transportation center 5% primarily Residential within 1/4 mile of a CMP transit corridor 7% primarily Commercial within 1/4 mile of a CMP transit corridor 0% if no fixed route transit services operate within one mile of the project Accordingly, the proposed project-generated transit trips are calculated as follows:  Daily: ((158 trips x 1.4) x 0.035) ≈ 8  Morning Peak Hour: ((10 trips x 1.4) x 0.035) ≈ 1  Evening Peak Hour: ((13 trips x 1.4) x 0.035) ≈ 1 47 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 48 19658 The proposed project is forecast to generate approximately one (1) transit trip during the AM and PM peak hour. Based on the existing transit services available in the project vicinity and the relatively low transit trip generation, the proposed project is forecast to have a nominal impact on transit demand. 48 Attachment D 7360 Foster Bridge Residential Project Traffic And Circulation Analysis (Revised) 49 19658 9. CONCLUSIONS This section summarizes the findings and mitigation measures (if any) identified in previous sections of this study. PROJECT TRIP GENERATION The existing land uses currently generate approximately 64 daily trips, including 3 trips during the AM peak hour and 4 trips during the PM peak hour. The proposed project is forecast to generate approximately 222 daily trips, including 13 trips during the AM peak hour and 17 trips during the PM peak hour. The proposed project is forecast to generate approximately 158 additional daily trips compared to existing project site uses, including 10 additional trips during the AM peak hour and 13 additional trips during the PM peak hour. FORECAST LEVELS OF SERVICE For Existing Plus Ambient Growth Plus Cumulative traffic conditions, the study roadway segments are projected to operate at acceptable Levels of Service, except for the following roadway segment that is projected to operate at unacceptable Levels of Service, without improvements:  Paramount Boulevard, East of Suva Street Although this roadway segment is projected to operate at an unacceptable Level of Service, the intersection of Suva Street at Paramount Boulevard (Int. #4) is projected to operate within acceptable Levels of Service during the peak hours (see Table 9). Two through lanes along Paramount Boulevard are maintained through the intersection of Suva Street. Thus, since the roadway segment acts as a free-flowing corridor between points of conflict (intersections), and the point of conflict (Suva Street at Paramount Boulevard – Intersection # 4) is projected to operate at acceptable Levels of Service during the peak hours, improvements are not recommended along this roadway segment. In addition, the project is forecast to add a relatively negligible number of trips per day along this segment such that no appreciable change in the volume-to-capacity ratio is expected for Existing Plus Ambient Growth Plus Cumulative Plus Project conditions. The study intersections are forecast to operate within acceptable Levels of Service during the peak hours for Existing Plus Ambient Growth Plus Cumulative and Existing Plus Ambient Growth Plus Cumulative Plus Project conditions; no intersection improvements are recommended. CONGESTION MANAGEMENT PROGRAM The proposed project would result in no operational CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes and no further CMP analysis is warranted. A transit impact review was conducted for compliance with the CMP requirements and found that the proposed project is forecast to have a nominal impact on transit demand. 49 Attachment D APPENDICES Appendix A Glossary Appendix B Scoping Agreement Appendix C Volume Count Worksheets Appendix D Level of Service Worksheets Appendix E Traffic Signal Warrant Graphs Apx-1 Attachment D APPENDIX A GLOSSARY Apx-2 Attachment D ACRONYMS AC Acres ADT Average Daily Traffic Caltrans California Department of Transportation DU Dwelling Unit ICU Intersection Capacity Utilization GFA Gross Floor Area LOS Level of Service PCE Passenger Car Equivalent SP Service Population TSF Thousand Square Feet V/C Volume/Capacity VMT Vehicle Miles Traveled TERMS ACTUATED SIGNAL CONTROL: A type of traffic signal control in which display of each phase depends on whether the corresponding phase detector has registered a service call or the phase is on recall. ACTUATION: Detection of a roadway user that is forwarded to the signal controller. AVERAGE DAILY TRAFFIC: The average 24-hour volume for a stated period divided by the number of days in that period. For example, Annual Average Daily Traffic is the total volume during a year divided by 365 days. BANDWIDTH: The number of seconds of green time available for through traffic in a signal progression. BOTTLENECK: A point of constriction along a roadway that limits the amount of traffic that can proceed downstream from its location. CALL: An indication within a signal controller that a particular phase is waiting for service, either through actuation from a roadway user or phase recall. CAPACITY: The maximum number of vehicles that can be reasonably expected to pass through a roadway facility during a specified period. CHANNELIZATION: The separation of conflicting traffic movements by use of pavement markings, raised curbs, or other suitable means to facilitate free flow movement. CLEARANCE INTERVAL: Equal to the yellow plus all-red time, if any, when a traffic signal changes between phases (i.e., the amount of time between the end of a green light from one movement to the beginning of a green light for the next). COORDINATED SIGNAL CONTROL: A type of traffic signal control in which non-coordinated phases associated with minor movements are constrained such that the coordinated phases are served at a specific time during the signal cycle, thus maintaining the efficient progression of traffic flow along the major roadway. CONTROL DELAY: The portion of delay attributed to the intersection traffic control (such as a traffic signal or stop sign). It includes initial deceleration, queue move-up time, stopped delay, and final acceleration delay. CORDON: An imaginary boundary line around or across a study area across which vehicles, persons, or other information can be collected for survey and analytical purposes. Apx-3 Attachment D CORNER SIGHT DISTANCE: The minimum sight distance required by the driver of a vehicle to cross or enter the lanes of the major roadway without requiring approaching traffic traveling at a given speed to radically alter their speed or trajectory. CYCLE: A complete sequence of signal indications for all phases. CYCLE LENGTH: The total time for a traffic signal to complete one full cycle. DAILY CAPACITY: A theoretical value representing the daily traffic volume that will typically result in a peak hour volume equal to the capacity of the roadway. DELAY: The total additional travel time experienced by a roadway user (driver, passenger, bicyclist, or pedestrian) beyond that required to travel at a desired speed. DENSITY: The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile. DETECTOR: A device used to count or determine the presence of a roadway user. DESIGN SPEED: A speed used for purposes of designing horizontal and vertical alignments of a highway. DIRECTIONAL SPLIT: The percent of two-way traffic traveling in a specified direction. DIVERSION: The rerouting of traffic from a normal path of travel between two points, such as to avoid congestion or perform a secondary trip. FREE FLOW: Traffic flow that is unaffected by a traffic control and/or or upstream or downstream conditions. GAP: Time or distance between two vehicles measured from rear bumper of the front vehicle to front bumper of the second vehicle. GAP ACCEPTANCE: The method by which a driver accepts an available gap in traffic to enter or cross the road. HEADWAY: Time or distance between two successive vehicles measured from same point on both vehicles (i.e., front bumper to front bumper). LEVEL OF SERVICE: A grading scale of quantitative performance measures representing the quality of service of a transportation facility or service from an average traveler’s perspective. LOOP DETECTOR: A vehicle detector consisting of a loop of wire embedded in the roadway, energized by alternating current and producing an output circuit closure when passed over by a vehicle. MULTI-MODAL: More than one mode, such as automobile, transit, bicycle, and pedestrian. OFFSET: The time interval between the beginning of a traffic signal cycle at one intersection and the beginning of signal cycle an adjacent intersection. PLATOON: A set of vehicles traveling at similar speed and moving as a general group with clear separation between other vehicles ahead and behind. PASSENGER CAR EQUIVALENT: A metric used to assess the impact of larger vehicles, such as trucks, recreational vehicles, and buses, by converting the traffic volume of larger vehicles to an equivalent number of passenger cars. Apx-4 Attachment D PEDESTRIAN CLEARANCE INTERVAL: Also known as the “Flashing Don’t Walk” interval, it signals the end of pedestrian entry into the crosswalk following the “Walk” indication and provides time for pedestrians who have already entered the crosswalk to finishing crossing. PEAK HOUR: The hour within a day in which the maximum volume occurs. PEAK HOUR FACTOR: The peak hour volume divided by the four times the peak 15-minute flow rate. PHASE: In traffic signals, the green, yellow, and red clearance intervals assigned to a specified traffic movement. PRETIMED SIGNAL: A traffic signal operation in which the cycle length, phasing sequence, and phasing times are predetermined and fixed, regardless of actual demand for any given traffic movement. Also known as a fixed time signal. PROGRESSION: The coordinated movement of vehicles through signalized intersections along a corridor. QUEUE: The number of vehicles waiting at a service area such as a traffic signal, stop sign, or access gate. QUEUE LENGTH: The length of vehicle queue, typically expressed in feet, waiting at a service area such as a traffic signal, stop sign, or access gate. RECALL: A signal phasing operation in which a specified phase places a call to the signal controller each time a conflicting phase is served, thus ensuring the specified phase will be serviced again. SEMI-ACTUATED CONTROL: A type of traffic signal control in which only the minor movements are provided detection. SIGHT DISTANCE: The continuous length of roadway visible to a driver or roadway user. STACKING DISTANCE: The length of area available behind a service area, such as a traffic signal or gate, for vehicle queuing to occur. STOPPING SIGHT DISTANCE: The minimum distance required by the driver of a vehicle traveling at a given speed to bring the vehicle to a stop after an object on the road becomes visible, including reaction and response time. TRIP OR TRIP END: The one-directional movement of a person or vehicle. Every trip has an origin and a destination at its respective ends (i.e., trip ends). In terms of site trip generation, the same vehicle entering and exiting a site generates two trips: one inbound trip and one outbound trip. TRIP GENERATION RATE: The rate at which a land use generates trips per the specified land use variable, such per dwelling unit or per thousand square feet. TRUCK: A heavy motor vehicle generally used for transporting goods. VEHICLE MILES TRAVELED: A measure of the amount and distance of automobile travel essentially calculated as the sum of each trip times the trip length. Apx-5 Attachment D APPENDIX B SCOPING AGREEMENT Apx-6 Attachment D transportation ■noise ■ air quality | GANDDINI GROUP 555 Parkcenter Drive, Suite 225, Santa Ana, California 92705 714 795 3100 | ganddini.com MEMORANDUM OF UNDERSTANDING TO: CITY OF DOWNEY FROM:Bryan Crawford, Senior Transportation Planner | GANDDINI GROUP, INC. DATE: August 9, 2023 SUBJECT:7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement The purpose of this traffic study scoping document is to outline the proposed traffic analysis parameters and assumptions for review/concurrence by City of Downey staff. PROJECT DESCRIPTION Figure 1 shows the project location map. The project site is located at 7360 Foster Bridge Boulevard in the City of Downey. Figure 2 illustrates the project site plan. The 1.3-acre project site is currently developed with an 8,480 square foot church which is proposed to be demolished. The proposed project involves construction of a new multifamily residential development with a total of 33 dwelling units. The proposed project is anticipated to be constructed and fully operational by year 2025. The project involves a Zone Change from R-1 to R-3 and General Plan Amendment (GPA) to change the General Plan land use designation from LDR (Low Density Residential) to MDR (Medium Density Residential). The project site is proposed to provide one full access driveway on Foster Bridge Boulevard and will have gated entry. An emergency vehicle access only driveway is proposed on Suva Street. PROJECT TRIP GENERATION Table 1 and Table 2 show the existing land uses and project trip generation for potential church and residential uses based upon trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021). Based on review of the ITE land use descriptions, trip generation rates for Church (ITE Land Use Code 560) and Multi-Family Housing (Low-Rise) (ITE Land Use Code 220) were determined to adequately represent the existing land use and proposed project and were used for calculating the project trip generation forecasts. The existing land use and project trip generation forecasts were determined by multiplying the trip generation rates by the land use quantities. As shown in Table 1, the existing land uses currently generate approximately 64 daily vehicle trips, including 3 vehicle trips during the AM peak hour and 4 vehicle trips during the PM peak hour. As shown in Table 2, the proposed project is forecast to generate approximately 222 daily vehicle trips, including 13 vehicle trips during the AM peak hour and 17 vehicle trips during the PM peak hour. Apx-7 Attachment D 7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement August 9, 2023 7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement 2 19370 As shown in Table 3, the proposed project is forecast to generate approximately 158 additional daily vehicle trips compared to existing project site uses, including 10 additional vehicle trips during the AM peak hour and 13 additional vehicle trips during the PM peak hour. PROJECT TRIP DISTRIBUTION Figure 3 to Figure 5 illustrate the forecast outbound and inbound directional distribution patterns of project- generated trips. STUDY AREA Intersections identified for analysis typically include signalized intersections at which a project is forecast to contribute 50 or more trips during the AM or PM peak hours. The proposed project does not generate 50 or more trips during the AM or PM peak hour and would not meet this threshold for intersections in the neighboring City of Bell Gardens. The study area is proposed to consist of the following five (5) study intersections, even if the project may not contribute 50 or more trips during either peak hour. Study Intersections (Figure 1) 1. Suva Street (NS) at Scout Avenue (EW) 2. Suva Street (NS) at Bluff Road/Foster Bridge Boulevard (EW) 3. Suva Street (NS) at Guatemala Avenue (EW) 4. Suva Street (NS) at Paramount Boulevard (EW) 5. Foster Bridge Blvd (NS) at Project Driveway (EW) Study Roadway Segments 1. Suva Street, between Scout Avenue and Bluff Road 2. Suva Street, between Bluff Road and Guatemala Avenue 3. Scout Avenue, west of Suva Street 4. Paramount Boulevard, east of Suva Street 5. Paramount Boulevard, west of Suva Street 6. Foster Bridge Boulevard, north of Bluff Road TRAFFIC COUNTS New intersection turning movement counts will be obtained at the study intersections during the AM peak period (7:00 AM – 9:00 AM) and PM peak period (4:00 PM – 6:00 PM) on a typical weekday (Tuesday, Wednesday, or Thursday) while schools are in session. ANALYSIS SCENARIOS The traffic study shall evaluate the following analysis scenarios for weekday AM and PM peak hour conditions: Existing [2023] Existing Plus Ambient Growth Plus Cumulative [2025] Existing Plus Ambient Growth Plus Cumulative Plus Project [2025] Apx-8 Attachment D 7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement August 9, 2023 7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement 3 19370 ANALYSIS METHODOLOGY To assess the performance of an intersection, the City of Downey uses the intersection delay method based on procedures contained in the Highway Capacity Manual (Transportation Research Board, 7th Edition). The methodology considers the traffic volume and distribution of movements, traffic composition, geometric characteristics, and signalization details to calculate the average control delay per vehicle and corresponding Level of Service (LOS). Control delay is defined as the portion of delay attributed to the intersection traffic control (such as a traffic signal or stop sign) and includes initial deceleration, queue move-up time, stopped delay, and final acceleration delay. The intersection control delay is then correlated to Level of Service based on the following thresholds: Level of Service Intersection Control Delay (Seconds / Vehicle) Signalized Intersection Unsignalized Intersection A ≤ 10.0 ≤ 10.0 B > 10.0 to ≤ 20.0 > 10.0 to ≤ 15.0 C > 20.0 to ≤ 35.0 > 15.0 to ≤ 25.0 D > 35.0 to ≤ 55.0 > 25.0 to ≤ 35.0 E > 55.0 to ≤ 80.0 > 35.0 to ≤ 50.0 F > 80.0 > 50.0 Source: Transportation Research Board, Highway Capacity Manual (7th Edition). Level of Service is used to qualitatively describe the performance of a roadway facility, ranging from Level of Service A (free-flow conditions) to Level of Service F (extreme congestion and system failure). At intersections with traffic signal or all way stop control, Level of Service is determined by the average control delay for the overall intersection. At intersections with cross street stop control (i.e., one- or two-way stop control), Level of Service is determined by the average control delay for the worst individual approach. The analysis will be performed in accordance with the Los Angeles County Public Works Transportation Impact Analysis Guidelines, July 23, 2020. Intersection Level of Service analysis shall be performed using the Vistro software. PERFORMANCE STANDARDS City of Downey The City of Downey General Plan Circulation has established LOS D as the minimum acceptable Level of Service at intersections and roadway segments. OPERATIONAL THRESHOLDS If a project is forecast to result in a substantial operational deficiency, recommended corrective measures will be identified that would reduce the project’s effect to a level that does not exceed the specified deficiency criteria. Corrective measures can be in many forms, including the construction of physical improvements (e.g., addition of travel lanes, traffic control modifications, etc.) or the implementation of transportation demand management measures. Apx-9 Attachment D 7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement August 9, 2023 7360 Foster Bridge Residential Project Traffic and Circulation Analysis Scoping Agreement 4 19370 FORECASTING METHODOLOGY Ambient Growth Rate To account for area-wide ambient growth, the Opening Year Conditions will include a 0.2% annual growth for 2 years (total growth factor = 1.004) over the 2023 base volumes. The ambient growth rate is based on Exhibit D-1 (RSA 21) from Appendix D of the Congestion Management Program for Los Angeles County. Other Cumulative Projects A list of pending and approved cumulative development projects will be obtained from the Cities of Downey, Pico Rivera, Commerce, Montebello, and Bell Gardens staff. This list will be narrowed down to include projects within a 1.5-mile radius of the project site. Trip forecasts for other development projects within the project study area will be determined based on the Institute of Transportation Engineers (ITE), Trip Generation Manual, 11th Edition, 2021 and will be added to existing roadway volumes for the Opening Year scenario. SITE ACCESS AND ON-SITE CIRCULATION A review of site access and on-site circulation needs will be provided, including site access traffic controls, lane configurations, and recommendations will be provided to maintain adequate circulation. CONGESTION MANAGEMENT PROGRAM The Los Angeles County 2010 CMP provides the following thresholds for requiring a CMP-compliant traffic impact analysis: All CMP arterial monitoring intersections, including monitored freeway on or off-ramp intersections, where the proposed project will add 50 or more trips during either the AM or PM weekday peak hours (of adjacent street traffic) If CMP arterial segments are being analyzed rather than intersections, the study area must include all segments where the proposed project will add 50 or more peak hour trips (total of both directions). Mainline freeway monitoring locations were the project will add 150 or more trips, in either direction, during either the AM or PM weekday peak hours. The study area does not include any CMP monitoring intersections, does not contribute 50 or more trips during either the AM or PM weekday peak hours, and does not contribute 150 or more peak hour trips to a mainline freeway monitoring location. Therefore, the proposed project would not result in a CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes. VEHICLES MILES TRAVELED (VMT) ANALYSIS A separate VMT screening assessment will be performed for the project. CONCLUSION We appreciate the opportunity to provide this scoping document for your review. Should you have any questions or comments regarding the proposed scope, please contact Bryan Crawford at (714) 795-3100 x 104 or bryan@ganddini.com. Apx-10 Attachment D % In % Out Rate % In % Out Rate Church ITE 560 TSF 62% 38% 0.32 44% 56% 0.49 7.60 In Out Total In Out Total Church 8.480 TSF 2 1 3 2 2 4 64 Notes: (1) ITE = Institute of Transportation Engineers, Trip Generation Manual, 11th Edition, 2021; ### = Land Use Code (2) TSF = Thousand Square Feet Trips Generated Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Daily AM Peak Hour PM Peak Hour Daily Table 1 Existing Trip Generation Trip Generation Rates Land Use Source1 Unit2 7360 Foster Bridge Residential Project Scoping Agreement 19658 Apx-11 Attachment D % In % Out Rate % In % Out Rate Multi-Family Housing (Low-Rise) ITE 220 DU 24% 76% 0.40 63% 37% 0.51 6.74 In Out Total In Out Total Multi-Family Housing (Low-Rise)33 DU 3 10 13 11 6 17 222 Table 2 Project Trip Generation Trip Generation Rates Land Use Source1 Unit2 AM Peak Hour PM Peak Hour Daily Trips Generated Land Use Quantity Unit2 AM Peak Hour PM Peak Hour Daily 7360 Foster Bridge Residential Project Scoping Agreement 19658 Apx-12 Attachment D In Out Total In Out Total Existing Land Use1 2 1 3 2 2 4 64 Proposed Project2 3 10 13 11 6 17 222 Net New Trips +1 +9 +10 +9 +4 +13 +158 Notes: (1) See Table 1 (2) See Table 2 Trips Generated Land Use AM Peak Hour PM Peak Hour Daily Table 3 Project Trip Generation Comparison 7360 Foster Bridge Residential Project Scoping Agreement 19658 Apx-13 Attachment D Figure 1Project Location Map7360 Foster Bridge Residential ProjectScoping Agreement19658N1SiteSCOUT AVE FOSTER BRIDG E BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B LV D 234Study IntersectionLegend#Project Driveway#5Apx-14Attachment D Figure 2 Site Plan 7360 Foster Bridge Residential Project Scoping Agreement 19658 N Apx-15 Attachment D Figure 3Existing Trip Distribution7360 Foster Bridge Residential ProjectScoping Agreement19658NSiteSCOUT AVE FOSTER BRIDGE BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B L V D 10%5%5%5%5%5%5%40%10%35%30%20%5%10%60%25%10%15% 10%5%45%55%90%40%Percent To/From ProjectLegend10%Apx-16Attachment D Figure 4Project Trip Distribution7360 Foster Bridge Residential ProjectScoping Agreement19658NSiteSCOUT AVE FOSTER BRIDG E BLVDBLUFF RDGUATEMALA AVESUVA STP A R A M O U N T B LV D25%25%50%30%25%5% 20%100%Percent To/From ProjectLegend10%80%Apx-17Attachment D To: Edwin Norris <enorris@downeyca.org>, Kent Norton <knorton@migcom.com>, Bob Prasse <bprasse@migcom.com>, "Alfonso S. Hernandez" <ashernandez@downeyca.org> Edwin, Attached is the revised scoping agreement based on our meeting earlier today for your review. [Quoted text hidden] 19658sco_2023-0809.pdf 767K Bryan Crawford <bryan@ganddini.com>Fri, Aug 18, 2023 at 6:02 PM To: Edwin Norris <enorris@downeyca.org>, Kent Norton <knorton@migcom.com>, Bob Prasse <bprasse@migcom.com>, "Alfonso S. Hernandez" <ashernandez@downeyca.org> Edwin, Can I get a status update on the review and approval of the scoping agreement? Specifically the study intersections and roadway segments. Thanks. [Quoted text hidden] Edwin Norris <enorris@downeyca.org>Mon, Aug 21, 2023 at 11:43 AM To: Bryan Crawford <bryan@ganddini.com>, Kent Norton <knorton@migcom.com>, Bob Prasse <bprasse@migcom.com>, "Alfonso S. Hernandez" <ashernandez@downeyca.org> I’ll have a response to you this morning. My apologies for the delay. [Quoted text hidden] image001.jpg 12K Edwin Norris <enorris@downeyca.org>Mon, Aug 21, 2023 at 3:59 PM To: Bryan Crawford <bryan@ganddini.com>, Kent Norton <knorton@migcom.com>, Bob Prasse <bprasse@migcom.com>, "Alfonso S. Hernandez" <ashernandez@downeyca.org> Good afternoon, Bryan – I reviewed the scoping document and my only comment is that the City actually follows the ICU intersection analysis methodology per the LA County CMP guidelines vs. the HCM delay methodology as you indicate on pg. 3 of the document. Otherwise, the document looks fine. Thanks again for the opportunity to review. Gmail - Downey-Foster Bridge Rd Residential Project No 17005.00 https://mail.google.com/mail/u/0/?ik=62aeb8b5c5&view=pt&search=a... 7 of 9 10/2/2023, 10:38 PM Apx-18 Attachment D Bryan Crawford <bryan@ganddini.com>Mon, Aug 21, 2023 at 4:06 PM To: Edwin Norris <enorris@downeyca.org> Cc: Kent Norton <knorton@migcom.com>, Bob Prasse <bprasse@migcom.com>, "Alfonso S. Hernandez" <ashernandez@downeyca.org> Edwin, The County of Los Angeles no longer uses the ICU methodology as they have converted over to the HCM Methodology for LOS analysis. Per the Los Angeles County Public Works Transportation Impact Analysis Guidelines (July 23, 2020), Section 4.1.4.1 - Level of Service and Queueing Methodology: "Intersection level of service (LOS) and queueing methodologies from the latest edition of the Transportation Research Board Highway Capacity Manual (HCM) should be used to evaluate the operation of the project driveways and nearby intersections. For individual isolated intersection analysis, the use of software packages such as Synchro, Vistro, or HCS that implement the HCM methodologies is acceptable." [Quoted text hidden] Edwin Norris <enorris@downeyca.org>Mon, Aug 21, 2023 at 4:59 PM To: Bryan Crawford <bryan@ganddini.com> Cc: Kent Norton <knorton@migcom.com>, Bob Prasse <bprasse@migcom.com>, "Alfonso S. Hernandez" <ashernandez@downeyca.org> Hi Bryan – understood. Since that is the case, please proceed with the HCM methodology as originally proposed. Thanks. [Quoted text hidden] image001.jpg 12K Gmail - Downey-Foster Bridge Rd Residential Project No 17005.00 https://mail.google.com/mail/u/0/?ik=62aeb8b5c5&view=pt&search=a... 9 of 9 10/2/2023, 10:38 PM Apx-19 Attachment D APPENDIX C VOLUME COUNT WORKSHEETS Apx-20 Attachment D CITY: Downey PROJECT: AM Period EB WB PM Period EB WB 0:00 0 9 12:00 40 36 0:15 6 3 12:15 43 28 0:30 1 2 12:30 34 35 0:45 1 8 3 17 25 12:45 31 148 36 135 283 1:00 2 5 13:00 37 38 1:15 2 4 13:15 45 37 1:30 2 1 13:30 49 27 1:45 2 8 7 17 25 13:45 50 181 29 131 312 2:00 7 5 14:00 52 37 2:15 6 4 14:15 54 30 2:30 7 1 14:30 84 53 2:45 5 25 2 12 37 14:45 84 274 66 186 460 3:00 4 5 15:00 94 70 3:15 0 3 15:15 83 46 3:30 3 7 15:30 80 62 3:45 4 11 4 19 30 15:45 86 343 60 238 581 4:00 7 12 16:00 78 71 4:15 8 3 16:15 96 63 4:30 9 10 16:30 115 76 4:45 20 44 24 49 93 16:45 106 395 71 281 676 5:00 10 15 17:00 104 74 5:15 27 17 17:15 103 55 5:30 19 24 17:30 96 68 5:45 29 85 33 89 174 17:45 106 409 68 265 674 6:00 13 17 18:00 111 42 6:15 20 20 18:15 83 56 6:30 22 32 18:30 74 54 6:45 32 87 31 100 187 18:45 59 327 39 191 518 7:00 26 47 19:00 56 50 7:15 53 49 19:15 36 38 7:30 69 59 19:30 38 37 7:45 61 209 69 224 433 19:45 29 159 23 148 307 8:00 54 44 20:00 39 25 8:15 35 41 20:15 29 10 8:30 34 40 20:30 26 9 8:45 33 156 35 160 316 20:45 23 117 11 55 172 9:00 30 29 21:00 21 23 9:15 35 26 21:15 21 29 9:30 23 18 21:30 23 21 9:45 18 106 27 100 206 21:45 13 78 15 88 166 10:00 30 40 22:00 14 16 10:15 36 25 22:15 8 10 10:30 34 37 22:30 10 17 10:45 30 130 28 130 260 22:45 2 34 6 49 83 11:00 29 32 23:00 6 9 11:15 33 27 23:15 10 14 11:30 31 42 23:30 10 11 11:45 42 135 33 134 269 23:45 3 29 4 38 67 Total Vol.1004 1051 2055 2494 1805 4299 EB WB Combined 3498 2856 6354 Split %48.9% 51.1%32.3%58.0% 42.0%67.7% Peak Hour 7:15 7:00 7:15 16:30 16:15 16:15 Volume 237 224 458 428 284 705 P.H.F.0.86 0.81 0.88 0.93 0.93 0.92 Thursday, August 24, 2023 SC4157 ADT2 Suva east of Scout.Prepared by AimTD LLC tel. 714 253 7888 Daily Totals AM PM cs@aimtd.com Tell. 714 253 7888 Apx-21 Attachment D CITY: Downey PROJECT: AM Period EB WB PM Period EB WB 0:00 5 15 12:00 67 68 0:15 6 8 12:15 79 61 0:30 3 6 12:30 78 67 0:45 1 15 9 38 53 12:45 78 302 76 272 574 1:00 2 7 13:00 67 68 1:15 4 5 13:15 79 87 1:30 2 8 13:30 83 61 1:45 2 10 9 29 39 13:45 103 332 64 280 612 2:00 6 7 14:00 107 73 2:15 6 6 14:15 118 65 2:30 8 2 14:30 154 97 2:45 6 26 7 22 48 14:45 132 511 128 363 874 3:00 5 4 15:00 151 122 3:15 1 5 15:15 121 106 3:30 8 10 15:30 136 117 3:45 7 21 5 24 45 15:45 137 545 136 481 1026 4:00 10 12 16:00 142 132 4:15 12 4 16:15 157 142 4:30 17 12 16:30 172 134 4:45 24 63 23 51 114 16:45 170 641 124 532 1173 5:00 17 16 17:00 169 122 5:15 35 22 17:15 170 131 5:30 29 37 17:30 151 135 5:45 27 108 33 108 216 17:45 164 654 131 519 1173 6:00 26 31 18:00 186 92 6:15 38 40 18:15 150 102 6:30 53 58 18:30 121 112 6:45 63 180 69 198 378 18:45 109 566 95 401 967 7:00 60 86 19:00 101 90 7:15 109 83 19:15 80 83 7:30 167 112 19:30 58 74 7:45 148 484 129 410 894 19:45 62 301 61 308 609 8:00 124 101 20:00 67 56 8:15 75 102 20:15 61 42 8:30 81 81 20:30 60 41 8:45 65 345 68 352 697 20:45 44 232 35 174 406 9:00 68 59 21:00 32 42 9:15 63 46 21:15 28 54 9:30 57 50 21:30 45 52 9:45 55 243 56 211 454 21:45 23 128 36 184 312 10:00 56 60 22:00 25 38 10:15 68 57 22:15 17 32 10:30 73 56 22:30 23 31 10:45 71 268 47 220 488 22:45 8 73 18 119 192 11:00 63 54 23:00 8 17 11:15 69 44 23:15 14 23 11:30 57 86 23:30 13 19 11:45 77 266 70 254 520 23:45 6 41 8 67 108 Total Vol.2029 1917 3946 4326 3700 8026 EB WB Combined 6355 5617 11972 Split %51.4% 48.6%33.0%53.9% 46.1%67.0% Peak Hour 7:15 7:30 7:15 16:30 15:45 16:30 Volume 548 444 973 681 544 1192 P.H.F.0.82 0.86 0.87 0.99 0.96 0.97 Thursday, August 24, 2023 SC4157 ADT1 Suva east of Bluff.Prepared by AimTD LLC tel. 714 253 7888 Daily Totals AM PM cs@aimtd.com Tell. 714 253 7888 Apx-22 Attachment D CITY: Downey PROJECT: AM Period NB SB PM Period NB SB 0:00 1 5 12:00 43 52 0:15 5 3 12:15 46 27 0:30 5 3 12:30 38 36 0:45 5 16 4 15 31 12:45 51 178 41 156 334 1:00 3 4 13:00 38 48 1:15 3 4 13:15 52 37 1:30 2 3 13:30 61 44 1:45 1 9 9 20 29 13:45 67 218 32 161 379 2:00 6 2 14:00 64 80 2:15 3 2 14:15 57 41 2:30 6 4 14:30 74 60 2:45 5 20 3 11 31 14:45 78 273 73 254 527 3:00 2 5 15:00 90 84 3:15 1 7 15:15 73 58 3:30 5 5 15:30 83 70 3:45 8 16 9 26 42 15:45 83 329 69 281 610 4:00 16 12 16:00 69 63 4:15 7 10 16:15 77 60 4:30 15 22 16:30 87 71 4:45 24 62 35 79 141 16:45 94 327 59 253 580 5:00 20 23 17:00 93 66 5:15 34 25 17:15 79 63 5:30 25 35 17:30 89 66 5:45 35 114 31 114 228 17:45 74 335 74 269 604 6:00 14 26 18:00 77 46 6:15 25 26 18:15 68 60 6:30 28 33 18:30 68 60 6:45 41 108 43 128 236 18:45 44 257 30 196 453 7:00 31 54 19:00 50 54 7:15 51 48 19:15 45 46 7:30 82 81 19:30 52 34 7:45 117 281 100 283 564 19:45 33 180 25 159 339 8:00 70 91 20:00 37 32 8:15 48 52 20:15 35 21 8:30 45 63 20:30 38 23 8:45 44 207 36 242 449 20:45 33 143 23 99 242 9:00 32 32 21:00 35 27 9:15 28 30 21:15 37 26 9:30 26 30 21:30 25 19 9:45 20 106 31 123 229 21:45 20 117 13 85 202 10:00 30 53 22:00 17 14 10:15 42 28 22:15 16 13 10:30 29 40 22:30 12 14 10:45 39 140 31 152 292 22:45 8 53 6 47 100 11:00 28 33 23:00 5 5 11:15 43 34 23:15 17 20 11:30 36 47 23:30 18 10 11:45 44 151 40 154 305 23:45 7 47 7 42 89 Total Vol.1230 1347 2577 2457 2002 4459 NB SB Combined 3687 3349 7036 Split %47.7% 52.3%36.6%55.1% 44.9%63.4% Peak Hour 7:15 7:30 7:30 16:45 14:45 16:30 Volume 320 324 641 355 285 612 P.H.F.0.68 0.81 0.74 0.92 0.85 0.96 Thursday, August 24, 2023 SC4157 ADT2 Scout south of Suva.Prepared by AimTD LLC tel. 714 253 7888 Daily Totals AM PM cs@aimtd.com Tell. 714 253 7888 Apx-23 Attachment D CITY: Downey PROJECT: AM Period NB SB PM Period NB SB 0:00 43 83 12:00 211 246 0:15 37 59 12:15 206 236 0:30 26 59 12:30 224 233 0:45 31 137 56 257 394 12:45 194 835 244 959 1794 1:00 32 43 13:00 243 242 1:15 24 34 13:15 182 232 1:30 19 35 13:30 262 223 1:45 19 94 41 153 247 13:45 234 921 235 932 1853 2:00 34 27 14:00 307 264 2:15 40 30 14:15 250 243 2:30 23 27 14:30 307 279 2:45 36 133 25 109 242 14:45 341 1205 313 1099 2304 3:00 31 21 15:00 346 261 3:15 27 19 15:15 294 293 3:30 49 29 15:30 304 313 3:45 48 155 34 103 258 15:45 290 1234 338 1205 2439 4:00 58 37 16:00 335 333 4:15 88 29 16:15 347 378 4:30 112 48 16:30 344 383 4:45 127 385 60 174 559 16:45 315 1341 359 1453 2794 5:00 119 83 17:00 296 379 5:15 165 64 17:15 336 363 5:30 204 98 17:30 291 367 5:45 190 678 104 349 1027 17:45 308 1231 352 1461 2692 6:00 153 113 18:00 303 357 6:15 204 130 18:15 323 362 6:30 225 149 18:30 264 331 6:45 241 823 207 599 1422 18:45 246 1136 277 1327 2463 7:00 310 254 19:00 249 260 7:15 359 314 19:15 235 252 7:30 341 313 19:30 173 257 7:45 316 1326 323 1204 2530 19:45 225 882 196 965 1847 8:00 343 294 20:00 206 144 8:15 251 217 20:15 178 93 8:30 253 249 20:30 182 57 8:45 251 1098 251 1011 2109 20:45 132 698 64 358 1056 9:00 230 172 21:00 165 161 9:15 179 208 21:15 158 162 9:30 210 183 21:30 177 169 9:45 203 822 221 784 1606 21:45 147 647 137 629 1276 10:00 174 218 22:00 138 154 10:15 208 168 22:15 107 130 10:30 208 190 22:30 86 130 10:45 156 746 200 776 1522 22:45 93 424 103 517 941 11:00 203 208 23:00 63 94 11:15 193 207 23:15 64 108 11:30 196 220 23:30 63 92 11:45 205 797 240 875 1672 23:45 58 248 71 365 613 Total Vol.7194 6394 13588 10802 11270 22072 NB SB Combined 17996 17664 35660 Split %52.9% 47.1%38.1%48.9% 51.1%61.9% Peak Hour 7:15 7:15 7:15 16:00 16:15 16:15 Volume 1359 1244 2603 1341 1499 2801 P.H.F.0.95 0.96 0.97 0.99 0.98 0.96 Thursday, August 24, 2023 SC4157 ADT4 Paramount north of Suva.Prepared by AimTD LLC tel. 714 253 7888 Daily Totals AM PM cs@aimtd.com Tell. 714 253 7888 Apx-24 Attachment D CITY: Downey PROJECT: AM Period NB SB PM Period NB SB 0:00 42 76 12:00 196 240 0:15 33 54 12:15 185 232 0:30 23 53 12:30 209 230 0:45 30 128 47 230 358 12:45 186 776 235 937 1713 1:00 27 38 13:00 216 229 1:15 22 29 13:15 180 218 1:30 17 26 13:30 237 229 1:45 15 81 35 128 209 13:45 218 851 234 910 1761 2:00 32 24 14:00 295 254 2:15 32 27 14:15 244 238 2:30 22 25 14:30 292 273 2:45 30 116 19 95 211 14:45 332 1163 343 1108 2271 3:00 28 20 15:00 322 273 3:15 26 16 15:15 271 273 3:30 40 24 15:30 287 306 3:45 42 136 26 86 222 15:45 284 1164 306 1158 2322 4:00 46 29 16:00 318 328 4:15 69 27 16:15 329 369 4:30 96 43 16:30 324 381 4:45 103 314 44 143 457 16:45 281 1252 354 1432 2684 5:00 98 73 17:00 254 359 5:15 135 54 17:15 322 351 5:30 166 85 17:30 279 338 5:45 158 557 90 302 859 17:45 281 1136 346 1394 2530 6:00 132 105 18:00 264 346 6:15 175 119 18:15 273 324 6:30 185 139 18:30 223 303 6:45 205 697 200 563 1260 18:45 210 970 268 1241 2211 7:00 279 241 19:00 220 247 7:15 311 297 19:15 204 254 7:30 329 315 19:30 167 236 7:45 283 1202 352 1205 2407 19:45 209 800 193 930 1730 8:00 312 320 20:00 197 140 8:15 206 231 20:15 156 78 8:30 224 248 20:30 165 59 8:45 202 944 251 1050 1994 20:45 126 644 61 338 982 9:00 203 173 21:00 151 147 9:15 155 206 21:15 148 136 9:30 187 189 21:30 165 156 9:45 174 719 218 786 1505 21:45 139 603 127 566 1169 10:00 156 204 22:00 123 145 10:15 168 169 22:15 102 120 10:30 171 192 22:30 84 116 10:45 137 632 194 759 1391 22:45 93 402 93 474 876 11:00 184 194 23:00 64 87 11:15 172 191 23:15 62 90 11:30 175 219 23:30 63 84 11:45 176 707 232 836 1543 23:45 50 239 69 330 569 Total Vol.6233 6183 12416 10000 10818 20818 NB SB Combined 16233 17001 33234 Split %50.2% 49.8%37.4%48.0% 52.0%62.6% Peak Hour 7:15 7:15 7:15 15:45 16:15 16:00 Volume 1235 1284 2519 1255 1463 2684 P.H.F.0.94 0.91 0.98 0.96 0.96 0.95 Thursday, August 24, 2023 SC4157 ADT4 Paramount south of Suva.Prepared by AimTD LLC tel. 714 253 7888 Daily Totals AM PM cs@aimtd.com Tell. 714 253 7888 Apx-25 Attachment D CITY: Downey PROJECT: AM Period EB WB PM Period EB WB 0:00 2 4 12:00 19 20 0:15 1 4 12:15 32 27 0:30 2 1 12:30 35 25 0:45 0 5 4 13 18 12:45 35 121 20 92 213 1:00 0 2 13:00 25 19 1:15 2 1 13:15 32 30 1:30 0 6 13:30 30 28 1:45 0 2 1 10 12 13:45 44 131 24 101 232 2:00 0 2 14:00 37 35 2:15 0 3 14:15 42 22 2:30 1 2 14:30 44 32 2:45 0 1 1 8 9 14:45 37 160 38 127 287 3:00 1 0 15:00 49 44 3:15 0 2 15:15 25 41 3:30 3 3 15:30 45 41 3:45 2 6 1 6 12 15:45 41 160 55 181 341 4:00 1 1 16:00 51 47 4:15 2 1 16:15 44 55 4:30 1 2 16:30 50 50 4:45 3 7 2 6 13 16:45 53 198 39 191 389 5:00 8 1 17:00 50 43 5:15 3 4 17:15 57 45 5:30 4 11 17:30 42 45 5:45 4 19 8 24 43 17:45 54 203 53 186 389 6:00 6 7 18:00 54 30 6:15 9 15 18:15 50 29 6:30 13 20 18:30 47 32 6:45 21 49 34 76 125 18:45 40 191 34 125 316 7:00 22 28 19:00 37 24 7:15 35 36 19:15 34 31 7:30 50 32 19:30 25 31 7:45 65 172 49 145 317 19:45 25 121 29 115 236 8:00 47 53 20:00 16 21 8:15 28 44 20:15 22 20 8:30 39 28 20:30 23 18 8:45 23 137 30 155 292 20:45 17 78 14 73 151 9:00 26 20 21:00 4 11 9:15 16 16 21:15 8 10 9:30 26 25 21:30 14 16 9:45 22 90 22 83 173 21:45 7 33 15 52 85 10:00 15 14 22:00 5 16 10:15 17 22 22:15 8 18 10:30 25 14 22:30 12 5 10:45 26 83 14 64 147 22:45 1 26 7 46 72 11:00 25 18 23:00 1 6 11:15 22 19 23:15 3 8 11:30 19 31 23:30 1 5 11:45 30 96 29 97 193 23:45 1 6 4 23 29 Total Vol.667 687 1354 1428 1312 2740 EB WB Combined 2095 1999 4094 Split %49.3% 50.7%33.1%52.1% 47.9%66.9% Peak Hour 7:15 7:30 7:30 16:30 15:45 15:45 Volume 197 178 368 210 207 393 P.H.F.0.76 0.84 0.81 0.92 0.94 0.98 Thursday, August 24, 2023 SC4157 ADT1 Foster Bridge west of Bluff.Prepared by AimTD LLC tel. 714 253 7888 Daily Totals AM PM cs@aimtd.com Tell. 714 253 7888 Apx-26 Attachment D T218 DATE:LOCATION:PROJECT #:SC4157 Thu, Aug 24, 23 NORTH & SOUTH:LOCATION #:2 EAST & WEST:CONTROL:STOP ALL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:0 2 0 0 2 0 0 1 0 0 1 0 0 0 0 0 7:00 AM 6 7 18 1 16 3 0 7 7 31 15 1 112 0 0 0 0 0 7:15 AM 6 11 34 6 15 2 3 13 5 28 20 1 144 0 0 0 0 0 7:30 AM 25 12 45 4 26 12 9 20 23 32 27 0 235 0 0 0 0 0 7:45 AM 54 16 47 1 14 32 40 13 44 42 27 0 330 0 0 0 0 0 8:00 AM 17 19 34 1 18 5 21 19 38 35 9 0 216 0 0 0 0 0 8:15 AM 14 17 17 3 18 4 3 15 9 25 15 1 141 0 0 0 0 0 8:30 AM 9 15 21 1 11 5 5 12 29 23 16 1 148 0 0 0 0 0 8:45 AM 14 10 20 3 11 0 0 10 10 15 18 2 113 0 0 0 0 0 VOLUMES 145 107 236 20 129 63 81 109 165 231 147 6 1,439 0 0 0 0 0 APPROACH %30%22%48%9%61%30%23%31%46%60%38%2% APP/DEPART 488 /194 212 /525 355 /365 384 /355 0 BEGIN PEAK HR VOLUMES 102 58 160 12 73 51 73 65 110 137 83 1 925 APPROACH %32%18%50%9%54%38%29%26%44%62%38%0% PEAK HR FACTOR 0.684 0.723 0.639 0.801 0.701 APP/DEPART 320 /132 136 /320 248 /237 221 /236 0 4:00 PM 4 19 46 2 11 1 0 30 3 49 22 0 187 0 0 0 0 0 4:15 PM 2 24 51 6 13 0 1 39 7 40 21 2 206 0 0 0 0 0 4:30 PM 8 15 64 5 13 0 1 46 8 50 26 0 236 0 0 0 0 0 4:45 PM 8 30 56 4 14 0 2 46 9 36 32 3 240 0 0 0 0 0 5:00 PM 4 26 63 2 13 2 1 39 10 43 30 1 234 0 0 0 0 0 5:15 PM 3 17 59 2 21 3 3 42 8 34 20 1 213 0 0 0 0 0 5:30 PM 11 16 62 6 10 3 3 29 5 51 15 2 213 0 1 0 0 1 5:45 PM 7 21 46 7 22 4 12 53 11 41 25 2 251 0 0 0 0 0 VOLUMES 47 168 447 34 117 13 23 324 61 344 191 11 1,780 0 1 0 0 1 APPROACH %7%25%68%21%71%8%6%79%15%63%35%2% APP/DEPART 662 /203 164 /522 408 /804 546 /251 0 BEGIN PEAK HR VOLUMES 23 88 242 13 61 5 7 173 35 163 108 5 923 APPROACH %7%25%69%16%77%6%3%80%16%59%39%2% PEAK HR FACTOR 0.939 0.760 0.943 0.908 0.961 APP/DEPART 353 /100 79 /259 215 /428 276 /136 0 Scout NORTH SIDE Suva WEST SIDE EAST SIDE Suva SOUTH SIDE Scout INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Downey Scout Suva U-TURNS Scout Scout Suva Suva AM7:15 AM PM4:30 PM Apx-27 Attachment D 376 76 246 54 TOTAL 397 164 13 117 34 PM 203 212 63 129 20 AM 194 384 546 930 606 251 355 6 11 17 147 191 338 TOTALPMAM231 344 575 104 23 81 AMPMTOTAL433 324 109 226 61 165 365 804 1,169 763 408 355 525 AM 145 107 236 488 522 PM 47 168 447 662 1,047 TOTAL 192 275 683 1,150 215 56 134 25 TOTAL 232 79 5 61 13 PM 100 136 51 73 12 AM 132 221 276 497 372 136 236 1 5 6 83 108 191 TOTALPMAMAM 7:15 AM 8:45 AM 137 163 300 80 7 73 #N/A AMPMTOTAL238 173 65 PM 4:30 PM 5:45 PM 145 35 110 237 428 665 463 215 248 320 AM 102 58 160 320 259 PM 23 88 242 353 579 Total 125 146 402 673 AimTD LLC TURNING MOVEMENT COUNTS Scout SuvaSuvaDowney SC4157 ALL HOURS Scout Scout Scout SuvaSuvaPEAK HOUR Apx-28 Attachment D T218 DATE:LOCATION:PROJECT #:SC4157 Thu, Aug 24, 23 NORTH & SOUTH:LOCATION #:1 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 7:00 AM 1 0 1 15 0 1 0 23 2 0 50 8 101 0 0 0 0 0 7:15 AM 0 0 0 22 0 0 0 52 0 0 44 4 122 0 0 0 0 0 7:30 AM 0 0 3 42 0 0 0 72 1 0 66 15 199 0 0 0 0 0 7:45 AM 1 0 0 26 0 1 0 58 1 0 69 14 170 0 0 0 0 0 8:00 AM 1 0 1 21 0 1 1 55 2 2 39 9 132 0 0 0 0 0 8:15 AM 0 0 0 13 0 0 0 35 1 0 41 17 107 0 0 0 0 0 8:30 AM 0 0 1 9 0 1 1 33 0 0 33 20 98 0 0 0 0 0 8:45 AM 3 0 1 11 0 0 1 32 1 1 30 8 88 0 0 0 0 0 VOLUMES 6 0 7 159 0 4 3 360 8 3 372 95 1,017 0 0 0 0 0 APPROACH %46%0%54%98%0%2%1%97%2%1%79%20% APP/DEPART 13 /98 163 /11 371 /526 470 /382 0 BEGIN PEAK HR VOLUMES 2 0 4 111 0 2 1 237 4 2 218 42 623 APPROACH %33%0%67%98%0%2%0%98%2%1%83%16% PEAK HR FACTOR 0.500 0.673 0.829 0.789 0.783 APP/DEPART 6 /43 113 /6 242 /352 262 /222 0 4:00 PM 1 0 0 13 0 0 1 80 0 0 67 18 180 0 0 0 0 0 4:15 PM 0 0 0 22 0 0 0 92 0 0 70 17 201 0 0 0 0 0 4:30 PM 0 0 0 15 0 0 2 108 0 0 67 18 210 0 0 0 0 0 4:45 PM 0 0 0 13 0 0 0 107 2 0 69 18 209 0 0 0 0 0 5:00 PM 0 0 1 13 0 2 3 105 1 0 69 10 204 0 0 0 0 0 5:15 PM 0 0 1 9 0 1 3 105 0 0 54 34 207 0 0 0 0 0 5:30 PM 0 0 0 11 0 1 1 98 1 0 75 16 203 0 0 0 0 0 5:45 PM 0 0 1 14 0 1 0 97 1 1 64 14 193 0 0 0 0 0 VOLUMES 1 0 3 110 0 5 10 792 5 1 535 145 1,607 0 0 0 0 0 APPROACH %25%0%75%96%0%4%1%98%1%0%79%21% APP/DEPART 4 /155 115 /6 807 /905 681 /541 0 BEGIN PEAK HR VOLUMES 0 0 2 50 0 3 8 425 3 0 259 80 830 APPROACH %0%0%100%94%0%6%2%97%1%0%76%24% PEAK HR FACTOR 0.500 0.883 0.991 0.963 0.988 APP/DEPART 2 /88 53 /3 436 /477 339 /262 0 Bluff NORTH SIDE Suva WEST SIDE EAST SIDE Suva SOUTH SIDE Bluff INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Downey Bluff Suva U-TURNS Bluff Bluff Suva Suva AM7:15 AM PM4:30 PM Apx-29 Attachment D 278 9 0 269 TOTAL 253 115 5 0 110 PM 155 163 4 0 159 AM 98 470 681 1,151 923 541 382 95 145 240 372 535 907 TOTALPMAM3 1 4 13 10 3 AMPMTOTAL1,152 792 360 13 5 8 526 905 1,431 1,178 807 371 11 AM 6 0 7 13 6 PM 1 0 3 4 17 TOTAL 7 0 10 17 166 5 0 161 TOTAL 131 53 3 0 50 PM 88 113 2 0 111 AM 43 262 339 601 484 262 222 42 80 122 218 259 477 TOTALPMAMAM 7:15 AM 8:45 AM 2 0 2 9 8 1 #N/A AMPMTOTAL662 425 237 PM 4:30 PM 5:45 PM 7 3 4 352 477 829 678 436 242 6 AM 2 0 4 6 3 PM 0 0 2 2 9 Total 2 0 6 8 AimTD LLC TURNING MOVEMENT COUNTS Bluff SuvaSuvaDowney SC4157 ALL HOURS Bluff Bluff Bluff SuvaSuvaPEAK HOUR Apx-30 Attachment D T218 DATE:LOCATION:PROJECT #:SC4157 Thu, Aug 24, 23 NORTH & SOUTH:LOCATION #:1 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 7:00 AM 0 0 0 0 0 0 0 21 0 0 28 0 49 0 0 1 0 1 7:15 AM 0 0 0 0 0 1 0 35 0 0 35 0 71 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 50 0 0 31 0 81 0 0 0 1 1 7:45 AM 1 0 0 0 0 2 0 64 0 0 46 0 113 0 0 1 0 1 8:00 AM 0 0 0 0 0 2 0 47 0 0 51 0 100 0 0 0 0 0 8:15 AM 0 0 0 0 0 0 1 27 0 0 44 0 72 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 1 38 0 0 28 0 67 0 0 0 0 0 8:45 AM 0 0 0 0 0 1 1 21 0 0 29 0 52 0 0 1 0 1 VOLUMES 1 0 0 0 0 6 3 303 0 0 292 0 609 0 0 3 1 4 APPROACH %100%0%0%0%0%100%1%98%0%0%100%0% APP/DEPART 1 /3 6 /0 309 /304 293 /302 0 BEGIN PEAK HR VOLUMES 1 0 0 0 0 4 1 188 0 0 172 0 368 APPROACH %100%0%0%0%0%100%1%99%0%0%99%0% PEAK HR FACTOR 0.250 0.500 0.731 0.848 0.807 APP/DEPART 1 /1 4 /0 190 /189 173 /178 0 4:00 PM 0 0 0 0 0 0 1 49 0 0 47 0 97 0 0 1 0 1 4:15 PM 0 0 0 0 0 0 1 43 0 0 55 0 99 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 49 0 0 49 0 98 0 0 1 1 2 4:45 PM 0 0 0 0 0 2 2 50 0 0 37 0 91 0 0 1 0 1 5:00 PM 0 0 0 0 0 0 0 50 0 0 43 0 93 0 0 0 0 0 5:15 PM 0 0 0 0 0 1 0 55 0 0 43 0 99 0 0 2 1 3 5:30 PM 0 0 0 0 0 1 0 42 0 0 44 0 87 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 2 52 0 0 52 0 106 0 0 0 1 1 VOLUMES 0 0 0 0 0 4 6 390 0 0 370 0 778 0 0 5 3 8 APPROACH %0%0%0%0%0%100%1%97%0%0%99%0% APP/DEPART 0 /6 4 /0 401 /393 373 /379 0 BEGIN PEAK HR VOLUMES 0 0 0 0 0 2 2 199 0 0 182 0 389 APPROACH %0%0%0%0%0%100%1%98%0%0%99%0% PEAK HR FACTOR 0.000 0.250 0.890 0.836 0.909 APP/DEPART 0 /2 2 /0 203 /201 184 /186 0 Bluff NORTH SIDE Foster Bridge WEST SIDE EAST SIDE Foster Bridge SOUTH SIDE BluffAM7:30 AM PM5:00 PM U-TURNS Bluff Bluff Foster Bridge Foster Bridge INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Downey Bluff Foster Bridge Apx-31 Attachment D 10 10 0 0 TOTAL 9 4 4 0 0 PM 6 6 6 0 0 AM 3 293 373 666 681 379 302 0 0 0 292 370 662 TOTALPMAM0 0 0 9 6 3 AMPMTOTAL693 390 303 0 0 0 304 393 697 710 401 309 0 AM 1 0 0 1 0 PM 0 0 0 0 0 TOTAL 1 0 0 1 6 6 0 0 TOTAL 3 2 2 0 0 PM 2 4 4 0 0 AM 1 173 184 357 364 186 178 0 0 0 172 182 354 TOTALPMAMAM 7:30 AM 8:45 AM 0 0 0 3 2 1 #N/A AMPMTOTAL387 199 188 PM 5:00 PM 5:45 PM 0 0 0 189 201 390 393 203 190 0 AM 1 0 0 1 0 PM 0 0 0 0 0 Total 1 0 0 1 Bluff Bluff Bluff Foster BridgeFoster BridgePEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS Bluff Foster BridgeFoster BridgeDowney SC4157 ALL HOURS Apx-32 Attachment D T218 DATE:LOCATION:PROJECT #:SC4157 Thu, Aug 24, 23 NORTH & SOUTH:LOCATION #:3 EAST & WEST:CONTROL:STOP ALL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 7:00 AM 13 4 1 1 4 25 5 42 17 1 44 2 159 0 0 0 0 0 7:15 AM 15 5 3 0 2 26 17 61 25 0 49 0 203 0 0 0 0 0 7:30 AM 27 5 3 1 5 31 16 95 45 4 48 0 280 0 0 0 0 0 7:45 AM 31 5 4 0 11 49 38 85 42 2 45 2 314 0 0 0 0 0 8:00 AM 33 12 3 3 2 18 26 60 42 6 51 2 258 0 0 0 0 0 8:15 AM 29 7 1 0 5 17 16 43 14 6 53 0 191 0 0 0 0 0 8:30 AM 29 2 3 1 3 15 9 48 25 3 38 1 177 0 0 0 0 0 8:45 AM 16 5 2 0 4 15 9 43 13 2 37 1 147 0 0 0 0 0 VOLUMES 193 45 20 6 36 196 136 477 223 24 365 8 1,729 0 0 0 0 0 APPROACH %75%17%8%3%15%82%16%57%27%6%92%2% APP/DEPART 258 /189 238 /283 836 /503 397 /754 0 BEGIN PEAK HR VOLUMES 106 27 13 4 20 124 97 301 154 12 193 4 1,055 APPROACH %73%18%9%3%14%84%18%55%28%6%92%2% PEAK HR FACTOR 0.760 0.617 0.836 0.886 0.840 APP/DEPART 146 /128 148 /186 552 /318 209 /423 0 4:00 PM 21 8 1 3 1 22 37 87 23 1 106 1 311 0 0 0 0 0 4:15 PM 31 6 3 0 4 16 31 81 40 2 93 0 307 0 0 0 0 0 4:30 PM 15 8 3 0 5 27 29 112 38 1 89 1 328 0 0 0 0 0 4:45 PM 17 6 5 8 8 26 26 106 30 5 82 5 324 0 0 0 0 0 5:00 PM 12 13 2 4 7 15 47 97 32 3 91 1 324 0 0 0 0 0 5:15 PM 31 9 2 2 6 24 32 95 31 3 83 5 323 0 0 0 0 0 5:30 PM 24 10 4 2 4 14 35 96 32 5 91 2 319 0 0 0 0 0 5:45 PM 30 5 3 1 5 17 18 104 31 4 88 2 308 0 0 0 0 0 VOLUMES 181 65 23 20 40 161 255 778 257 24 723 17 2,544 0 0 0 0 0 APPROACH %67%24%9%9%18%73%20%60%20%3%95%2% APP/DEPART 269 /337 221 /321 1,290 /821 764 /1,065 0 BEGIN PEAK HR VOLUMES 75 36 12 14 26 92 134 410 131 12 345 12 1,299 APPROACH %61%29%10%11%20%70%20%61%19%3%93%3% PEAK HR FACTOR 0.732 0.786 0.943 0.971 0.990 APP/DEPART 123 /182 132 /169 675 /436 369 /512 0 Guatemala NORTH SIDE Suva WEST SIDE EAST SIDE Suva SOUTH SIDE Guatemala INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Downey Guatemala Suva U-TURNS Guatemala Guatemala Suva Suva AM7:15 AM PM4:30 PM Apx-33 Attachment D 459 357 76 26 TOTAL 526 221 161 40 20 PM 337 238 196 36 6 AM 189 397 764 1,161 1,819 1,065 754 8 17 25 365 723 1,088 TOTALPMAM24 24 48 391 255 136 AMPMTOTAL1,255 778 477 480 257 223 503 821 1,324 2,126 1,290 836 283 AM 193 45 20 258 321 PM 181 65 23 269 604 TOTAL 374 110 43 527 280 216 46 18 TOTAL 310 132 92 26 14 PM 182 148 124 20 4 AM 128 209 369 578 935 512 423 4 12 16 193 345 538 TOTALPMAMAM 7:15 AM 8:45 AM 12 12 24 231 134 97 #N/A AMPMTOTAL711 410 301 PM 4:30 PM 5:45 PM 285 131 154 318 436 754 1,227 675 552 186 AM 106 27 13 146 169 PM 75 36 12 123 355 Total 181 63 25 269 AimTD LLC TURNING MOVEMENT COUNTS Guatemala SuvaSuvaDowney SC4157 ALL HOURS Guatemala Guatemala Guatemala SuvaSuvaPEAK HOUR Apx-34 Attachment D T218 DATE:LOCATION:PROJECT #:SC4157 Thu, Aug 24, 23 NORTH & SOUTH:LOCATION #:4 EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES:1 2 0 1 2 0 0 1 0 0 1 0 0 0 0 0 7:00 AM 14 263 2 1 227 26 40 1 11 3 4 7 599 0 0 0 0 0 7:15 AM 20 291 0 2 269 43 58 3 24 3 4 9 726 1 1 0 0 2 7:30 AM 35 292 2 2 271 40 45 4 41 3 3 4 742 0 0 0 0 0 7:45 AM 25 254 4 1 290 32 52 11 54 8 5 10 746 0 0 0 0 0 8:00 AM 25 284 3 8 270 16 45 7 48 2 5 11 724 0 3 0 0 3 8:15 AM 9 194 3 3 197 17 51 6 32 2 0 5 519 0 1 0 0 1 8:30 AM 15 208 1 2 230 17 39 1 15 1 1 5 535 2 1 0 0 3 8:45 AM 7 194 1 1 231 19 53 2 19 1 4 4 536 0 0 0 0 0 VOLUMES 150 1,980 16 20 1,985 210 383 35 244 23 26 55 5,127 3 6 0 0 9 APPROACH %7%92%1%1%90%9%58%5%37%22%25%53% APP/DEPART 2,146 /2,424 2,215 /2,255 662 /65 104 /383 0 BEGIN PEAK HR VOLUMES 105 1,121 9 13 1,100 131 200 25 167 16 17 34 2,938 APPROACH %9%91%1%1%88%11%51%6%43%24%25%51% PEAK HR FACTOR 0.938 0.963 0.838 0.728 0.985 APP/DEPART 1,235 /1,359 1,244 /1,284 392 /43 67 /252 0 4:00 PM 23 288 7 4 284 45 45 6 44 0 2 2 750 0 0 0 0 0 4:15 PM 24 301 4 4 328 46 44 5 39 2 3 2 802 0 0 0 0 0 4:30 PM 26 295 3 2 337 44 49 10 40 1 0 0 807 3 0 0 0 3 4:45 PM 23 248 10 4 314 41 67 7 38 2 1 0 755 0 0 0 0 0 5:00 PM 11 239 4 4 327 48 54 12 30 1 2 3 735 1 0 0 0 1 5:15 PM 38 279 5 6 323 34 54 10 24 3 0 3 779 1 0 0 0 1 5:30 PM 23 245 11 6 308 53 40 6 29 1 1 6 729 0 0 0 0 0 5:45 PM 24 250 7 4 314 34 55 9 30 1 0 3 731 1 0 0 0 1 VOLUMES 192 2,145 51 34 2,535 345 408 65 274 11 9 19 6,088 6 0 0 0 6 APPROACH %8%90%2%1%87%12%55%9%37%28%23%49% APP/DEPART 2,388 /2,572 2,914 /2,826 747 /150 39 /540 0 BEGIN PEAK HR VOLUMES 96 1,132 24 14 1,263 176 205 28 161 5 6 4 3,114 APPROACH %8%90%2%1%87%12%52%7%41%33%40%27% PEAK HR FACTOR 0.951 0.948 0.879 0.536 0.965 APP/DEPART 1,252 /1,341 1,453 /1,432 394 /66 15 /275 0 Paramount NORTH SIDE Suva WEST SIDE EAST SIDE Suva SOUTH SIDE Paramount INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Downey Paramount Suva U-TURNS Paramount Paramount Suva Suva AM7:15 AM PM4:00 PM Apx-35 Attachment D 5,129 555 4,520 54 TOTAL 4,996 2,914 345 2,535 34 PM 2,572 2,215 210 1,985 20 AM 2,424 104 39 143 923 540 383 55 19 74 26 9 35 TOTALPMAM23 11 34 791 408 383 AMPMTOTAL100 65 35 518 274 244 65 150 215 1,409 747 662 2,255 AM 150 1,980 16 2,146 2,826 PM 192 2,145 51 2,388 5,081 TOTAL 342 4,125 67 4,534 2,697 307 2,363 27 TOTAL 2,700 1,453 176 1,263 14 PM 1,341 1,244 131 1,100 13 AM 1,359 67 15 82 527 275 252 34 4 38 17 6 23 TOTALPMAMAM 7:15 AM 8:45 AM 16 5 21 405 205 200 #N/A AMPMTOTAL53 28 25 PM 4:00 PM 5:45 PM 328 161 167 43 66 109 786 394 392 1,284 AM 105 1,121 9 1,235 1,432 PM 96 1,132 24 1,252 2,716 Total 201 2,253 33 2,487 AimTD LLC TURNING MOVEMENT COUNTS Paramount SuvaSuvaDowney SC4157 ALL HOURS Paramount Paramount Paramount SuvaSuvaPEAK HOUR Apx-36 Attachment D APPENDIX D LEVEL OF SERVICE WORKSHEETS Apx-37 Attachment D EXISTING Apx-38 Attachment D Intersection Analysis Summary 10/13/2023Report File: G:\...\AME.pdf Scenario 1 Existing AM Peak HourVistro File: G:\...\AME.vistro Dowey Foster Bridge Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C20.80.705WB RightHCM 7th EditionSignalizedSuva St (NS) at Paramount Blvd (EW)4 C19.60.822SB ThruHCM 7th EditionAll-way stopSuva St (NS) at Guatemala Ave (EW)3 B15.90.632SWB ThruHCM 7th EditionSignalizedSuva St (NS) at Bluff Rd (EW)2 C16.90.628SB RightHCM 7th EditionAll-way stopSuva St (NS) at Scout Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 10/13/20231 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-39 Attachment D 0.628Volume to Capacity (v/c): CLevel Of Service: 16.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 1: Suva St (NS) at Scout Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 731041722883146157931041118195Total Analysis Volume [veh/h] 1826457213639232603049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.70100.70100.70100.70100.70100.70100.70100.70100.70100.70100.70100.7010Peak Hour Factor 517312160581021106573183137Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 517312160581021106573183137Base Volume Input [veh/h] Name Volumes 10/13/20232 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-40 Attachment D CIntersection LOS 16.90Intersection Delay [s/veh] BCCCApproach LOS 12.1515.3519.5619.10Approach Delay [s/veh] 17.8419.7850.2363.80108.6695.1095th-Percentile Queue Length [ft] 0.710.792.012.554.353.8095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.190.210.410.480.630.59Degree of Utilization, x 499459554477564532Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/20233 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-41 Attachment D 0.632Volume to Capacity (v/c): BLevel Of Service: 15.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Suva St (NS) at Bluff Rd (EW) Intersection Level Of Service Report YesYesYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftLeft2RightThruLeftLeft2Right2RightThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/20234 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-42 Attachment D 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume along the le 000v_co, Outbound Pedestrian Volume along th 000v_di, Inbound Pedestrian Volume crossing th 000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 5031530311220542783Total Analysis Volume [veh/h] 1010176005513701Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.78300.78300.78300.78300.78300.78300.78300.78300.78300.78300.78300.7830Peak Hour Factor 4021423711172422182Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4021423711172422182Base Volume Input [veh/h] Name Volumes 10/13/20235 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-43 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.00.00.00.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.00.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010000100000100Pedestrian Clearance [s] 050005000050Walk [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Vehicle Extension [s] 019000190000190Split [s] 0.01.00.00.00.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Amber [s] 012000012000001200Maximum Green [s] 010000100000100Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 040006000020Signal Group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/20236 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-44 Attachment D 3.5299.83219.7295th-Percentile Queue Length [ft/ln] 0.143.998.7995th-Percentile Queue Length [veh/ln] 1.9655.46127.2350th-Percentile Queue Length [ft/ln] 0.082.225.0950th-Percentile Queue Length [veh/ln] NoNoYesCritical Lane Group BBBLane Group LOS 16.4611.7315.83d, Delay for Lane Group [s/veh] 0.020.400.77X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 0.020.341.80d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.110.110.11k, delay calibration 16.4311.4014.03d1, Uniform Delay [s] 412773719c, Capacity [veh/h] 169918641720s, saturation flow rate [veh/h] 0.010.170.32(v / s)_i Volume / Saturation Flow Rate 0.180.370.37g / C, Green / Cycle 91818g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 2.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 484848C, Cycle Length [s] CCCLane Group Lane Group Calculations 10/13/20237 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-45 Attachment D ABBBicycle LOS 1.5702.0692.112I_b,int, Bicycle LOS Score for Intersection 11.5511.5511.55d_b, Bicycle Delay [s] 619619619c_b, Capacity of the bicycle lane [bicycles/h] 200020002000s_b, Saturation Flow Rate of the bicycle lane AABCrosswalk LOS 1.6951.9312.391I_p,int, Pedestrian LOS Score for Intersection 16.0716.0716.07d_p, Pedestrian Delay [s] 0.000.000.00M_CW, Crosswalk Circulation Area [ft²/ped] 0.000.000.00M_corner, Corner Circulation Area [ft²/ped] 9.09.09.0g_Walk,mi, Effective Walk Time [s] Other Modes 0.632Intersection V/C BIntersection LOS 15.94d_I, Intersection Delay [s/veh] BBBApproach LOS 16.4611.7315.83d_A, Approach Delay [s/veh] BBBBBBBBBBBBMovement LOS 16.4616.4616.4616.4611.7311.7311.7311.7315.8315.8315.8315.83d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results 10/13/20238 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-46 Attachment D YesYesCrosswalk NoNoCurb Present 0.000.00Grade [%] 25.0025.00Speed [mph] 0.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 00000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 00000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] Right2RightThruLeftRight2RightThruLeftTurning Movement Lane Configuration SouthwestboundWestboundApproach Name Intersection Setup 10/13/20239 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-47 Attachment D 00Bicycle Volume [bicycles/h] 00v_ab, Corner Pedestrian Volume [ped/h] 00v_ci, Inbound Pedestrian Volume along the le 00v_co, Outbound Pedestrian Volume along th 00v_di, Inbound Pedestrian Volume crossing th 00v_do, Outbound Pedestrian Volume crossing 00000000Local Bus Stopping Rate [/h] 00000000On-Street Parking Maneuver Rate [/h] NoNoNoNoPresence of On-Street Parking 402401530142Total Analysis Volume [veh/h] 1060011035Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.78300.78300.78300.78300.78300.78300.78300.7830Peak Hour Factor 301881420111Total Hourly Volume [veh/h] 00000000Right Turn on Red Volume [veh/h] 00000000Other Volume [veh/h] 00000000Existing Site Adjustment Volume [veh/h] 00000000Pass-by Trips [veh/h] 00000000Diverted Trips [veh/h] 00000000Site-Generated Trips [veh/h] 00000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 301881420111Base Volume Input [veh/h] Name Volumes 10/13/202310 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-48 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.0Detector Location [ft] NoNoPedestrian Recall NoNoMaximum Recall NoNoMinimum Recall 0.00.02.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.02.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoRest In Walk 0.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0010000100Pedestrian Clearance [s] 00500050Walk [s] 0.00.03.00.00.00.03.00.0Vehicle Extension [s] 0022000190Split [s] 0.00.01.00.00.00.01.00.0All red [s] 0.00.03.00.00.00.03.00.0Amber [s] 001200001200Maximum Green [s] 0010000100Minimum Green [s] --------Lead / Lag Auxiliary Signal Groups 001000080Signal Group PermissivePermissivePermissivePermissivePermissivePermissivePermissivePermissiveControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202311 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-49 Attachment D 112.4664.8795th-Percentile Queue Length [ft/ln] 4.502.5995th-Percentile Queue Length [veh/ln] 62.4836.0450th-Percentile Queue Length [ft/ln] 2.501.4450th-Percentile Queue Length [veh/ln] YesYesCritical Lane Group BBLane Group LOS 19.9618.45d, Delay for Lane Group [s/veh] 0.660.36X, volume / capacity Lane Group Results 1.001.00PF, progression factor 1.001.00Rp, platoon ratio 0.000.00d3, Initial Queue Delay [s] 2.020.53d2, Incremental Delay [s] 1.001.00I, Upstream Filtering Factor 0.110.11k, delay calibration 17.9517.92d1, Uniform Delay [s] 371415c, Capacity [veh/h] 18641510s, saturation flow rate [veh/h] 0.130.10(v / s)_i Volume / Saturation Flow Rate 0.200.18g / C, Green / Cycle 109g_i, Effective Green Time [s] 2.002.00l2, Clearance Lost Time [s] 0.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.00L, Total Lost Time per Cycle [s] 4848C, Cycle Length [s] CCLane Group Lane Group Calculations 10/13/202312 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-50 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]18.45 18.45 18.45 18.45 19.96 19.96 19.96 19.96 Movement LOS B B B B B B B B d_A, Approach Delay [s/veh]18.45 19.96 Approach LOS B B d_I, Intersection Delay [s/veh]15.94 Intersection LOS B Intersection V/C 0.632 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 d_p, Pedestrian Delay [s]16.07 16.07 I_p,int, Pedestrian LOS Score for Intersection 1.837 1.817 Crosswalk LOS A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]619 743 d_b, Bicycle Delay [s]11.55 9.57 I_b,int, Bicycle LOS Score for Intersection 1.799 1.957 Bicycle LOS A A ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 -------------1042Ring 1 Sequence 10/13/202313 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-51 Attachment D 0.822Volume to Capacity (v/c): CLevel Of Service: 19.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 3: Suva St (NS) at Guatemala Ave (EW) Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 1482451532126183358115523014Total Analysis Volume [veh/h] 376148324690291574Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.84000.84000.84000.84000.84000.84000.84000.84000.84000.84000.84000.8400Peak Hour Factor 124204132710615430197419312Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 124204132710615430197419312Base Volume Input [veh/h] Name Volumes 10/13/202314 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-52 Attachment D CIntersection LOS 19.60Intersection Delay [s/veh] BBDBApproach LOS 11.9613.0625.5613.87Approach Delay [s/veh] 32.2935.2628.02209.4453.9795th-Percentile Queue Length [ft] 1.291.411.128.382.1695th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.310.330.280.820.43Degree of Utilization, x 578529664575578Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/202315 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-53 Attachment D 0.705Volume to Capacity (v/c): CLevel Of Service: 20.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Suva St (NS) at Paramount Blvd (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00115.00100.00100.00225.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/202316 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-54 Attachment D 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1331117139113810717025203351716Total Analysis Volume [veh/h] 33279322852742651944Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98500.98500.98500.98500.98500.98500.98500.98500.98500.98500.98500.9850Peak Hour Factor 1311100139112110516725200341716Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1311100139112110516725200341716Base Volume Input [veh/h] Name Volumes 10/13/202317 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-55 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 07007001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 028110281102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 012012001201200120001200Maximum Green [s] 0107010701000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtPerPermissPermissProtPerPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202318 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-56 Attachment D 336.39343.343.29246.06246.5128.71239.6931.3995th-Percentile Queue Length [ft/ln] 13.4613.730.139.849.861.159.591.2695th-Percentile Queue Length [veh/ln] 215.90221.341.83146.73147.0715.95141.9817.4450th-Percentile Queue Length [ft/ln] 8.648.850.075.875.880.645.680.7050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoCritical Lane Group CCABBBCBLane Group LOS 25.7925.379.8115.9215.9112.8223.0814.45d, Delay for Lane Group [s/veh] 0.930.920.040.700.700.260.640.11X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.125.740.041.111.100.335.030.33d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.50k, delay calibration 19.6719.649.7714.8114.8112.4918.0614.11d1, Uniform Delay [s] 664689362817819414621640c, Capacity [veh/h] 180118706231865187075915151613s, saturation flow rate [veh/h] 0.340.340.020.310.310.140.260.04(v / s)_i Volume / Saturation Flow Rate 0.370.370.520.440.440.520.350.35g / C, Green / Cycle 2424342929342323g_i, Effective Green Time [s] 2.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] CCLCCLCCLane Group Lane Group Calculations 10/13/202319 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-57 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.45 14.45 14.45 23.08 23.08 23.08 12.82 15.92 15.92 9.81 25.55 25.79 Movement LOS B B B C C C B B B A C C d_A, Approach Delay [s/veh]14.45 23.08 15.65 25.42 Approach LOS B C B C d_I, Intersection Delay [s/veh]20.75 Intersection LOS C Intersection V/C 0.705 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]24.13 24.13 24.13 24.13 I_p,int, Pedestrian LOS Score for Intersection 1.755 2.027 2.972 3.260 Crosswalk LOS A B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]677 677 738 738 d_b, Bicycle Delay [s]14.23 14.23 12.94 12.94 I_b,int, Bicycle LOS Score for Intersection 1.672 2.216 2.594 2.602 Bicycle LOS A B B B ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 10/13/202320 Scenario 1: 1 Existing AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-58 Attachment D Intersection Analysis Summary 10/13/2023Report File: G:\...\PME.pdf Scenario 1 Existing PM Peak HourVistro File: G:\...\PME.vistro Dowey Foster Bridge Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.60.781WB RightHCM 7th EditionSignalizedSuva St (NS) at Paramount Blvd (EW)4 D28.00.934SB ThruHCM 7th EditionAll-way stopSuva St (NS) at Guatemala Ave (EW)3 B12.80.485WB LeftHCM 7th EditionSignalizedSuva St (NS) at Bluff Rd (EW)2 B11.60.444NB LeftHCM 7th EditionAll-way stopSuva St (NS) at Scout Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 10/13/20231 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-59 Attachment D 0.444Volume to Capacity (v/c): BLevel Of Service: 11.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 1: Suva St (NS) at Scout Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 5631425292243618075112170Total Analysis Volume [veh/h] 116363236945212842Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96100.96100.96100.96100.96100.96100.96100.96100.96100.96100.96100.9610Peak Hour Factor 5611324288233517375108163Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5611324288233517375108163Base Volume Input [veh/h] Name Volumes 10/13/20232 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-60 Attachment D BIntersection LOS 11.60Intersection Delay [s/veh] ABBBApproach LOS 9.8611.1211.3112.95Approach Delay [s/veh] 5.966.2244.3718.6437.6757.0695th-Percentile Queue Length [ft] 0.240.251.770.751.512.2895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.070.080.380.200.340.44Degree of Utilization, x 555533664577655646Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/20233 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-61 Attachment D 0.485Volume to Capacity (v/c): BLevel Of Service: 12.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Suva St (NS) at Bluff Rd (EW) Intersection Level Of Service Report YesYesYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftLeft2RightThruLeftLeft2Right2RightThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/20234 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-62 Attachment D 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume along the le 000v_co, Outbound Pedestrian Volume along th 000v_di, Inbound Pedestrian Volume crossing th 000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 200034308317482620Total Analysis Volume [veh/h] 1000110821442660Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98800.98800.98800.98800.98800.98800.98800.98800.98800.98800.98800.9880Peak Hour Factor 200034258317282590Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 200034258317282590Base Volume Input [veh/h] Name Volumes 10/13/20235 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-63 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.00.00.00.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.00.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010000100000100Pedestrian Clearance [s] 050005000050Walk [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Vehicle Extension [s] 020000210000210Split [s] 0.01.00.00.00.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Amber [s] 012000012000001200Maximum Green [s] 010000100000100Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 040006000020Signal Group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/20236 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-64 Attachment D 0.62123.14127.8995th-Percentile Queue Length [ft/ln] 0.024.935.1295th-Percentile Queue Length [veh/ln] 0.3468.4171.0550th-Percentile Queue Length [ft/ln] 0.012.742.8450th-Percentile Queue Length [veh/ln] NoNoYesCritical Lane Group BBBLane Group LOS 14.4512.3212.93d, Delay for Lane Group [s/veh] 0.010.640.69X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 0.010.991.34d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.110.110.11k, delay calibration 14.4411.3311.59d1, Uniform Delay [s] 266693643c, Capacity [veh/h] 141418631712s, saturation flow rate [veh/h] 0.000.240.26(v / s)_i Volume / Saturation Flow Rate 0.120.320.32g / C, Green / Cycle 41212g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 2.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 373737C, Cycle Length [s] CCCLane Group Lane Group Calculations 10/13/20237 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-65 Attachment D ABBBicycle LOS 1.5632.2792.005I_b,int, Bicycle LOS Score for Intersection 6.015.455.45d_b, Bicycle Delay [s] 862916916c_b, Capacity of the bicycle lane [bicycles/h] 200020002000s_b, Saturation Flow Rate of the bicycle lane AABCrosswalk LOS 1.6691.9572.198I_p,int, Pedestrian LOS Score for Intersection 10.6510.6510.65d_p, Pedestrian Delay [s] 0.000.000.00M_CW, Crosswalk Circulation Area [ft²/ped] 0.000.000.00M_corner, Corner Circulation Area [ft²/ped] 9.09.09.0g_Walk,mi, Effective Walk Time [s] Other Modes 0.485Intersection V/C BIntersection LOS 12.80d_I, Intersection Delay [s/veh] BBBApproach LOS 14.4512.3212.93d_A, Approach Delay [s/veh] BBBBBBBBBBBBMovement LOS 14.4514.4514.4514.4512.3212.3212.3212.3212.9312.9312.9312.93d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results 10/13/20238 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-66 Attachment D YesYesCrosswalk NoNoCurb Present 0.000.00Grade [%] 25.0025.00Speed [mph] 0.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 00000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 00000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] Right2RightThruLeftRight2RightThruLeftTurning Movement Lane Configuration SouthwestboundWestboundApproach Name Intersection Setup 10/13/20239 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-67 Attachment D 00Bicycle Volume [bicycles/h] 00v_ab, Corner Pedestrian Volume [ped/h] 00v_ci, Inbound Pedestrian Volume along the le 00v_co, Outbound Pedestrian Volume along th 00v_di, Inbound Pedestrian Volume crossing th 00v_do, Outbound Pedestrian Volume crossing 00000000Local Bus Stopping Rate [/h] 00000000On-Street Parking Maneuver Rate [/h] NoNoNoNoPresence of On-Street Parking 50201223051Total Analysis Volume [veh/h] 1050111013Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98800.98800.98800.98800.98800.98800.98800.9880Peak Hour Factor 50199223050Total Hourly Volume [veh/h] 00000000Right Turn on Red Volume [veh/h] 00000000Other Volume [veh/h] 00000000Existing Site Adjustment Volume [veh/h] 00000000Pass-by Trips [veh/h] 00000000Diverted Trips [veh/h] 00000000Site-Generated Trips [veh/h] 00000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 50199223050Base Volume Input [veh/h] Name Volumes 10/13/202310 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-68 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.0Detector Location [ft] NoNoPedestrian Recall NoNoMaximum Recall NoNoMinimum Recall 0.00.02.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.02.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoRest In Walk 0.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0010000100Pedestrian Clearance [s] 00500050Walk [s] 0.00.03.00.00.00.03.00.0Vehicle Extension [s] 0019000200Split [s] 0.00.01.00.00.00.01.00.0All red [s] 0.00.03.00.00.00.03.00.0Amber [s] 001200001200Maximum Green [s] 0010000100Minimum Green [s] --------Lead / Lag Auxiliary Signal Groups 001000080Signal Group PermissivePermissivePermissivePermissivePermissivePermissivePermissivePermissiveControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202311 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-69 Attachment D 58.9317.5595th-Percentile Queue Length [ft/ln] 2.360.7095th-Percentile Queue Length [veh/ln] 32.749.7550th-Percentile Queue Length [ft/ln] 1.310.3950th-Percentile Queue Length [veh/ln] YesYesCritical Lane Group BBLane Group LOS 12.9215.06d, Delay for Lane Group [s/veh] 0.470.15X, volume / capacity Lane Group Results 1.001.00PF, progression factor 1.001.00Rp, platoon ratio 0.000.00d3, Initial Queue Delay [s] 0.770.18d2, Incremental Delay [s] 1.001.00I, Upstream Filtering Factor 0.110.11k, delay calibration 12.1514.88d1, Uniform Delay [s] 444375c, Capacity [veh/h] 18611586s, saturation flow rate [veh/h] 0.110.04(v / s)_i Volume / Saturation Flow Rate 0.240.12g / C, Green / Cycle 94g_i, Effective Green Time [s] 2.002.00l2, Clearance Lost Time [s] 0.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.00L, Total Lost Time per Cycle [s] 3737C, Cycle Length [s] CCLane Group Lane Group Calculations 10/13/202312 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-70 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.06 15.06 15.06 15.06 12.92 12.92 12.92 12.92 Movement LOS B B B B B B B B d_A, Approach Delay [s/veh]15.06 12.92 Approach LOS B B d_I, Intersection Delay [s/veh]12.80 Intersection LOS B Intersection V/C 0.485 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 d_p, Pedestrian Delay [s]10.65 10.65 I_p,int, Pedestrian LOS Score for Intersection 1.780 1.772 Crosswalk LOS A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]862 808 d_b, Bicycle Delay [s]6.01 6.59 I_b,int, Bicycle LOS Score for Intersection 1.649 1.895 Bicycle LOS A A ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 -------------1042Ring 1 Sequence 10/13/202313 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-71 Attachment D 0.934Volume to Capacity (v/c): DLevel Of Service: 28.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 3: Suva St (NS) at Guatemala Ave (EW) Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 9326141236761324141351234812Total Analysis Volume [veh/h] 2374391933104343873Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.99000.99000.99000.99000.99000.99000.99000.99000.99000.99000.99000.9900Peak Hour Factor 9226141236751314101341234512Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9226141236751314101341234512Base Volume Input [veh/h] Name Volumes 10/13/202314 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-72 Attachment D DIntersection LOS 28.04Intersection Delay [s/veh] BBECApproach LOS 11.7612.3939.5518.01Approach Delay [s/veh] 23.8723.8117.86303.14104.8495th-Percentile Queue Length [ft] 0.950.950.7112.134.1995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.240.240.190.930.62Degree of Utilization, x 544507680588605Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/202315 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-73 Attachment D 0.781Volume to Capacity (v/c): CLevel Of Service: 34.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Suva St (NS) at Paramount Blvd (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00115.00100.00100.00225.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/202316 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-74 Attachment D 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1821309152511739916729212465Total Analysis Volume [veh/h] 46327462932542753121Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96500.96500.96500.96500.96500.96500.96500.96500.96500.96500.96500.9650Peak Hour Factor 1761263142411329616128205465Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1761263142411329616128205465Base Volume Input [veh/h] Name Volumes 10/13/202317 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-75 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 07007001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 028110281102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 012012001201200120001200Maximum Green [s] 0107010701000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtPerPermissPermissProtPerPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202318 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-76 Attachment D 580.72564.633.63252.99254.1625.33254.586.8895th-Percentile Queue Length [ft/ln] 23.2322.590.1510.1210.171.0110.180.2895th-Percentile Queue Length [veh/ln] 393.94384.832.02151.92152.8014.07153.123.8250th-Percentile Queue Length [ft/ln] 15.7615.390.086.086.110.566.120.1550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoCritical Lane Group FFABBBCBLane Group LOS 57.0151.749.6015.7415.7313.2024.9814.31d, Delay for Lane Group [s/veh] 1.071.050.040.720.720.250.670.03X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 37.0031.730.051.171.160.335.910.08d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.50k, delay calibration 20.0120.019.5614.5714.5712.8719.0714.23d1, Uniform Delay [s] 689719363833839393605600c, Capacity [veh/h] 179218706061856187067415281542s, saturation flow rate [veh/h] 0.410.400.020.320.320.150.270.01(v / s)_i Volume / Saturation Flow Rate 0.390.390.540.450.450.540.340.34g / C, Green / Cycle 2525352929352222g_i, Effective Green Time [s] 2.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] CCLCCLCCLane Group Lane Group Calculations 10/13/202319 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-77 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.31 14.31 14.31 24.98 24.98 24.98 13.20 15.73 15.74 9.60 53.96 57.01 Movement LOS B B B C C C B B B A D E d_A, Approach Delay [s/veh]14.31 24.98 15.54 53.89 Approach LOS B C B D d_I, Intersection Delay [s/veh]34.63 Intersection LOS C Intersection V/C 0.781 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]24.13 24.13 24.13 24.13 I_p,int, Pedestrian LOS Score for Intersection 1.744 2.041 3.014 3.339 Crosswalk LOS A B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]677 677 738 738 d_b, Bicycle Delay [s]14.23 14.23 12.93 12.93 I_b,int, Bicycle LOS Score for Intersection 1.584 2.233 2.630 2.802 Bicycle LOS A B B C ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 10/13/202320 Scenario 1: 1 Existing PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-78 Attachment D EXISTING PLUS AMBIENT GROWTH PLUS CUMULATIVE Apx-79 Attachment D Intersection Analysis Summary 10/13/2023Report File: G:\...\AMEAC.pdf Scenario 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Vistro File: G:\...\AME.vistro Dowey Foster Bridge Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C20.90.716WB RightHCM 7th EditionSignalizedSuva St (NS) at Paramount Blvd (EW)4 C20.30.835SB ThruHCM 7th EditionAll-way stopSuva St (NS) at Guatemala Ave (EW)3 B16.00.634SWB ThruHCM 7th EditionSignalizedSuva St (NS) at Bluff Rd (EW)2 C17.10.637SB RightHCM 7th EditionAll-way stopSuva St (NS) at Scout Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 10/13/20231 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-80 Attachment D 0.637Volume to Capacity (v/c): CLevel Of Service: 17.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 1: Suva St (NS) at Scout Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 731041723083146157971041118197Total Analysis Volume [veh/h] 1826457213639242603049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.70100.70100.70100.70100.70100.70100.70100.70100.70100.70100.70100.7010Peak Hour Factor 517312161581021106873183138Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000030000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 517312160581021106573183137Base Volume Input [veh/h] Name Volumes 10/13/20232 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-81 Attachment D CIntersection LOS 17.15Intersection Delay [s/veh] BCCCApproach LOS 12.2115.4820.0019.38Approach Delay [s/veh] 17.9519.8951.1064.45112.1397.0495th-Percentile Queue Length [ft] 0.720.802.042.584.493.8895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.200.210.420.480.640.60Degree of Utilization, x 497456551475562529Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/20233 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-82 Attachment D 0.634Volume to Capacity (v/c): BLevel Of Service: 16.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Suva St (NS) at Bluff Rd (EW) Intersection Level Of Service Report YesYesYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftLeft2RightThruLeftLeft2Right2RightThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/20234 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-83 Attachment D 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume along the le 000v_co, Outbound Pedestrian Volume along th 000v_di, Inbound Pedestrian Volume crossing th 000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 5031530811221542803Total Analysis Volume [veh/h] 1010177005513701Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.78300.78300.78300.78300.78300.78300.78300.78300.78300.78300.78300.7830Peak Hour Factor 4021424111173422192Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000003000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4021423711172422182Base Volume Input [veh/h] Name Volumes 10/13/20235 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-84 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.00.00.00.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.00.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010000100000100Pedestrian Clearance [s] 050005000050Walk [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Vehicle Extension [s] 019000190000190Split [s] 0.01.00.00.00.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Amber [s] 012000012000001200Maximum Green [s] 010000100000100Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 040006000020Signal Group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/20236 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-85 Attachment D 3.54101.85221.2395th-Percentile Queue Length [ft/ln] 0.144.078.8595th-Percentile Queue Length [veh/ln] 1.9756.58128.3350th-Percentile Queue Length [ft/ln] 0.082.265.1350th-Percentile Queue Length [veh/ln] NoNoYesCritical Lane Group BBBLane Group LOS 16.5211.7515.85d, Delay for Lane Group [s/veh] 0.020.410.77X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 0.020.341.81d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.110.110.11k, delay calibration 16.5011.4114.04d1, Uniform Delay [s] 411775721c, Capacity [veh/h] 169918641721s, saturation flow rate [veh/h] 0.010.170.32(v / s)_i Volume / Saturation Flow Rate 0.180.380.38g / C, Green / Cycle 91818g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 2.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 494949C, Cycle Length [s] CCCLane Group Lane Group Calculations 10/13/20237 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-86 Attachment D ABBBicycle LOS 1.5702.0782.116I_b,int, Bicycle LOS Score for Intersection 11.6211.6211.62d_b, Bicycle Delay [s] 617617617c_b, Capacity of the bicycle lane [bicycles/h] 200020002000s_b, Saturation Flow Rate of the bicycle lane AABCrosswalk LOS 1.6951.9342.395I_p,int, Pedestrian LOS Score for Intersection 16.1416.1416.14d_p, Pedestrian Delay [s] 0.000.000.00M_CW, Crosswalk Circulation Area [ft²/ped] 0.000.000.00M_corner, Corner Circulation Area [ft²/ped] 9.09.09.0g_Walk,mi, Effective Walk Time [s] Other Modes 0.634Intersection V/C BIntersection LOS 15.97d_I, Intersection Delay [s/veh] BBBApproach LOS 16.5211.7515.85d_A, Approach Delay [s/veh] BBBBBBBBBBBBMovement LOS 16.5216.5216.5216.5211.7511.7511.7511.7515.8515.8515.8515.85d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results 10/13/20238 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-87 Attachment D YesYesCrosswalk NoNoCurb Present 0.000.00Grade [%] 25.0025.00Speed [mph] 0.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 00000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 00000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] Right2RightThruLeftRight2RightThruLeftTurning Movement Lane Configuration SouthwestboundWestboundApproach Name Intersection Setup 10/13/20239 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-88 Attachment D 00Bicycle Volume [bicycles/h] 00v_ab, Corner Pedestrian Volume [ped/h] 00v_ci, Inbound Pedestrian Volume along the le 00v_co, Outbound Pedestrian Volume along th 00v_di, Inbound Pedestrian Volume crossing th 00v_do, Outbound Pedestrian Volume crossing 00000000Local Bus Stopping Rate [/h] 00000000On-Street Parking Maneuver Rate [/h] NoNoNoNoPresence of On-Street Parking 402411530142Total Analysis Volume [veh/h] 1060011035Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.78300.78300.78300.78300.78300.78300.78300.7830Peak Hour Factor 301891420111Total Hourly Volume [veh/h] 00000000Right Turn on Red Volume [veh/h] 00000000Other Volume [veh/h] 00000000Existing Site Adjustment Volume [veh/h] 00000000Pass-by Trips [veh/h] 00000000Diverted Trips [veh/h] 00000000Site-Generated Trips [veh/h] 00000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 301881420111Base Volume Input [veh/h] Name Volumes 10/13/202310 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-89 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.0Detector Location [ft] NoNoPedestrian Recall NoNoMaximum Recall NoNoMinimum Recall 0.00.02.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.02.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoRest In Walk 0.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0010000100Pedestrian Clearance [s] 00500050Walk [s] 0.00.03.00.00.00.03.00.0Vehicle Extension [s] 0022000190Split [s] 0.00.01.00.00.00.01.00.0All red [s] 0.00.03.00.00.00.03.00.0Amber [s] 001200001200Maximum Green [s] 0010000100Minimum Green [s] --------Lead / Lag Auxiliary Signal Groups 001000080Signal Group PermissivePermissivePermissivePermissivePermissivePermissivePermissivePermissiveControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202311 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-90 Attachment D 113.6265.1895th-Percentile Queue Length [ft/ln] 4.542.6195th-Percentile Queue Length [veh/ln] 63.1236.2150th-Percentile Queue Length [ft/ln] 2.521.4550th-Percentile Queue Length [veh/ln] YesYesCritical Lane Group CBLane Group LOS 20.0918.52d, Delay for Lane Group [s/veh] 0.660.36X, volume / capacity Lane Group Results 1.001.00PF, progression factor 1.001.00Rp, platoon ratio 0.000.00d3, Initial Queue Delay [s] 2.060.53d2, Incremental Delay [s] 1.001.00I, Upstream Filtering Factor 0.110.11k, delay calibration 18.0317.99d1, Uniform Delay [s] 370414c, Capacity [veh/h] 18641510s, saturation flow rate [veh/h] 0.130.10(v / s)_i Volume / Saturation Flow Rate 0.200.18g / C, Green / Cycle 109g_i, Effective Green Time [s] 2.002.00l2, Clearance Lost Time [s] 0.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.00L, Total Lost Time per Cycle [s] 4949C, Cycle Length [s] CCLane Group Lane Group Calculations 10/13/202312 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-91 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]18.52 18.52 18.52 18.52 20.09 20.09 20.09 20.09 Movement LOS B B B B C C C C d_A, Approach Delay [s/veh]18.52 20.09 Approach LOS B C d_I, Intersection Delay [s/veh]15.97 Intersection LOS B Intersection V/C 0.634 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 d_p, Pedestrian Delay [s]16.14 16.14 I_p,int, Pedestrian LOS Score for Intersection 1.838 1.818 Crosswalk LOS A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]617 741 d_b, Bicycle Delay [s]11.62 9.64 I_b,int, Bicycle LOS Score for Intersection 1.799 1.959 Bicycle LOS A A ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 -------------1042Ring 1 Sequence 10/13/202313 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-92 Attachment D 0.835Volume to Capacity (v/c): CLevel Of Service: 20.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 3: Suva St (NS) at Guatemala Ave (EW) Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 1482471932126185363115523114Total Analysis Volume [veh/h] 376258324691291584Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.84000.84000.84000.84000.84000.84000.84000.84000.84000.84000.84000.8400Peak Hour Factor 124206162710615530597419412Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 002300030000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 124204132710615430197419312Base Volume Input [veh/h] Name Volumes 10/13/202314 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-93 Attachment D CIntersection LOS 20.27Intersection Delay [s/veh] BBDBApproach LOS 12.1113.2226.7114.04Approach Delay [s/veh] 33.1836.6128.68218.4054.9995th-Percentile Queue Length [ft] 1.331.461.158.742.2095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.310.340.280.840.44Degree of Utilization, x 573528659572573Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/202315 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-94 Attachment D 0.716Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Suva St (NS) at Paramount Blvd (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00115.00100.00100.00225.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/202316 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-95 Attachment D 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1341129139115710717125212371716Total Analysis Volume [veh/h] 34282322892743653944Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98500.98500.98500.98500.98500.98500.98500.98500.98500.98500.98500.9850Peak Hour Factor 1321112139114010516825209361716Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0800150008200Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1311100139112110516725200341716Base Volume Input [veh/h] Name Volumes 10/13/202317 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-96 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 07007001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 028110281102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 012012001201200120001200Maximum Green [s] 0107010701000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtPerPermissPermissProtPerPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202318 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-97 Attachment D 340.54347.243.27249.68250.1228.50248.6532.5195th-Percentile Queue Length [ft/ln] 13.6213.890.139.9910.001.149.951.3095th-Percentile Queue Length [veh/ln] 219.15224.411.81149.44149.7715.83148.6718.0650th-Percentile Queue Length [ft/ln] 8.778.980.075.985.990.635.950.7250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoCritical Lane Group CCABBBCBLane Group LOS 25.9925.539.8415.9415.9412.8523.8514.58d, Delay for Lane Group [s/veh] 0.930.930.040.710.710.260.660.11X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.355.930.041.141.140.335.500.35d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.50k, delay calibration 19.6319.609.8014.8014.8012.5218.3514.23d1, Uniform Delay [s] 668694359822824413617638c, Capacity [veh/h] 180118706141865187075415141618s, saturation flow rate [veh/h] 0.340.340.020.310.310.140.270.04(v / s)_i Volume / Saturation Flow Rate 0.370.370.530.440.440.530.350.35g / C, Green / Cycle 2424342929342323g_i, Effective Green Time [s] 2.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] CCLCCLCCLane Group Lane Group Calculations 10/13/202319 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-98 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.58 14.58 14.58 23.85 23.85 23.85 12.85 15.94 15.94 9.84 25.73 25.99 Movement LOS B B B C C C B B B A C C d_A, Approach Delay [s/veh]14.58 23.85 15.68 25.59 Approach LOS B C B C d_I, Intersection Delay [s/veh]20.93 Intersection LOS C Intersection V/C 0.716 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]24.13 24.13 24.13 24.13 I_p,int, Pedestrian LOS Score for Intersection 1.756 2.032 2.981 3.284 Crosswalk LOS A B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]677 677 738 738 d_b, Bicycle Delay [s]14.23 14.23 12.94 12.94 I_b,int, Bicycle LOS Score for Intersection 1.675 2.233 2.610 2.612 Bicycle LOS A B B B ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 10/13/202320 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-99 Attachment D Intersection Analysis Summary 10/13/2023Report File: G:\...\PMEAC.pdf Scenario 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Vistro File: G:\...\PME.vistro Dowey Foster Bridge Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. D38.60.795WB RightHCM 7th EditionSignalizedSuva St (NS) at Paramount Blvd (EW)4 D29.10.945SB ThruHCM 7th EditionAll-way stopSuva St (NS) at Guatemala Ave (EW)3 B12.80.488WB LeftHCM 7th EditionSignalizedSuva St (NS) at Bluff Rd (EW)2 B11.70.450NB LeftHCM 7th EditionAll-way stopSuva St (NS) at Scout Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 10/13/20231 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-100 Attachment D 0.450Volume to Capacity (v/c): BLevel Of Service: 11.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 1: Suva St (NS) at Scout Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 5631425392243618275114171Total Analysis Volume [veh/h] 116363236946212943Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96100.96100.96100.96100.96100.96100.96100.96100.96100.96100.96100.9610Peak Hour Factor 5611324388233517575110164Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000010020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5611324288233517375108163Base Volume Input [veh/h] Name Volumes 10/13/20232 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-101 Attachment D BIntersection LOS 11.68Intersection Delay [s/veh] ABBBApproach LOS 9.8811.1711.3813.06Approach Delay [s/veh] 5.986.2444.8518.7038.2958.2395th-Percentile Queue Length [ft] 0.240.251.790.751.532.3395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.070.080.380.200.340.45Degree of Utilization, x 553532662576653645Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/20233 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-102 Attachment D 0.488Volume to Capacity (v/c): BLevel Of Service: 12.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Suva St (NS) at Bluff Rd (EW) Intersection Level Of Service Report YesYesYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftLeft2RightThruLeftLeft2Right2RightThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/20234 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-103 Attachment D 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume along the le 000v_co, Outbound Pedestrian Volume along th 000v_di, Inbound Pedestrian Volume crossing th 000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 200034338317582650Total Analysis Volume [veh/h] 1000110821442660Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98800.98800.98800.98800.98800.98800.98800.98800.98800.98800.98800.9880Peak Hour Factor 200034288317382620Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000001000020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 200034258317282590Base Volume Input [veh/h] Name Volumes 10/13/20235 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-104 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.00.00.00.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.00.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010000100000100Pedestrian Clearance [s] 050005000050Walk [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Vehicle Extension [s] 020000210000210Split [s] 0.01.00.00.00.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Amber [s] 012000012000001200Maximum Green [s] 010000100000100Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 040006000020Signal Group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/20236 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-105 Attachment D 0.62124.49129.7295th-Percentile Queue Length [ft/ln] 0.024.985.1995th-Percentile Queue Length [veh/ln] 0.3469.1672.0750th-Percentile Queue Length [ft/ln] 0.012.772.8850th-Percentile Queue Length [veh/ln] NoNoYesCritical Lane Group BBBLane Group LOS 14.5212.3312.95d, Delay for Lane Group [s/veh] 0.010.640.69X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 0.010.991.35d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.110.110.11k, delay calibration 14.5111.3411.60d1, Uniform Delay [s] 266697646c, Capacity [veh/h] 141818631712s, saturation flow rate [veh/h] 0.000.240.26(v / s)_i Volume / Saturation Flow Rate 0.120.320.32g / C, Green / Cycle 41212g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 2.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 373737C, Cycle Length [s] CCCLane Group Lane Group Calculations 10/13/20237 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-106 Attachment D ABBBicycle LOS 1.5632.2842.010I_b,int, Bicycle LOS Score for Intersection 6.085.525.52d_b, Bicycle Delay [s] 858912912c_b, Capacity of the bicycle lane [bicycles/h] 200020002000s_b, Saturation Flow Rate of the bicycle lane AABCrosswalk LOS 1.6691.9602.201I_p,int, Pedestrian LOS Score for Intersection 10.7310.7310.73d_p, Pedestrian Delay [s] 0.000.000.00M_CW, Crosswalk Circulation Area [ft²/ped] 0.000.000.00M_corner, Corner Circulation Area [ft²/ped] 9.09.09.0g_Walk,mi, Effective Walk Time [s] Other Modes 0.488Intersection V/C BIntersection LOS 12.83d_I, Intersection Delay [s/veh] BBBApproach LOS 14.5212.3312.95d_A, Approach Delay [s/veh] BBBBBBBBBBBBMovement LOS 14.5214.5214.5214.5212.3312.3312.3312.3312.9512.9512.9512.95d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results 10/13/20238 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-107 Attachment D YesYesCrosswalk NoNoCurb Present 0.000.00Grade [%] 25.0025.00Speed [mph] 0.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 00000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 00000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] Right2RightThruLeftRight2RightThruLeftTurning Movement Lane Configuration SouthwestboundWestboundApproach Name Intersection Setup 10/13/20239 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-108 Attachment D 00Bicycle Volume [bicycles/h] 00v_ab, Corner Pedestrian Volume [ped/h] 00v_ci, Inbound Pedestrian Volume along the le 00v_co, Outbound Pedestrian Volume along th 00v_di, Inbound Pedestrian Volume crossing th 00v_do, Outbound Pedestrian Volume crossing 00000000Local Bus Stopping Rate [/h] 00000000On-Street Parking Maneuver Rate [/h] NoNoNoNoPresence of On-Street Parking 50202223051Total Analysis Volume [veh/h] 1051111013Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98800.98800.98800.98800.98800.98800.98800.9880Peak Hour Factor 50200223050Total Hourly Volume [veh/h] 00000000Right Turn on Red Volume [veh/h] 00000000Other Volume [veh/h] 00000000Existing Site Adjustment Volume [veh/h] 00000000Pass-by Trips [veh/h] 00000000Diverted Trips [veh/h] 00000000Site-Generated Trips [veh/h] 00000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 50199223050Base Volume Input [veh/h] Name Volumes 10/13/202310 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-109 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.0Detector Location [ft] NoNoPedestrian Recall NoNoMaximum Recall NoNoMinimum Recall 0.00.02.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.02.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoRest In Walk 0.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0010000100Pedestrian Clearance [s] 00500050Walk [s] 0.00.03.00.00.00.03.00.0Vehicle Extension [s] 0019000200Split [s] 0.00.01.00.00.00.01.00.0All red [s] 0.00.03.00.00.00.03.00.0Amber [s] 001200001200Maximum Green [s] 0010000100Minimum Green [s] --------Lead / Lag Auxiliary Signal Groups 001000080Signal Group PermissivePermissivePermissivePermissivePermissivePermissivePermissivePermissiveControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202311 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-110 Attachment D 59.7317.6695th-Percentile Queue Length [ft/ln] 2.390.7195th-Percentile Queue Length [veh/ln] 33.189.8150th-Percentile Queue Length [ft/ln] 1.330.3950th-Percentile Queue Length [veh/ln] YesYesCritical Lane Group BBLane Group LOS 13.0115.14d, Delay for Lane Group [s/veh] 0.470.15X, volume / capacity Lane Group Results 1.001.00PF, progression factor 1.001.00Rp, platoon ratio 0.000.00d3, Initial Queue Delay [s] 0.780.18d2, Incremental Delay [s] 1.001.00I, Upstream Filtering Factor 0.110.11k, delay calibration 12.2314.96d1, Uniform Delay [s] 443374c, Capacity [veh/h] 18611586s, saturation flow rate [veh/h] 0.110.04(v / s)_i Volume / Saturation Flow Rate 0.240.12g / C, Green / Cycle 94g_i, Effective Green Time [s] 2.002.00l2, Clearance Lost Time [s] 0.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.00L, Total Lost Time per Cycle [s] 3737C, Cycle Length [s] CCLane Group Lane Group Calculations 10/13/202312 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-111 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.14 15.14 15.14 15.14 13.01 13.01 13.01 13.01 Movement LOS B B B B B B B B d_A, Approach Delay [s/veh]15.14 13.01 Approach LOS B B d_I, Intersection Delay [s/veh]12.83 Intersection LOS B Intersection V/C 0.488 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 d_p, Pedestrian Delay [s]10.73 10.73 I_p,int, Pedestrian LOS Score for Intersection 1.781 1.773 Crosswalk LOS A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]858 805 d_b, Bicycle Delay [s]6.08 6.66 I_b,int, Bicycle LOS Score for Intersection 1.649 1.896 Bicycle LOS A A ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 -------------1042Ring 1 Sequence 10/13/202313 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-112 Attachment D 0.945Volume to Capacity (v/c): DLevel Of Service: 29.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 3: Suva St (NS) at Guatemala Ave (EW) Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 9326141336761334171361435214Total Analysis Volume [veh/h] 2374391933104344884Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.99000.99000.99000.99000.99000.99000.99000.99000.99000.99000.99000.9900Peak Hour Factor 9226141336751324131351434814Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000100010222Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9226141236751314101341234512Base Volume Input [veh/h] Name Volumes 10/13/202314 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-113 Attachment D DIntersection LOS 29.12Intersection Delay [s/veh] BBECApproach LOS 11.8512.4841.3118.61Approach Delay [s/veh] 24.0924.2318.13312.89110.4995th-Percentile Queue Length [ft] 0.960.970.7312.524.4295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.250.250.200.940.63Degree of Utilization, x 539504677586602Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/202315 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-114 Attachment D 0.795Volume to Capacity (v/c): DLevel Of Service: 38.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Suva St (NS) at Paramount Blvd (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00115.00100.00100.00225.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/202316 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-115 Attachment D 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1901330172511889916829216465Total Analysis Volume [veh/h] 47332462972542754121Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96500.96500.96500.96500.96500.96500.96500.96500.96500.96500.96500.9650Peak Hour Factor 1831283162411469616228208465Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 6152090002000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1761263142411329616128205465Base Volume Input [veh/h] Name Volumes 10/13/202317 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-116 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 07007001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 028110281102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 012012001201200120001200Maximum Green [s] 0107010701000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtPerPermissPermissProtPerPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202318 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-117 Attachment D 640.95619.104.12258.77259.9325.33258.676.8895th-Percentile Queue Length [ft/ln] 25.6424.760.1610.3510.401.0110.350.2895th-Percentile Queue Length [veh/ln] 435.19422.452.29156.27157.1414.07156.193.8250th-Percentile Queue Length [ft/ln] 17.4116.900.096.256.290.566.250.1550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoCritical Lane Group FFABBBCBLane Group LOS 65.7159.269.7416.0716.0513.2125.2814.31d, Delay for Lane Group [s/veh] 1.091.070.050.730.730.250.680.03X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 45.7039.250.051.261.250.336.130.08d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.50k, delay calibration 20.0120.019.6914.8114.8112.8719.1614.23d1, Uniform Delay [s] 688719362827833393605600c, Capacity [veh/h] 179018706071856187066715271541s, saturation flow rate [veh/h] 0.420.410.030.330.330.150.270.01(v / s)_i Volume / Saturation Flow Rate 0.390.390.540.450.450.540.340.34g / C, Green / Cycle 2525352929352222g_i, Effective Green Time [s] 2.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] CCLCCLCCLane Group Lane Group Calculations 10/13/202319 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-118 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.31 14.31 14.31 25.28 25.28 25.28 13.21 16.06 16.07 9.74 61.97 65.71 Movement LOS B B B C C C B B B A E E d_A, Approach Delay [s/veh]14.31 25.28 15.85 61.85 Approach LOS B C B E d_I, Intersection Delay [s/veh]38.61 Intersection LOS D Intersection V/C 0.795 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]24.13 24.13 24.13 24.13 I_p,int, Pedestrian LOS Score for Intersection 1.746 2.046 3.024 3.358 Crosswalk LOS A B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]677 677 738 738 d_b, Bicycle Delay [s]14.23 14.23 12.93 12.93 I_b,int, Bicycle LOS Score for Intersection 1.584 2.241 2.642 2.828 Bicycle LOS A B B C ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 10/13/202320 Scenario 2: 2 Existing Plus Ambient Growth Plus Cumulative PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-119 Attachment D EXISTING PLUS AMBIENT GROWTH PLUS CUMULATIVE PLUS PROJECT Apx-120 Attachment D Intersection Analysis Summary 10/13/2023Report File: G:\...\AMEACP.pdf Scenario 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Vistro File: G:\...\AME.vistro Dowey Foster Bridge Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B11.00.003EB LeftHCM 7th EditionTwo-way stopFoster Bridge Blvd (NS) at Project Dwy (EW)5 C21.00.720WB RightHCM 7th EditionSignalizedSuva St (NS) at Paramount Blvd (EW)4 C20.70.843SB ThruHCM 7th EditionAll-way stopSuva St (NS) at Guatemala Ave (EW)3 B16.10.641SWB ThruHCM 7th EditionSignalizedSuva St (NS) at Bluff Rd (EW)2 C17.40.640SB RightHCM 7th EditionAll-way stopSuva St (NS) at Scout Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 10/13/20231 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-121 Attachment D 0.640Volume to Capacity (v/c): CLevel Of Service: 17.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 1: Suva St (NS) at Scout Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 731041723183146157971041120201Total Analysis Volume [veh/h] 1826458213639242603050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.70100.70100.70100.70100.70100.70100.70100.70100.70100.70100.70100.7010Peak Hour Factor 517312162581021106873184141Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000100030013Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 517312160581021106573183137Base Volume Input [veh/h] Name Volumes 10/13/20232 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-122 Attachment D CIntersection LOS 17.38Intersection Delay [s/veh] BCCCApproach LOS 12.2615.5920.1819.89Approach Delay [s/veh] 18.0620.0051.8264.88113.13101.2495th-Percentile Queue Length [ft] 0.720.802.072.604.534.0595th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.200.210.420.480.640.61Degree of Utilization, x 494454549473559528Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/20233 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-123 Attachment D 0.641Volume to Capacity (v/c): BLevel Of Service: 16.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Suva St (NS) at Bluff Rd (EW) Intersection Level Of Service Report YesYesYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftLeft2RightThruLeftLeft2Right2RightThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/20234 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-124 Attachment D 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume along the le 000v_co, Outbound Pedestrian Volume along th 000v_di, Inbound Pedestrian Volume crossing th 000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 5031530813221562803Total Analysis Volume [veh/h] 1010177015514701Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.78300.78300.78300.78300.78300.78300.78300.78300.78300.78300.78300.7830Peak Hour Factor 4021424112173442192Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000003010200Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4021423711172422182Base Volume Input [veh/h] Name Volumes 10/13/20235 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-125 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.00.00.00.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.00.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010000100000100Pedestrian Clearance [s] 050005000050Walk [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Vehicle Extension [s] 019000490000490Split [s] 0.01.00.00.00.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Amber [s] 012000012000001200Maximum Green [s] 010000100000100Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 040006000020Signal Group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 115Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/20236 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-126 Attachment D 3.55102.82222.5795th-Percentile Queue Length [ft/ln] 0.144.118.9095th-Percentile Queue Length [veh/ln] 1.9757.12129.3250th-Percentile Queue Length [ft/ln] 0.082.285.1750th-Percentile Queue Length [veh/ln] NoNoYesCritical Lane Group BBBLane Group LOS 16.5811.7715.89d, Delay for Lane Group [s/veh] 0.020.410.78X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 0.020.351.83d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.110.110.11k, delay calibration 16.5511.4314.06d1, Uniform Delay [s] 410776722c, Capacity [veh/h] 169918631720s, saturation flow rate [veh/h] 0.010.170.33(v / s)_i Volume / Saturation Flow Rate 0.180.380.38g / C, Green / Cycle 91818g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 2.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 494949C, Cycle Length [s] CCCLane Group Lane Group Calculations 10/13/20237 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-127 Attachment D ABBBicycle LOS 1.5702.0812.119I_b,int, Bicycle LOS Score for Intersection 11.680.140.14d_b, Bicycle Delay [s] 61518461846c_b, Capacity of the bicycle lane [bicycles/h] 200020002000s_b, Saturation Flow Rate of the bicycle lane AABCrosswalk LOS 1.6951.9372.398I_p,int, Pedestrian LOS Score for Intersection 16.2016.2016.20d_p, Pedestrian Delay [s] 0.000.000.00M_CW, Crosswalk Circulation Area [ft²/ped] 0.000.000.00M_corner, Corner Circulation Area [ft²/ped] 9.09.09.0g_Walk,mi, Effective Walk Time [s] Other Modes 0.641Intersection V/C BIntersection LOS 16.10d_I, Intersection Delay [s/veh] BBBApproach LOS 16.5811.7715.89d_A, Approach Delay [s/veh] BBBBBBBBBBBBMovement LOS 16.5816.5816.5816.5811.7711.7711.7711.7715.8915.8915.8915.89d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results 10/13/20238 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-128 Attachment D YesYesCrosswalk NoNoCurb Present 0.000.00Grade [%] 25.0025.00Speed [mph] 0.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 00000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 00000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] Right2RightThruLeftRight2RightThruLeftTurning Movement Lane Configuration SouthwestboundWestboundApproach Name Intersection Setup 10/13/20239 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-129 Attachment D 00Bicycle Volume [bicycles/h] 00v_ab, Corner Pedestrian Volume [ped/h] 00v_ci, Inbound Pedestrian Volume along the le 00v_co, Outbound Pedestrian Volume along th 00v_di, Inbound Pedestrian Volume crossing th 00v_do, Outbound Pedestrian Volume crossing 00000000Local Bus Stopping Rate [/h] 00000000On-Street Parking Maneuver Rate [/h] NoNoNoNoPresence of On-Street Parking 902451530142Total Analysis Volume [veh/h] 2061011035Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.78300.78300.78300.78300.78300.78300.78300.7830Peak Hour Factor 701921420111Total Hourly Volume [veh/h] 00000000Right Turn on Red Volume [veh/h] 00000000Other Volume [veh/h] 00000000Existing Site Adjustment Volume [veh/h] 00000000Pass-by Trips [veh/h] 00000000Diverted Trips [veh/h] 40300000Site-Generated Trips [veh/h] 00000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 301881420111Base Volume Input [veh/h] Name Volumes 10/13/202310 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-130 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.0Detector Location [ft] NoNoPedestrian Recall NoNoMaximum Recall NoNoMinimum Recall 0.00.02.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.02.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoRest In Walk 0.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0010000100Pedestrian Clearance [s] 00500050Walk [s] 0.00.03.00.00.00.03.00.0Vehicle Extension [s] 0047000190Split [s] 0.00.01.00.00.00.01.00.0All red [s] 0.00.03.00.00.00.03.00.0Amber [s] 001200001200Maximum Green [s] 0010000100Minimum Green [s] --------Lead / Lag Auxiliary Signal Groups 001000080Signal Group PermissivePermissivePermissivePermissivePermissivePermissivePermissivePermissiveControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 115Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202311 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-131 Attachment D 119.5765.4595th-Percentile Queue Length [ft/ln] 4.782.6295th-Percentile Queue Length [veh/ln] 66.4336.3650th-Percentile Queue Length [ft/ln] 2.661.4550th-Percentile Queue Length [veh/ln] YesYesCritical Lane Group CBLane Group LOS 20.4818.58d, Delay for Lane Group [s/veh] 0.690.36X, volume / capacity Lane Group Results 1.001.00PF, progression factor 1.001.00Rp, platoon ratio 0.000.00d3, Initial Queue Delay [s] 2.310.53d2, Incremental Delay [s] 1.001.00I, Upstream Filtering Factor 0.110.11k, delay calibration 18.1718.05d1, Uniform Delay [s] 369414c, Capacity [veh/h] 18581511s, saturation flow rate [veh/h] 0.140.10(v / s)_i Volume / Saturation Flow Rate 0.200.18g / C, Green / Cycle 109g_i, Effective Green Time [s] 2.002.00l2, Clearance Lost Time [s] 0.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.00L, Total Lost Time per Cycle [s] 4949C, Cycle Length [s] CCLane Group Lane Group Calculations 10/13/202312 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-132 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]18.58 18.58 18.58 18.58 20.48 20.48 20.48 20.48 Movement LOS B B B B C C C C d_A, Approach Delay [s/veh]18.58 20.48 Approach LOS B C d_I, Intersection Delay [s/veh]16.10 Intersection LOS B Intersection V/C 0.641 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 d_p, Pedestrian Delay [s]16.20 16.20 I_p,int, Pedestrian LOS Score for Intersection 1.841 1.826 Crosswalk LOS A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]615 1764 d_b, Bicycle Delay [s]11.68 0.34 I_b,int, Bicycle LOS Score for Intersection 1.799 1.966 Bicycle LOS A A ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 -------------1042Ring 1 Sequence 10/13/202313 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-133 Attachment D 0.843Volume to Capacity (v/c): CLevel Of Service: 20.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 3: Suva St (NS) at Guatemala Ave (EW) Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 1482471932126185367115523314Total Analysis Volume [veh/h] 376258324692291584Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.84000.84000.84000.84000.84000.84000.84000.84000.84000.84000.84000.8400Peak Hour Factor 124206162710615530897419612Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 002300060020Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 124204132710615430197419312Base Volume Input [veh/h] Name Volumes 10/13/202314 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-134 Attachment D CIntersection LOS 20.69Intersection Delay [s/veh] BBDBApproach LOS 12.1513.2627.4314.14Approach Delay [s/veh] 33.3336.7628.74224.1255.8895th-Percentile Queue Length [ft] 1.331.471.158.962.2495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.310.340.280.840.44Degree of Utilization, x 571526658572572Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/202315 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-135 Attachment D 0.720Volume to Capacity (v/c): CLevel Of Service: 21.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Suva St (NS) at Paramount Blvd (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00115.00100.00100.00225.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/202316 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-136 Attachment D 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 1351129139115710817225215371716Total Analysis Volume [veh/h] 34282322892743654944Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98500.98500.98500.98500.98500.98500.98500.98500.98500.98500.98500.9850Peak Hour Factor 1331112139114010616925212361716Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 18001511011200Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1311100139112110516725200341716Base Volume Input [veh/h] Name Volumes 10/13/202317 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-137 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 07007001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 028110281102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 012012001201200120001200Maximum Green [s] 0107010701000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtPerPermissPermissProtPerPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202318 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-138 Attachment D 341.01347.743.26249.45249.8928.75252.0332.5495th-Percentile Queue Length [ft/ln] 13.6413.910.139.9810.001.1510.081.3095th-Percentile Queue Length [veh/ln] 219.52224.791.81149.27149.6015.97151.2018.0850th-Percentile Queue Length [ft/ln] 8.788.990.075.975.980.646.050.7250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoCritical Lane Group CCABBBCBLane Group LOS 26.0325.579.8315.9215.9112.8524.1114.60d, Delay for Lane Group [s/veh] 0.930.930.040.710.710.260.670.11X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 6.395.970.041.141.130.335.670.35d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.50k, delay calibration 19.6419.609.7914.7814.7812.5218.4414.25d1, Uniform Delay [s] 668694359822824413616637c, Capacity [veh/h] 180118706141865187075415131618s, saturation flow rate [veh/h] 0.340.340.020.310.310.140.270.04(v / s)_i Volume / Saturation Flow Rate 0.370.370.530.440.440.530.350.35g / C, Green / Cycle 2424342929342323g_i, Effective Green Time [s] 2.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] CCLCCLCCLane Group Lane Group Calculations 10/13/202319 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-139 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.60 14.60 14.60 24.11 24.11 24.11 12.85 15.91 15.92 9.83 25.77 26.03 Movement LOS B B B C C C B B B A C C d_A, Approach Delay [s/veh]14.60 24.11 15.65 25.63 Approach LOS B C B C d_I, Intersection Delay [s/veh]20.98 Intersection LOS C Intersection V/C 0.720 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]24.13 24.13 24.13 24.13 I_p,int, Pedestrian LOS Score for Intersection 1.756 2.035 2.981 3.289 Crosswalk LOS A B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]677 677 738 738 d_b, Bicycle Delay [s]14.23 14.23 12.94 12.94 I_b,int, Bicycle LOS Score for Intersection 1.675 2.239 2.611 2.613 Bicycle LOS A B B B ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 10/13/202320 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-140 Attachment D 0.003Volume to Capacity (v/c): BLevel Of Service: 11.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 5: Foster Bridge Blvd (NS) at Project Dwy (EW) Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 7212001883Total Analysis Volume [veh/h] 21050471Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 7211901793Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 721003Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0001891780Base Volume Input [veh/h] Name Volumes 10/13/202321 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-141 Attachment D BIntersection LOS 0.27d_I, Intersection Delay [s/veh] AAAApproach LOS 9.700.000.12d_A, Approach Delay [s/veh] 0.880.880.000.000.130.1395th-Percentile Queue Length [ft/ln] 0.040.040.000.000.010.0195th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.3410.970.000.000.007.63d_M, Delay for Movement [s/veh] 0.010.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 10/13/202322 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project AM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-142 Attachment D Intersection Analysis Summary 10/13/2023Report File: G:\...\PMEACP.pdf Scenario 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Vistro File: G:\...\PME.vistro Dowey Foster Bridge Residential V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B11.30.002EB LeftHCM 7th EditionTwo-way stopFoster Bridge Blvd (NS) at Project Dwy (EW)5 D39.70.799WB RightHCM 7th EditionSignalizedSuva St (NS) at Paramount Blvd (EW)4 D29.60.948SB ThruHCM 7th EditionAll-way stopSuva St (NS) at Guatemala Ave (EW)3 B12.90.494WB LeftHCM 7th EditionSignalizedSuva St (NS) at Bluff Rd (EW)2 B11.80.454NB LeftHCM 7th EditionAll-way stopSuva St (NS) at Scout Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 10/13/20231 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-143 Attachment D 0.454Volume to Capacity (v/c): BLevel Of Service: 11.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 1: Suva St (NS) at Scout Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 5631425692243618375114173Total Analysis Volume [veh/h] 116364236946212943Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96100.96100.96100.96100.96100.96100.96100.96100.96100.96100.96100.9610Peak Hour Factor 5611324688233517675110166Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000300020022Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5611324288233517375108163Base Volume Input [veh/h] Name Volumes 10/13/20232 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-144 Attachment D BIntersection LOS 11.75Intersection Delay [s/veh] ABBBApproach LOS 9.9111.2511.4313.16Approach Delay [s/veh] 6.006.2645.8318.7438.7059.1495th-Percentile Queue Length [ft] 0.240.251.830.751.552.3795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.070.080.390.200.350.45Degree of Utilization, x 551530660574652643Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/20233 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-145 Attachment D 0.494Volume to Capacity (v/c): BLevel Of Service: 12.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 2: Suva St (NS) at Bluff Rd (EW) Intersection Level Of Service Report YesYesYesCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftLeft2RightThruLeftLeft2Right2RightThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/20234 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-146 Attachment D 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume along the le 000v_co, Outbound Pedestrian Volume along th 000v_di, Inbound Pedestrian Volume crossing th 000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 2000343387175142650Total Analysis Volume [veh/h] 1000110822444660Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98800.98800.98800.98800.98800.98800.98800.98800.98800.98800.98800.9880Peak Hour Factor 2000342887173142620Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000001040620Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 200034258317282590Base Volume Input [veh/h] Name Volumes 10/13/20235 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-147 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.00.00.00.02.00.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.00.00.00.02.00.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 010000100000100Pedestrian Clearance [s] 050005000050Walk [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Vehicle Extension [s] 022000190000190Split [s] 0.01.00.00.00.01.00.00.00.00.01.00.0All red [s] 0.03.00.00.00.03.00.00.00.00.03.00.0Amber [s] 012000012000001200Maximum Green [s] 010000100000100Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 040006000020Signal Group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/20236 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-148 Attachment D 0.63126.48132.7995th-Percentile Queue Length [ft/ln] 0.035.065.3195th-Percentile Queue Length [veh/ln] 0.3570.2673.7750th-Percentile Queue Length [ft/ln] 0.012.812.9550th-Percentile Queue Length [veh/ln] NoNoYesCritical Lane Group BBBLane Group LOS 14.6612.3313.00d, Delay for Lane Group [s/veh] 0.010.640.70X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 0.010.981.37d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.110.110.11k, delay calibration 14.6411.3411.64d1, Uniform Delay [s] 266703651c, Capacity [veh/h] 142618611710s, saturation flow rate [veh/h] 0.000.240.27(v / s)_i Volume / Saturation Flow Rate 0.120.320.32g / C, Green / Cycle 41212g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 2.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 383838C, Cycle Length [s] CCCLane Group Lane Group Calculations 10/13/20237 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-149 Attachment D ABBBicycle LOS 1.5632.2912.020I_b,int, Bicycle LOS Score for Intersection 5.116.796.79d_b, Bicycle Delay [s] 957798798c_b, Capacity of the bicycle lane [bicycles/h] 200020002000s_b, Saturation Flow Rate of the bicycle lane AABCrosswalk LOS 1.6701.9632.205I_p,int, Pedestrian LOS Score for Intersection 10.8810.8810.88d_p, Pedestrian Delay [s] 0.000.000.00M_CW, Crosswalk Circulation Area [ft²/ped] 0.000.000.00M_corner, Corner Circulation Area [ft²/ped] 9.09.09.0g_Walk,mi, Effective Walk Time [s] Other Modes 0.494Intersection V/C BIntersection LOS 12.89d_I, Intersection Delay [s/veh] BBBApproach LOS 14.6612.3313.00d_A, Approach Delay [s/veh] BBBBBBBBBBBBMovement LOS 14.6614.6614.6614.6612.3312.3312.3312.3313.0013.0013.0013.00d_M, Delay for Movement [s/veh] Movement, Approach, & Intersection Results 10/13/20238 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-150 Attachment D YesYesCrosswalk NoNoCurb Present 0.000.00Grade [%] 25.0025.00Speed [mph] 0.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 00000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 00000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] Right2RightThruLeftRight2RightThruLeftTurning Movement Lane Configuration SouthwestboundWestboundApproach Name Intersection Setup 10/13/20239 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-151 Attachment D 00Bicycle Volume [bicycles/h] 00v_ab, Corner Pedestrian Volume [ped/h] 00v_ci, Inbound Pedestrian Volume along the le 00v_co, Outbound Pedestrian Volume along th 00v_di, Inbound Pedestrian Volume crossing th 00v_do, Outbound Pedestrian Volume crossing 00000000Local Bus Stopping Rate [/h] 00000000On-Street Parking Maneuver Rate [/h] NoNoNoNoPresence of On-Street Parking 70203223051Total Analysis Volume [veh/h] 2051111013Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.98800.98800.98800.98800.98800.98800.98800.9880Peak Hour Factor 70201223050Total Hourly Volume [veh/h] 00000000Right Turn on Red Volume [veh/h] 00000000Other Volume [veh/h] 00000000Existing Site Adjustment Volume [veh/h] 00000000Pass-by Trips [veh/h] 00000000Diverted Trips [veh/h] 20100000Site-Generated Trips [veh/h] 00000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 50199223050Base Volume Input [veh/h] Name Volumes 10/13/202310 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-152 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.0Detector Location [ft] NoNoPedestrian Recall NoNoMaximum Recall NoNoMinimum Recall 0.00.02.00.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.02.00.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoRest In Walk 0.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0010000100Pedestrian Clearance [s] 00500050Walk [s] 0.00.03.00.00.00.03.00.0Vehicle Extension [s] 0019000220Split [s] 0.00.01.00.00.00.01.00.0All red [s] 0.00.03.00.00.00.03.00.0Amber [s] 001200001200Maximum Green [s] 0010000100Minimum Green [s] --------Lead / Lag Auxiliary Signal Groups 001000080Signal Group PermissivePermissivePermissivePermissivePermissivePermissivePermissivePermissiveControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 60Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202311 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-153 Attachment D 61.5717.8895th-Percentile Queue Length [ft/ln] 2.460.7295th-Percentile Queue Length [veh/ln] 34.219.9350th-Percentile Queue Length [ft/ln] 1.370.4050th-Percentile Queue Length [veh/ln] YesYesCritical Lane Group BBLane Group LOS 13.1915.28d, Delay for Lane Group [s/veh] 0.480.15X, volume / capacity Lane Group Results 1.001.00PF, progression factor 1.001.00Rp, platoon ratio 0.000.00d3, Initial Queue Delay [s] 0.810.19d2, Incremental Delay [s] 1.001.00I, Upstream Filtering Factor 0.110.11k, delay calibration 12.3815.09d1, Uniform Delay [s] 442372c, Capacity [veh/h] 18581585s, saturation flow rate [veh/h] 0.110.04(v / s)_i Volume / Saturation Flow Rate 0.240.12g / C, Green / Cycle 94g_i, Effective Green Time [s] 2.002.00l2, Clearance Lost Time [s] 0.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.00L, Total Lost Time per Cycle [s] 3838C, Cycle Length [s] CCLane Group Lane Group Calculations 10/13/202312 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-154 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]15.28 15.28 15.28 15.28 13.19 13.19 13.19 13.19 Movement LOS B B B B B B B B d_A, Approach Delay [s/veh]15.28 13.19 Approach LOS B B d_I, Intersection Delay [s/veh]12.89 Intersection LOS B Intersection V/C 0.494 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 d_p, Pedestrian Delay [s]10.88 10.88 I_p,int, Pedestrian LOS Score for Intersection 1.787 1.785 Crosswalk LOS A A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]957 798 d_b, Bicycle Delay [s]5.11 6.79 I_b,int, Bicycle LOS Score for Intersection 1.649 1.898 Bicycle LOS A A ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 -------------1042Ring 1 Sequence 10/13/202313 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-155 Attachment D 0.948Volume to Capacity (v/c): DLevel Of Service: 29.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: All-way stopControl Type: Intersection 3: Suva St (NS) at Guatemala Ave (EW) Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 25.0025.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000100000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 9326141336761334181361435814Total Analysis Volume [veh/h] 2374391933105344894Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.99000.99000.99000.99000.99000.99000.99000.99000.99000.99000.99000.9900Peak Hour Factor 9226141336751324141351435414Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000100020282Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9226141236751314101341234512Base Volume Input [veh/h] Name Volumes 10/13/202314 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-156 Attachment D DIntersection LOS 29.56Intersection Delay [s/veh] BBECApproach LOS 11.8912.5241.9919.05Approach Delay [s/veh] 24.2124.3418.19316.30114.6595th-Percentile Queue Length [ft] 0.970.970.7312.654.5995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.250.250.200.950.64Degree of Utilization, x 537502675584602Capacity per Entry Lane [veh/h] Lanes Intersection Settings 10/13/202315 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-157 Attachment D 0.799Volume to Capacity (v/c): DLevel Of Service: 39.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: SignalizedControl Type: Intersection 4: Suva St (NS) at Paramount Blvd (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 40.0040.0025.0025.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00115.00100.00100.00225.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 001001000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 10/13/202316 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-158 Attachment D 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 19313301725118810316929218465Total Analysis Volume [veh/h] 48332462972642754121Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.96500.96500.96500.96500.96500.96500.96500.96500.96500.96500.96500.9650Peak Hour Factor 1861283162411469916328210465Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 9152093104000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.00401.0040Growth Factor 0.00Proportion of CAVs [%] 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1761263142411329616128205465Base Volume Input [veh/h] Name Volumes 10/13/202317 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-159 Attachment D 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.02.00.02.02.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.02.02.00.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 07007001700170Pedestrian Clearance [s] 050050050050Walk [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 028110281102600260Split [s] 0.01.01.00.01.01.00.01.00.00.01.00.0All red [s] 0.03.03.00.03.03.00.03.00.00.03.00.0Amber [s] 012012001201200120001200Maximum Green [s] 0107010701000100Minimum Green [s] --Lead--Lead------Lead / Lag Auxiliary Signal Groups 047083020060Signal Group PermissPermissProtPerPermissPermissProtPerPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 6.00Lost time [s] SingleBandPermissive Mode Lead Green - Beginning of First GreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 65Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 10/13/202318 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-160 Attachment D 656.44633.784.12258.76259.9126.42261.166.8895th-Percentile Queue Length [ft/ln] 26.2625.350.1610.3510.401.0610.450.2895th-Percentile Queue Length [veh/ln] 445.62432.442.29156.26157.1214.68158.063.8250th-Percentile Queue Length [ft/ln] 17.8217.300.096.256.280.596.320.1550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoCritical Lane Group FFABBBCBLane Group LOS 68.2461.539.7416.0716.0513.2125.4714.31d, Delay for Lane Group [s/veh] 1.091.080.050.730.730.260.690.03X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 48.1941.480.051.261.250.356.260.08d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.110.500.50k, delay calibration 20.0520.059.6914.8114.8012.8619.2114.24d1, Uniform Delay [s] 686717362828834395605599c, Capacity [veh/h] 178918706071856187066915271541s, saturation flow rate [veh/h] 0.420.410.030.330.330.150.270.01(v / s)_i Volume / Saturation Flow Rate 0.380.380.540.450.450.540.340.34g / C, Green / Cycle 2525352929352222g_i, Effective Green Time [s] 2.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.002.002.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 6565656565656565C, Cycle Length [s] CCLCCLCCLane Group Lane Group Calculations 10/13/202319 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-161 Attachment D Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]14.31 14.31 14.31 25.47 25.47 25.47 13.21 16.06 16.07 9.74 64.34 68.24 Movement LOS B B B C C C B B B A E E d_A, Approach Delay [s/veh]14.31 25.47 15.84 64.23 Approach LOS B C B E d_I, Intersection Delay [s/veh]39.72 Intersection LOS D Intersection V/C 0.799 Other Modes g_Walk,mi, Effective Walk Time [s]9.0 9.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]24.13 24.13 24.13 24.13 I_p,int, Pedestrian LOS Score for Intersection 1.746 2.052 3.025 3.362 Crosswalk LOS A B C C s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]677 677 738 738 d_b, Bicycle Delay [s]14.23 14.23 12.93 12.93 I_b,int, Bicycle LOS Score for Intersection 1.584 2.246 2.645 2.830 Bicycle LOS A B B C ----------------Ring 4 ----------------Ring 3 ------------876-Ring 2 ------------432-Ring 1 Sequence 10/13/202320 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-162 Attachment D 0.002Volume to Capacity (v/c): BLevel Of Service: 11.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 5: Foster Bridge Blvd (NS) at Project Dwy (EW) Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 25.0025.0025.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 31221819811Total Analysis Volume [veh/h] 10154493Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.95000.95000.95000.95000.95000.9500Peak Hour Factor 31220718810Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 3120010Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00401.00401.00401.00401.00401.0040Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0002061870Base Volume Input [veh/h] Name Volumes 10/13/202321 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-163 Attachment D BIntersection LOS 0.29d_I, Intersection Delay [s/veh] AAAApproach LOS 9.900.000.40d_A, Approach Delay [s/veh] 0.410.410.000.000.460.4695th-Percentile Queue Length [ft/ln] 0.020.020.000.000.020.0295th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.4111.340.000.000.007.68d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 10/13/202322 Scenario 4: 4 Existing Plus Ambient Growth Plus Cumulative Plus Project PM Peak Hour Dowey Foster Bridge Residential Version 2022 (SP 0-8) Generated with Apx-164 Attachment D APPENDIX E TRAFFIC SIGNAL WARRANT GRAPHS Apx-165 Attachment D California Manual of Uniform Traffic Control Devlces WARRANT 3, PEAK HOUR (Urban Areas) Traffic Conditions =Existing - AM Peak Hour Major Street Name =Suva Street Total of Both Approaches (VPH) =761 Number of Approach Lanes on Major Street =1 Minor Street Name =Guatemala Avenue High Volume Approach (VPH) =148 Number of Approach Lanes On Minor Street =1 SIGNAL WARRANT NOT SATISFIED * Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. Minor Street - Higher-Volume Approach - VPH761148 0 100 200 300 400 500 600 700 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Major Street - Total of Both Approaches - Vehicles Per Hour (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches *150 *100 Urban - E AM.xls Sect. 4C.06 Apx-166 Attachment D California Manual of Uniform Traffic Control Devlces WARRANT 3, PEAK HOUR (Urban Areas) Traffic Conditions =Existing - PM Peak Hour Major Street Name =Suva Street Total of Both Approaches (VPH) =1044 Number of Approach Lanes on Major Street =1 Minor Street Name =Guatemala Avenue High Volume Approach (VPH) =132 Number of Approach Lanes On Minor Street =1 SIGNAL WARRANT NOT SATISFIED * Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. Minor Street - Higher-Volume Approach - VPH1044132 0 100 200 300 400 500 600 700 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Major Street - Total of Both Approaches - Vehicles Per Hour (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches *150 *100 JN19658_Signal Warrant 3 - Urban.xls Sect. 4C.06 Apx-167 Attachment D California Manual of Uniform Traffic Control Devlces WARRANT 3, PEAK HOUR (Urban Areas) Traffic Conditions =Existing Plus Ambient Growth Plus Cumualtive - AM Peak Hour Major Street Name =Suva Street Total of Both Approaches (VPH) =767 Number of Approach Lanes on Major Street =1 Minor Street Name =Guatemala Avenue High Volume Approach (VPH) =150 Number of Approach Lanes On Minor Street =1 SIGNAL WARRANT NOT SATISFIED * Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. Minor Street - Higher-Volume Approach - VPH767150 0 100 200 300 400 500 600 700 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Major Street - Total of Both Approaches - Vehicles Per Hour (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches *150 *100 Urban - EAC AM.xls Sect. 4C.06 Apx-168 Attachment D California Manual of Uniform Traffic Control Devlces WARRANT 3, PEAK HOUR (Urban Areas) Traffic Conditions =Existing Plus Ambient Growth Plus Cumualtive - PM Peak Hour Major Street Name =Suva Street Total of Both Approaches (VPH) =1056 Number of Approach Lanes on Major Street =1 Minor Street Name =Guatemala Avenue High Volume Approach (VPH) =132 Number of Approach Lanes On Minor Street =1 SIGNAL WARRANT NOT SATISFIED * Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. Minor Street - Higher-Volume Approach - VPH1056132 0 100 200 300 400 500 600 700 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Major Street - Total of Both Approaches - Vehicles Per Hour (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches *150 *100 Urban - EAC PM.xls Sect. 4C.06 Apx-169 Attachment D California Manual of Uniform Traffic Control Devlces WARRANT 3, PEAK HOUR (Urban Areas) Traffic Conditions =Existing Plus Ambient Growth Plus Cumualtive Plus Project - AM Peak Hour Major Street Name =Suva Street Total of Both Approaches (VPH) =772 Number of Approach Lanes on Major Street =1 Minor Street Name =Guatemala Avenue High Volume Approach (VPH) =150 Number of Approach Lanes On Minor Street =1 SIGNAL WARRANT NOT SATISFIED * Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. Minor Street - Higher-Volume Approach - VPH772150 0 100 200 300 400 500 600 700 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Major Street - Total of Both Approaches - Vehicles Per Hour (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches *150 *100 Urban - EACP AM.xls Sect. 4C.06 Apx-170 Attachment D California Manual of Uniform Traffic Control Devlces WARRANT 3, PEAK HOUR (Urban Areas) Traffic Conditions =Existing Plus Ambient Growth Plus Cumualtive Plus Project - PM Peak Hour Major Street Name =Suva Street Total of Both Approaches (VPH) =1063 Number of Approach Lanes on Major Street =1 Minor Street Name =Guatemala Avenue High Volume Approach (VPH) =132 Number of Approach Lanes On Minor Street =1 SIGNAL WARRANT NOT SATISFIED * Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. Minor Street - Higher-Volume Approach - VPH1063132 0 100 200 300 400 500 600 700 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 Major Street - Total of Both Approaches - Vehicles Per Hour (VPH) 1 Lane (Major) & 1 Lane (Minor) 2+ Lanes (Major) & 1 Lane (Minor) OR 1 Lane (Major) & 2+ Lanes (Minor) 2+ Lanes (Major) & 2+ Lanes (Minor) Major Street Approaches Minor Street Approaches *150 *100 Urban - EACP PM.xls Sect. 4C.06 Apx-171 Attachment D GANDDINI GROUP INC. 714.795.3100 | ganddini.com Attachment D