Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2. PLN-23-00039
STAFF REPORT PLANNING DIVISION DATE: FEBRUARY 21, 2024 TO: PLANNING COMMISSION SUBMITTED/ REVIEWED BY: IRMA HUITRON, DIRECTOR OF COMMUNITY DEVELOPMENT PREPARED BY: JERRY CLEMENTE, ASSOCIATE PLANNER SUBJECT: PLN-23-00039 (CONDITIONAL USE PERMIT) – A REQUEST TO CONSTRUCT A NEW ROOF MOUNTED WIRELESS COMMUNICATION FACILITY ON AN EXISTING 40’ (FOOT) 5” (INCH) THREE STORY MEDICAL OFFICE BUILDING. LOCATION: 8327 DAVIS STREET ZONING: H-M (HOSPITAL-MEDICAL) GENERAL PLAN DESIGNATION: O (OFFICE USE) REPORT SUMMARY The proposed Conditional Use Permit (PLN-23-00039) is a request for AT&T to construct and operate a new wireless communications facility on top of an existing 40’(foot) 5” (inches) three story medical office building. The permit is filed in conjunction with a separate roof mounted Verizon wireless communications facility on the same building. Each company will for the majority occupy opposite ends of the building. Specific to this application, the AT&T facility will be primarily located at the West end of the building’s rooftop. Both facilities will be enclosed with one uniform new decorative roof screening with black tinted spandrel glass. The screen will expand the length of the building. Behind the FRP screening will be essential components of new wireless equipment such as antennas, RRUS, surge suppressors, and equipment cabinets. All screening and equipment will be painted and textured to match the existing building detail and color. Based on the analysis contained in this report, staff is recommending the Planning Commission adopt the following titled resolution: A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A CONDITIONAL USE PERMIT (PLN-23-00039), THEREBY ALLOWING THE CONSTRUCTION OF A NEW ROOF MOUNTED WIRELESS COMMUNICATIONS FACILITY CONSISTING OF SIXTEEN (16) ANTENNAS, FORTY-EIGHT (48) REMOTE RADIO UNITS, NINE (9) SURGE SUPPRESSORS AND EQUIPMENT CABINETS WITH A NEW 10’ (FOOT) 6” PC AGENDA PAGE 1 8327 Davis Street – PLN-23-00039 February 21, 2024 - Page 2 (INCH) ROOF SCREENING ON AN EXISTING 40’ (FOOT) 5” (INCH) THREE STORY BUILDING ON A PROPERTY LOCATED AT 8327 DAVIS STREET, ZONED HOSPITAL-MEDICAL (H-M). REQUEST On March 20, 2023, applicant Jeremy Siegel AT&T representative, filed an application for a Conditional Use Permit (CUP) on behalf of AT&T for a new rooftop wireless communication facility on an existing three story building. The proposal of the new equipment would boost the wireless coverage to both the local and surrounding area. In accordance with Downey Municipal Code (DMC) Section 9426, any new wireless communication facility requires approval by the Planning Commission. BACKGROUND The subject property, centrally located within the City, is zoned Hospital-Medical Arts (H-M) with a General Plan land use designation of Office (O). More specifically, the property is situated at the northern corner of the Dolan Avenue and Davis Street intersection. The subject site is a 13,280 square foot parcel developed in 1987 with a three story 7,692 square foot building. The building’s first floor is used as tucked under parking, and the remaining two floors above are used for medical offices. The overall building height is 40’ 5”. Surrounding properties to the north, west, and east are also zoned Hospital-Medical Arts (H-M), and developed with medical related uses. Properties to the south are zoned as Multiple-Residential (R-3), and developed with single-family homes. Existing Site Conditions DISCUSSION In accordance with the Downey Municipal Code, regulations governing Wireless Communication Facilities aim to establish criteria for placement, design, and screening to ensure the responsible establishment of such wireless communication facilities. This effort is geared towards protecting public health, safety, general welfare, and the overall quality of life within the city, while simultaneously allowing for essential flexibility for wireless communication providers. Moreover, these regulations strive to maintain the visual harmony of the community by promoting the use of stealth techniques that seamlessly integrate or conceal cellular facilities within their surroundings. PC AGENDA PAGE 2 8327 Davis Street – PLN-23-00039 February 21, 2024 - Page 3 Wireless Communication Facilities owned by individual wireless carriers, such as Verizon Wireless, AT&T, Sprint, etc., are necessary to provide cellular service to their customers. As cellular technology advances, the demand for bandwidth increases, prompting updates to existing wireless facilities for better coverage, and the addition of new antennas to expand coverage areas. As previously mentioned, this application is processed in conjunction with a separate Wireless Communications Facility with the majority of each facility to be located on either side of the building’s roof top. Specific to this proposal, the AT&T facility is primarily located on the West end of the rooftop with one segment of antennas located along the eastern edge of the building. AT&T is proposing the installation of sixteen (16) antennas, forty-eight (48) remote radio units (RRUs), twelve (9) surge suppressors, and a new equipment platform. These elements will be dispersed into four sections and mounted on a steel platform. The new equipment will occupy a space, or leasing area, of 120 square feet (10’ width x 12’ length) to house a battery for powering and regulating the unmanned antennas. The size of the antenna panel is eight feet (8’) in height. Each antenna panel will have 3 sets of remote radio units, thirty-one inches (31”) in height, attached to its rear for a total of 48 RRU’s. The proposed panel antennas and the remote radio units will be all mounted on a support framed and screened behind the proposed 10’-5” roof screening. All antennas’ placements will mount at a distance of 1’-9” away from the parapet. PC AGENDA PAGE 3 8327 Davis Street – PLN-23-00039 February 21, 2024 - Page 4 Design In order to maintain the building’s visual aesthetics roof screening is proposed that incorporates the existing elements, texture and color of the building. This ensures maximum concealment and visually integrates the wireless equipment and antennas. The applicant’s final proposal displays a parapet that will mimic the effect of an additional floor by utilizing black spandrel glass for faux windows. The look provides a visually consistent and unified appearance using black tinted windows identical in appearance to the windows of the stories below. This design maintains the aesthetic appeal of the building, reducing visual clutter, and preserving the overall appearance of the area. Additionally, the roof screening will wrap around the south, west and east portion of the building as seen in the simulation below. The north section of the building is 146’ ft in length, with only twenty-seven (27) linear feet of roof screening to be provided. This means that on the Northern section of the building, the mid-section, will not be screened, to provide fire ladder access for the fire department in the event of an emergency. Therefore, each side of the north building will have a roof screening that bends towards in the interior section of the roof to cover the remaining wireless equipment as seen below. Northern section of the roof screening off Dolan Avenue Furthermore, concealing mechanical and communications equipment from public view will ensure that the visual integrity of the building structure remains intact. Roof screening, in addition to aesthetics, also protects mechanical components from damage. The height of the Existing Proposed PC AGENDA PAGE 4 8327 Davis Street – PLN-23-00039 February 21, 2024 - Page 5 existing building stands at 40’5” from grade to rooftop. A proposed roof screening to conceal the wireless equipment will incorporate a 10’5” high parapet extending the building height to 50’10”. The maximum height permitted in the zoning designation of Hospital- Medical (H-M) stands at 75-feet or 5 stories whichever is less. Network Coverage AT&T has identified a need for additional coverage and a lack of capacity in this area, as can be seen in the propagation map below. The lack of coverage may be a result of advancing cellular technology and demand for bandwidth, this in turn may lead to dips in service and speed due to a high use. Thus, carriers choose to compensate with additional facilities or if possible upgrade existing facilities. AT&T determines that nearby existing facilities cannot be upgraded to meet the coverage gap. Propagation Map without proposed modifications The center of the map above shows the location of the proposed wireless communications facility. As can be seen, the service provided by the center cell site is less potent than others located throughout the city prompting a gap in coverage. The construction of the proposed wireless communications facility is intended to provide additional coverage. Below is the new coverage area with the proposed modification. The circle outlined in both coverage maps is not intended to depict the coverage area, rather it is provided for readability. PC AGENDA PAGE 5 8327 Davis Street – PLN-23-00039 February 21, 2024 - Page 6 Propagation Map with proposed modifications ENVIRONMENTAL ANALYSIS Staff has reviewed the proposed conditional use permit for a new wireless communication facility for compliance with the California Environmental Quality Act (CEQA). Upon completion of this review, it has been determined that this request is categorically exempt from CEQA, pursuant to Guideline Section No. 15303 (Class 3 – New Construction or Conversion of Small Structures. Categorical Exemptions are projects, which have been determined not to have a significant effect on the environment and have been exempted from the requirements of the California Environmental Quality Act. Class 3 exemptions consist of installation of small new equipment and facilities in small structures. DEVELOPMENT REVIEW COMMITTEE The project was reviewed by the Development Review Committee (DRC) which is composed of Building & Safety Division, Fire Department, Public Works Department, and the Planning Division. Standard comments are provided, and can be reviewed in the attached resolution. The fire department did initially express concerns regarding the design of the roof screening, primarily due to the heightened parapet's potential obstruction for roof ladder access. Additionally, the presence of electrical wires along Davis and Dolan presented a safety hazard for fire department personnel. Consequently, it was determined that the northern section of the building would remain unobstructed and free of roof screening to facilitate fire roof access along Dolan Avenue. Coordination between Planning Staff, Fire Staff, and the applicant resulted in the final design. PC AGENDA PAGE 6 8327 Davis Street – PLN-23-00039 February 21, 2024 - Page 7 PUBLIC NOTICE On February 8, 2024, a notice of the public hearing was mailed to all property owners within 500-feet of the subject property and advertised in the Downey Patriot. PUBLIC COMMENTS As of the date of the publishing of this report, staff has not received any correspondence regarding this application. CONCLUSION Based on the analysis contained within this report, staff is concluding that all required findings can be made in a positive manner. As such, staff recommends that the Planning Commission approve the application (PLN-23-00039) for a new wireless communication facility. EXHIBITS A.Maps B.Draft Resolution C.Propagation Maps D.Photo Simulations E.Project Plans PC AGENDA PAGE 7 STAFF REPORT PLANNING DIVISION Exhibit ‘A’ – Maps AERIAL PHOTOGRAPH LOCATION MAP Subject Site PC AGENDA PAGE 8 ZONING MAP Subject Site PC AGENDA PAGE 9 Resolution No. 24-4020 Downey Planning Commission 8327 Davis Street – PLN-23-00039 February 21, 2024 – Page 1 RESOLUTION NO. 24-4020 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A CONDITIONAL USE PERMIT (PLN-23-00039), THEREBY ALLOWING THE CONSTRUCTION OF A NEW ROOF MOUNTED WIRELESS COMMUNICATIONS FACILITY CONSISTING OF SIXTEEN (16) ANTENNAS, FORTY-EIGHT (48) REMOTE RADIO UNITS, NINE (9) SURGE SUPPRESSORS AND EQUIPMENT CABINETS WITH A NEW 10’ (FOOT) 6” (INCH) ROOF SCREENING ON AN EXISTING 40’ (FOOT) 5” (INCH) THREE STORY BUILDING ON A PROPERTY LOCATED AT 8327 DAVIS STREET, ZONED HOSPITAL-MEDICAL (H-M). THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A. On March 20, 2023, the application was filed by Jeremy Siegel (hereinafter referred to as the “applicant”) a request for Conditional Use Permit (PLN-23- 00039) for a new wireless communication facility, zoned Hospital- Medical (H-M); and, B. On April 26, 2023, after a careful review of the submitted information, staff deemed the application incomplete; and C. On December 16, 2023, the applicant resubmitted required documents and materials for review; and, D. On January 19, 2024, Staff deemed the application complete; and, E. On February 8, 2024, a notice of the public hearing was sent to all property owners within 500-feet of the subject site and the notice was published in Downey Patriot; and, F. The Planning Commission held a duly noticed public hearing on February 21, 2024 and after fully considering all oral and written testimony, facts, and opinions offered at the aforesaid public hearing adopted this resolution. SECTION 2. The Planning Commission further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to Guideline Section No. 15303 (Class 3 – New Construction or Conversion of Small Structures. Categorical Exemptions are projects, which have been determined not to have a significant effect on the environment and have been exempted from the requirements of the California Environmental Quality Act. Class 3 exemptions consist of installation of small new equipment and facilities in small structures. SECTION 3. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Conditional Use Permit, the Planning Commission further finds, determines and declares that: PC AGENDA PAGE 10 Resolution No. 24-4020 Downey Planning Commission 8327 Davis Street – PLN-23-00039 February 21, 2024 – Page 2 1.The requested Conditional Use Permit will not adversely affect the purpose and intent of the Zoning Code or the City’s General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof. The purpose of the Zoning Code is to regulate the use of land in order to promote the public’s health, safety, and the general welfare. The Conditional Use Permit authorizes the installation of wireless communication facilities, subject to specific standards outlined in Subsection 9426.04(b) of the Downey Municipal Code. Since the proposed project adheres to these development standards applicable to wireless communication facilities, it is deemed not to impede the purpose and intent of the Zoning Code. In accordance to General Plan Policy 2.7.1, the General Plan aims to "Provide adequate utility and communications infrastructure." Furthermore, General Plan Program 2.7.1.2 emphasizes the necessity to "Promote the expansion of communication networks to meet the needs of city residents, businesses, and other land uses." The proposed project aligns with these policies by enhancing the communication network through the addition of a new facility, thereby fulfilling the program's objectives. Therefore, the Conditional Use Permit is deemed compatible with the City's General Plan. Both the Zoning Code and the General Plan are designed to advance the public convenience and the general welfare of individuals residing or working within the City. As the Conditional Use Permit aligns with the provisions of both the Zoning Code and the General Plan, it is determined not to adversely impact the public convenience or the general welfare of individuals in the surrounding neighborhood. 2.The requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located. Both the existing uses and structures on the site and those on nearby properties will remain unaffected and undisturbed by the installation of the wireless facility. Staff anticipates no adverse consequences stemming from the proposal primarily because the wireless site conforms to the prescribed development regulations outlined in Section 9426. In addition, the proposed facility requires licensing by the FCC, which rigorously regulates the frequency of emissions from cell sites to ensure they operate at specific levels. Moreover, the placement of wireless facilities on buildings is commonplace within commercial corridors and in close proximity to residential. The design of the proposed facility is tailored to harmonize with existing structures on the site. Lastly, the installation of the wireless facility will not hinder the current or future utilization of the building. 3.The size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area. The site is approximately 15,000 square feet and is improved with an existing 7,692 square foot building. The installation of the antennas and various related equipment will occur on the roof of the existing building. The roof screen placement will help to conceal the wireless equipment from the public’s view. The proposed screening will be designed to create the appearance of an additional floor utilizing the same texture and color of the existing building. The black spandrel glass will be placed across the parapet to enhance the appearance of a faux fourth story. The wireless facility will not interfere with the potential future expansion of the existing commercial building as long as the building PC AGENDA PAGE 11 Resolution No. 24-4020 Downey Planning Commission 8327 Davis Street – PLN-23-00039 February 21, 2024 – Page 3 complies with the applicable development standards. Therefore, the size and shape of the site is adequate to allow the proposed use without being detrimental to the area. 4.The traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. The proposed wireless communication facility will generate limited visits to the site for maintenance purposes only. The facility operates automatically without the presence of a working crew. The limited visits will not impose an undue burden upon the streets and highways in the area as the capacity of the surrounding streets and highways can accommodate the trips generated by the maintenance of the facility. SECTION 4. Based upon the findings set forth in Sections 1 through 3 of this Resolution, the Planning Commission of the City of Downey hereby approves Conditional Use Permit PLN-23-00039, subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety and general welfare of the community and enable the Planning Commission to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes. SECTION 5. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 21th day of February, 2024. AYES: NOES: ABSENT: ABSTAIN: __________________________________ Carmela Uva, Chairwoman City Planning Commission APPROVED AS TO FORM: John M. Funk City Attorney CERTIFICATE OF ATTESTATION AND ORIGINALITY I, Ria Ioannidis, Recording Secretary, do hereby attest to and certify that the foregoing Resolution is the original resolution adopted by the Planning Commission of the City of Downey at a regular meeting held on February 21, 2024. Ria Ioannidis Recording Secretary PC AGENDA PAGE 12 Resolution No. 24-4020 Downey Planning Commission 8327 Davis Street – PLN-23-00039 February 21, 2024 – Page 4 PLN-23-00039 (CONDITIONAL USE PERMIT) EXHIBIT A – CONDITIONS OF APPROVAL PLANNING DIVISION 1. The approval of this Conditional Use Permit (PLN-23-00039) allows for the new Wireless Telecommunication Facility to include the following: • (16) antennas, (48) Remote radio units, (9) surge suppressors, (2) proposed GPS antennas, equipment cabinets and additional miscellaneous equipment to be screened by 10’ (foot) 5” (inch) fiber reinforced panels (FRP) that mimic the appearance of an additional story on property located at 8327 Davis Street; 2. Approval of the Conditional Use Permit (PLN-23-00039) shall not be construed to mean any waiver of applicable and appropriate zoning regulations, or any Federal, State, County, and City laws and regulations. Unless otherwise expressly specified, all other requirements of the City of Downey Municipal Code shall apply. 3. The applicant and the property owner shall sign and return an affidavit of Acceptance of Conditions, as provided by the City of Downey. 4. The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition. 5. The project shall be constructed and maintain in strict compliance with the approved set of plans. 6. The City Planner is authorized to make minor modifications to the approved preliminary plans or any of the conditions if such modifications shall achieve substantially the same results as would strict compliance with said plans and conditions. 7. The proposed screening as shown on the approved plans shall be maintained throughout the life on the Wireless Telecommunications Facility to ensure complete screening of the antennas and all other associated equipment is not visible from the public view. 8. The walls of the equipment enclosure and roof mounted screens shall be finished with graffiti resistant materials. Prior to the issuance of building permits, the applicant shall demonstrate to the satisfaction of the City Planner, that the finished materials will comply with this requirement. PC AGENDA PAGE 13 Resolution No. 24-4020 Downey Planning Commission 8327 Davis Street – PLN-23-00039 February 21, 2024 – Page 5 9. Any graffiti applied to the site shall be removed within 48 hours. 10. All utilities servicing the facility shall be installed underground. 11. The project must satisfy all necessary standards, requirements, licenses and registrations from the Federal Communications Commission (FCC) and any other applicable regulatory bodies prior to initiating the operation of the Wireless Communication Facility. 12. The applicant shall file, receive, and maintain all necessary licenses and registrations from the Federal Communications Commission (FCC) and any other applicable regulatory bodies prior to initiating the operation of the wireless telecommunication facility. The applicant shall supply the Community Development Director with the documentation of these licenses and registrations. 13. Within 30 days following the activation of the Wireless Telecommunications Facility, the applicant shall provide a radio frequency emissions compliance report to the Community Development Director certifying that the unit has been inspected and tested in compliance with FCC standards. 14. Every 5 years following the date of the building permit final, the applicant shall, at their own expense, prepare and submit to the Community Development Director an independently prepared updated radio frequency emissions compliance report and certification in compliance with all applicable FCC standards. 15. If any radio frequency emissions compliance report and certification, required by the Downey Municipal Code or these Conditions of Approval, demonstrates that the cumulative levels of radio frequency emissions exceed or may exceed FCC standards, the Community Development Director may require the applicant to modify the location or design of the facility and/or implement other mitigation measures to ensure compliance with FCC standards. The Director may require additional independent technical evaluation of the facility, at the applicant’s expense, to ensure compliance with FCC standards. 16. In the case of discontinuation, within 30 days after discontinuation of use, the facility’s operator shall notify the Community Development Director in writing that use of the facility has been discontinued. Within 180 days after discontinuation of use, the facility must be completely removed. BUILDING & SAFETY DIVISION 17. All future construction shall comply with the most recent version of the California Building Code, as adopted by the City of Downey. 18. Prior to the commencement of construction, the applicant shall obtain all required permits. Additionally, the applicant shall obtain all necessary inspections and permit final prior to beginning operation of the site. PC AGENDA PAGE 14 Resolution No. 24-4020 Downey Planning Commission 8327 Davis Street – PLN-23-00039 February 21, 2024 – Page 6 FIRE 19. The following comments pertain to a limited fire review of a design review plan submittal. The comments contained herein shall not be construed as complete or encompassing all fire-life safety code requirements set forth in local, State, and/or National local codes. 20. The establishment shall comply with all current code requirements for the occupancy use and type. 21. Both ground level and roof top equipment enclosures shall be properly identified with operator information, emergency phone numbers, location address, etc. Required hazardous identification and warning signage shall be provided. Should the 16 VRLA batteries contain corrosive electrolyte equal to or in excess of 55-gallons, the business shall be required to establish, implement, and submit a Hazardous Materials Business Plan (HMBP) to Statewide Environmental Reporting System (CERS) [HSC 25507; 25508]. 22. Roof access shall be maintained. Any antenna, or other obstruction on the roof of any commercial establishment, shall not obstruct or render egress or access hazardous in the event of fire other emergency [CA Fire Code §504.4]. New antenna locations with FRP screens shall not obstruct fire department roof access. PUBLIC WORKS 23. If any work is done in the public right-of-way, obtain permits from the Public Works Department for all improvements within the public right-of-way at least two weeks prior to commencing work. Contact Brian Aleman, Assistant Civil Engineer, at (562) 904-7110 for information. 24. Any new public utilities shall be installed underground. 25. Submit public improvement plan(s) for review and approval by Public Works Department. 26. All or any proposed public improvements shall comply with the latest edition of Standard Plans and Specifications for Public Works Construction, City of Downey standards, and the Americans with Disabilities Act (ADA). 27. Remove all Underground Service Alert (USA) temporary pavement markings immediately following the completion of the work / Final permit inspection. 28. Any utilities that are in conflict with the development shall be relocated at the owner/applicant's expense [End of Conditions] PC AGENDA PAGE 15 AT&T Propagation Maps Site Address : 8327 Davis St., Downey, CA 90241 PC AGENDA PAGE 16 LTE PCS Coverage Before site CLL01106 PC AGENDA PAGE 17 LTE PCS Coverage After site CLL01106 PC AGENDA PAGE 18 LTE PCS Coverage standalone site CLL01106 PC AGENDA PAGE 19 Coverage Legend In-Building Service: In general, the areas shown in dark green should have the strongest signal strength and be sufficient for most in-building coverage. However, in-building coverage can and will be adversely affected by the thickness/construction type of walls, or your location in the building (i.e., in the basement, in the middle of the building with multiple walls, etc.) In-Transit Service: The areas shown in the yellow should be sufficient for on-street or in-the-open coverage, most in-vehicle coverage and possibly some in-building coverage. Outdoor Service: The areas shown in the purple should have sufficient signal strength for on-street or in-the-open coverage but may not have it for in-vehicle coverage or in-building coverage. PC AGENDA PAGE 20 8327 Davis Street Downey CA 90241 CLL01106 Accuracy of photo simulation based upon information provided by project applicant. Looking northeast from Davis StreetProposed View 1 Existing proposed at&t antennas behind new screen proposed equipment xxxxxxxxxxx proposed verizon antennas behind new screenproposed at&t antennas behind new screen proposed verizon antennas behind new screen ©2023 Google Maps PC AGENDA PAGE 21 Accuracy of photo simulation based upon information provided by project applicant. Looking southwest from Dolan AvenueProposed View 2 Existing proposed equipment xxxxxxxxxxx 8327 Davis Street Downey CA 90241 CLL01106 proposed at&t antennas behind new screenproposed at&t antennas behind new screen ©2023 Google Maps PC AGENDA PAGE 22 Accuracy of photo simulation based upon information provided by project applicant. Looking northwest from Davis StreetProposed View 3 Existing proposed at&t antennas behind new screen proposed equipment xxxxxxxxxxx 8327 Davis Street Downey CA 90241 CLL01106 proposed verizon antennas behind new screen proposed at&t antennas behind new screen ©2023 Google Maps PC AGENDA PAGE 23 Eukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONSTRUC T IONT-1EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN TITLE SHEETSITE NUMBER: CLL01106PACE#: MRLOS094225FA#: 13024055USID#: 131767PROJECT: NSBSITE TYPE: ROOFTOPSITE ADDRESS: 8327 DAVIS ST.DOWNEY, CA 90241AERIAL VIEWVICINITY MAPDRIVING DIRECTIONSSITE INFORMATIONCODE COMPLIANCEPROJECT TEAMGENERAL NOTESUNDERGROUND SERVICE ALERTUTILITY NOTIFICATION CENTER OF CALIFORNIA(800) 422-4133WWW.CALIFORNIA811.ORGCALL 2-14 WORKING DAYS UTILITY NOTIFICATION PRIOR TO CONSTRUCTIONTHIS FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. A TECHNICIAN WILL VISIT THE SITE ASREQUIRED FOR ROUTINE MAINTENANCE. THE PROJECT WILL NOT RESULT IN IN ANY SIGNIFICANTDISTURBANCE OR EFFECT ON DRAINAGE. NO SANITARY SEWER SERVICE, POTABLE WATER, OR TRASHDISPOSAL IS REQUIRED AND NO COMMERCIAL SIGNAGE IS NEW.IF CONTRACTOR ENCOUNTERS CONDITIONS IN FIELD, EITHER UNFORESEEN OR IN SOME MANNER INCONFLICT WITH THESE DRAWINGS, THE CONTRACTOR SHALL NOTIFY THE REGISTERED DESIGNPROFESSIONAL OF SUCH CONDITIONS IN WRITING AND SHALL ACKNOWLEDGE ANY WORK DONE OUTSIDEOF JURISDICTIONAL PERMITTED PLANS IS DONE AT CONTRACTORS OWN RISK.FOR "SPECIAL INSPECTIONS" SPECIFIC TO THIS PROJECT PURSUANT TO CBC SECTION 1704.3, SEE SHEETT-4, "STATEMENT OF SPECIAL INSPECTIONS"SUBCONTRACTOR SHALL VERIFY ALL PLANS & EXISTING DIMENSIONS & CONDITIONS ON THE JOB SITE &SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDINGWITH THE WORK OR BE RESPONSIBLE FOR SAME.FULL SIZE = 24”x36”. ANY OTHER SIZE PRINT IS NOT ORIGINAL SCALE.ALL INDICATED DIMENSIONS SHALL TAKE PRECEDENT OVER SCALED DIMENSIONS.ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENTEDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING INTHESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT CONFORMING TO THESE CODES.HANDICAP REQUIREMENTS:FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION, AND IS EXEMPTED FROM ACCESSIBILITYREQUIREMENTS IN ACCORDANCE WITH 2022 CALIFORNIA BUILDING CODE SECTION 11B-203.5.THIS FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. A TECHNICIAN WILL VISIT THE SITE ASREQUIRED FOR ROUTINE MAINTENANCE. THE PROJECT WILL NOT RESULT IN IN ANY SIGNIFICANTDISTURBANCE OR EFFECT ON DRAINAGE. NO SANITARY SEWER SERVICE, POTABLE WATER, OR TRASHDISPOSAL IS REQUIRED AND NO COMMERCIAL SIGNAGE IS NEW.1. 2022 CALIFORNIA ADMINISTRATIVE CODE2. 2022 CALIFORNIA BUILDING CODE3. 2022 CALIFORNIA ELECTRIC CODE4. 2022 CALIFORNIA MECHANICAL CODE5. 2022 CALIFORNIA PLUMBING CODE6. 2022 CALIFORNIA FIRE CODE7. ANY LOCAL BUILDING CODE AMENDMENTS8. CITY/COUNTY ORDINANCES9. ANSI / TIA-222 STRUCTURAL CODE10. NFPA 780 - LIGHTING PROTECTION CODESITESITEPROJECT MANAGER:AT&T1452 EDINGER AVE, 3RD FLOORTUSTIN, CA 92780CONTACT: TY LOGAN-BURKSPHONE: (925) 549-4671EMAIL: tl784a@att.comRF ENGINEER:AT&T1452 EDINGER AVE, 3RD FLOORTUSTIN, CA 92780CONTACT: SANDEEP MANGATPHONE: (530) 540-4201EMAIL: sm2840@att.comSITE ACQUISITION:EUKON GROUP65 POST, SUITE 1000IRVINE, CA 92618CONTACT: JEREMY SIEGELPHONE: (714)366-8047EMAIL:jeremy.siegel@eukongroup.comZONING:A&E CONTACT:EUKON GROUP65 POST, SUITE 1000IRVINE, CA 92618CONTACT: RICH BRUNETPHONE: (949) 899-5597EMAIL: rich.brunet@eukongroup.comCONSTRUCTION:AT&T1452 EDINGER AVE, 3RD FLOORTUSTIN, CA 92780CONTACT: ANDRE CAMOUPHONE: (562) 293-6236EMAIL: ac2960@att.comADDRESS:TELEPHONE COMPANY:SPECTRUMPOWER COMPANY:SCECONSTRUCTION TYPE:V-BOCCUPANCY GROUP:UPARCEL NUMBER:6255-010-048ZONING DISTRICT:--ZONING JURISDICTION:DOWNEYLONGITUDE (NAD 83):LATITUDE (NAD 83):COUNTY:LOS ANGELESPROPERTY OWNER:DOWNEY, CA 902418327 DAVIS ST.DAVID AGUILARLEASE AREA:120 SQ.FT.1. DEPART 1452 EDINGER AVE AND HEAD NORTH ONEDINGER AVE. TOWARDS I-5.2. HEAD NORTHWEST.3. TURN RIGHT TOWARD EDINGER AVE.4. TURN RIGHT ONTO EDINGER AVE.5. TURN LEFT ONTO RED HILL AVE.6. TURN LEFT ONTO WALNUT AVE.7. TURN RIGHT ONTO NEWPORT AVE.8. TURN LEFT AND TAKE RAMP ONTO I-5 N (SANTA ANAFWY).9. TAKE EXIT 107C TOWARD STATE COLLEGE BLVD/THECITY DR.10. CONTINUE ON S ANAHEIM WAY TOWARD ANAHEIMWAY/ORANGEWOOD AVE.11. CONTINUE ON S ANAHEIM WAY.12. KEEP RIGHT ONTO S ANAHEIM WAY.13. TAKE RAMP ONTO I-5 N (SANTA ANA FWY).14. TAKE EXIT 121 TOWARD NORWALK BLVD/IMPERIAL HWY.15. TURN LEFT ONTO NORWALK BLVD. CONTINUE ON SANANTONIO DR TOWARD I-5 S/SANTA ANA.16. TURN RIGHT ONTO FIRESTONE BLVD.17. TURN LEFT ONTO STEWART AND GRAY RD TOWARDDISCOVERY SPORTS COMPLEX.18. TURN RIGHT ONTO DOWNEY AVE.19. TURN RIGHT ONTO DAVIS ST.20. 8327 DAVIS ST. DOWNEY, CA 90241-4918DIRECTIONS FROM AT&T OFFICE AT 1452 EDINGER AVE, TUSTIN, CA 92780SHEET INDEXSHEETDESCRIPTIONT-1 TITLE SHEETA-2 EQUIPMENT PLANA-3 ANTENNA AND RRU SCHEDULEA-4ELEVATIONSA-1.1 ROOF PLANA-1 SITE PLANREV0·(2) PROPOSED 12'-2" FRP ANTENNA SCREENS·(1) PROPOSED 12'-2" STEEL ANTENNA SCREEN·(16) PROPOSED AT&T 8' PANEL ANTENNAS·(48) PROPOSED AT&T RRUS·(8) PROPOSED AT&T DC9 SURGE SUPPRESSORS·(1) PROPOSED AT&T DC50 SURGE SUPPRESSOR·(2) PROPOSED AT&T GPS ANTENNAS·(1) PROPOSED AT&T POWER PLANT·(1) PROPOSED AT&T BATTERY CABINET·(1) PROPOSED AT&T STEEL PLATFORM MOUNTED ON ROOFTOP·(1) CIENA PANEL·(1) TELCO BOX·(1) ELECTRICAL PANELLS-1 ROOFTOP SURVEYAPPROVALSAT&T WIRELESS PROPOSES TO INSTALL A WIRELESS COMMUNICATIONS FACILITY. THE SCOPE WILL CONSISTOF THE FOLLOWING:PROJECT DESCRIPTION33° 56' 11.29" N33.936469°118° 8' 2.24" W-118.133956°EUKON GROUP65 POST, SUITE 1000IRVINE, CA 92618CONTACT: JEREMY SIEGELPHONE: (714)366-8047EMAIL:jeremy.siegel@eukongroup.comA-5ANTENNA PLAN LS-2 NOTES00000000PC AGENDA PAGE 24 PC AGENDA PAGE 25 PC AGENDA PAGE 26 G A S G A S G A S F/PF/PF/PF/ P F/PF B R FBRFBREukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONSTRUC T IONA-1EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN SITE PLANSCALE64'32'16'016'8'1/16"=1'-0"190°135°45°270°225°180°315°0°NOTES:1. IF DIMENSIONS SHOWN ON PLAN DO NOT SCALECORRECTLY, CHECK FOR REDUCTION ORENLARGEMENT FROM ORIGINAL PLANS.2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.3. UTILITY DESIGNS AND ROUTES ARE PRELIMINARYPENDING FINAL DESIGN BY UTILITY PROVIDER.4. THIS SITE PLAN IS NOT INTENDED TO BE A LANDSURVEY.SITE PLAN~EXISTING BUILDING~PROPERTY LINE [193']APN: 6255-010-900~EXISTING PARKING~PROPOSED AT&T MOBILITY FIBERHAND HOLE (MMP) AT PLP R O P E R T Y L I N E [ 1 3 9 ' ]APN: 6255-010-048APN: 6255-010-037APN: 6255-010-900APN: 6255-010-905APN: 6255-011-035~ASPHALT PARKING(NO ACCESS)~DAVIS ST.CLD O L A N A V E . C L SE C T O R " A " AZ I M U T H : 3 0 °SECTOR "B"AZIMUTH: 120°SECTOR "C"AZIMUTH: 210°SECTOR "D"AZIMUTH: 300°PROPOSED AT&T WIRELESSEQUIPMENT LEASE AREA1A-2EXISTING UTILITY POLE#576231E AND PROPOSEDAT&T WIRELESS FIBER POCPROPOSED AT&T POWER FEED FROMELECTRICAL ROOM TO LEASE AREA70'-0"35'-0"35'-0"ELECTRICAL ROOM IN FIRST FLOOR GARAGE. AT&TCO-LOCATING WITH VERIZON, SWITCH GEAR WILLNEED TO BE UPGRADED TO ACCOMODATE THEPROPOSED POWER FOR BOTH CARRIERS.PROPOSED GENERATOR PLUG ANDDISCONNECT SWITCH AT GRADEPROPOSED 3" WALL MOUNTED CONDUITWITH POWER FEED FROM ELECTRICALROOM TO ROOFTOPPROPOSED AT&T 4" WALL MOUNTEDCONDUIT WITH FIBER FEED TO ROOF TOPVERIZON FIBER FEED TO ROOFTOPEXISTING ROAD EASEMENT[2] SEE SHEET LS-2PC AGENDA PAGE 27 GASGAS GAS GAS GASGAS GASF/PF/PF/PF/PF/PF/PF/PF/P F/PF/PF/PEukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONSTRUC T IONA-1.1EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN ROOF PLANSCALE32'16'8'08'4'1/8"=1'-0"190°135°45°270° 225°180°315°0°NOTES:1. IF DIMENSIONS SHOWN ON PLAN DO NOT SCALECORRECTLY, CHECK FOR REDUCTION ORENLARGEMENT FROM ORIGINAL PLANS.2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.3. THIS SITE PLAN IS NOT INTENDED TO BE A LANDSURVEY.ROOF PLANAPN: 6255-010-048PROPOSED AT&T 4" WALL MOUNTED CONDUITWITH FIBER FEED TO ROOF TOPELECTRICAL ROOM IN FIRST FLOOR GARAGE. AT&TCO-LOCATING WITH VERIZON, SWITCH GEAR WILLNEED TO BE UPGRADED TO ACCOMODATE THEPROPOSED POWER FOR BOTH CARRIERS.PROPOSED AT&T POWER FEED FROMELECTRICAL ROOM TO LEASE AREA1A-3PROPOSED AT&T ANTENNASECTOR "A", "C" & "D". SEEPROPOSED ANTENNA PLAN1A-3PROPOSED AT&T ANTENNA SECTOR "B".SEE PROPOSED ANTENNA PLANPROPOSED AT&TWIRELESS 10'x12'EQUIPMENT LEASE AREA1A-2FUTURE VERIZON 12'-6"x 22'-0" LEASE AREAEXISTING ROOFACCESS HATCHEXISTING PLATFORMEXISTING ROOF SKYLIGHT, TYP.EXISTING ROOFDUCT, TYP.EXISTING STEELPROPOSED AT&T ROOFMOUNTED CABLE TRAY146'-0"PROPOSED AT&T FRP SCREENSECTOR "A"AZIMUTH: 30°SECTOR "B"AZIMUTH: 120°SECTOR "C"AZIMUTH: 210°SECTOR "D"AZIMUTH: 300°PROPOSED 3" WALL MOUNTED CONDUITWITH POWER FEED FROM ELECTRICALROOM TO ROOFTOPFUTURE VERIZON ANTENNAS, TYP.13'-3"12'-6"6'-7"PROPOSED AT&T 4" CONDUIT WITHFIBER FEED TO LEASE AREA5'-0"6'-9"FUTURE VERIZON ANTENNAS, TYP.FUTURE VERIZON ANTENNAS, TYP.16'-0"8'-0"PROPOSED AT&T STEELANTENNA SCREEN27'-0"13'-0"26'-5"9'-0"4'-2"57'-2"27'-6"57'-2"14'-0" 35'-5" 13'-0"27'-0"14'-0"PC AGENDA PAGE 28 Eukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONSTRUC T IONA-2EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN NOT USEDSCALE8'4'2'02'1'1/2"=1'-0"190°135°45°270° 225°180°315°0°NOTE:1. IF DIMENSIONS SHOWN ON PLAN DO NOT SCALECORRECTLY, CHECK FOR REDUCTION ORENLARGEMENT FROM ORIGINAL PLANS.2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.EQUIPMENT PLANSCALENONE2 EQUIPMENT PLATFORM PLANPROPOSED AT&T POWERPLANT ON STEEL PLATFORMPROPOSED AT&T BATTERYCABINET ON STEEL PLATFORMPROPOSED (2) AT&TPURCELL CABINET(STACKED) PLATFORMPROPOSED AT&T DC50SURGE SUPPRESSOR ONSTEEL PLATFORMPROPOSED AT&TH-FRAME ON POSTPROPOSED AT&T (1) CIENAAND (1) TELCO BOX ONSTEEL PLATFORMPROPOSED AT&T EQUIPMENTACCESS STAIRS4'-11"2'-0"1'-0"4'-0"5'-0"2'-0"2'-8"6"2'-8"6"2'-2"1'-2"3'-8"8" 12'-0" PROPOSED AT&T LEASE AREA 10'-0"PROPOSED AT&T LEASE AREA1'-6"1'-6"2'-10"PROPOSED AT&TELECTRICAL PANEL ONSTEEL PLATFORMPC AGENDA PAGE 29 Eukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONSTRUC T IONA-3EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN ANTENNA AND RRU SCHEDULESCALENONE1ANTENNA AND RRUSCHEDULE1PART NUMBERQTYRAYCAPSURGE SUPPRESSION SYSTEM SCHEDULESYSTEM8LOCATIONMOUNTED AT EQUIPMENT PLATFORMMFR.DC50-48-60-0-25ERAYCAPDC9-48-60-24-8C-EVMOUNTED AT ANTENNASNOTES TO CONTRACTOR:1. CONTRACTOR IS TO REFER TO AT&T'S MOST CURRENT RADIOFREQUENCY DATA SHEET (RFDS) PRIOR TO CONSTRUCTION.2. CABLE LENGTHS WERE DETERMINED BASED ON A VISUALINSPECTION DURING SITE WALK. CONTRACTOR TO VERIFYACTUAL LENGTH DURING PRE-CONSTRUCTION WALK.3. CONTRACTOR TO USE ROSENBERGER FIBER LINE HANGERCOMPONENTS (OR ENGINEER APPROVED EQUAL).4. CONTRACTOR TO USE CABLES SPECIFIED (OR ENGINEERAPPROVED EQUAL).5. FOR ALL SECTORS: AIR ANTENNA HEIGHT NEEDS TO MOVE UPTO MATCH ANTENNA TIP WITH THE PASSIVE ANTENNASA2RAD CENTERSECTORA1A3B2B1OPTIMUM ANTENNA REQUIREMENTS (VERIFY WITH CURRENT RFDS)B3C2C1C4C3ALPHA SECTORBETA SECTORGAMMA SECTOR ANTENNAAZIMUTHANTENNA MODELTECHNOLOGYLENGTHNUMBERTRANSMISSIONCABLE2 FIBERLTEANTENNA SIZE8'2 FIBERPANEL ANTENNALTEPANEL ANTENNA46'-10"210°120°30°A4B42 FIBERLTE2 FIBERPANEL ANTENNALTEPANEL ANTENNA2 FIBERLTE2 FIBERPANEL ANTENNALTEPANEL ANTENNAD2D1D4D3300°2 FIBERLTE2 FIBERPANEL ANTENNALTEPANEL ANTENNADELTA SECTOR C-BAND2'-7"2 FIBERPANEL ANTENNAC-BAND2'-7"2 FIBERPANEL ANTENNA49'-6"C-BAND2'-7"2 FIBERPANEL ANTENNAC-BAND2'-7"2 FIBERPANEL ANTENNAC-BAND2'-7"2 FIBERPANEL ANTENNAC-BAND2'-7"2 FIBERPANEL ANTENNAC-BAND2'-7"2 FIBERPANEL ANTENNAC-BAND2'-7"2 FIBERPANEL ANTENNA±100'±20'±90'±130'MINIMUM CLEARANCESSECTORA1RRU TYPEREMOTE RADIO UNITSALPHA SECTOR ABOVEBELOW SIDESRRU LOCATION(DISTANCE FROMANTENNA)±15'16" 8" 0"A2A3A4BETA SECTOR 16" 8" 0"(3) ERICSSON RRUs (LTE)GAMMA SECTOR B1B2B3B4DELTA SECTOR 8'8'8'8'8'8'8'(3) ERICSSON RRUs (LTE)±15'C1C2C3C4D1D2D3D4±20'±20'±20'±90'±90'±90'±100'±100'±100'-------------------±130'±130'±130'-----300°300°300°-210°210°210°-30°30°30°-120°120°120°-(3) ERICSSON RRUs (LTE)±15'16" 8" 0"±15'16" 8" 0"16" 8" 0"(3) ERICSSON RRUs (LTE)(3) ERICSSON RRUs (LTE)±15'(3) ERICSSON RRUs (LTE)±15'16" 8" 0"±15'16" 8" 0"16" 8" 0"(3) ERICSSON RRUs (LTE)(3) ERICSSON RRUs (LTE)±15'(3) ERICSSON RRUs (LTE)±15'16" 8" 0"±15'16" 8" 0"16" 8" 0"(3) ERICSSON RRUs (LTE)(3) ERICSSON RRUs (LTE)±15'(3) ERICSSON RRUs (LTE)±15'16" 8" 0"49'-6"46'-10"-46'-10"46'-10"-46'-10"46'-10"-46'-10"46'-10"-49'-6"49'-6"49'-6"49'-6"49'-6"49'-6"±15'16" 8" 0"(3) ERICSSON RRUs (LTE)±15'16" 8" 0"(3) ERICSSON RRUs (LTE)±15'16" 8" 0"(3) ERICSSON RRUs (LTE)±15'16" 8" 0"(3) ERICSSON RRUs (LTE)---- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - ----- - -PC AGENDA PAGE 30 Eukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONS TRUC T IONA-4EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN 90°135°45°270°2 2 5 °180°315°0°NOTE:1. IF DIMENSIONS SHOWN ON PLAN DO NOT SCALECORRECTLY, CHECK FOR REDUCTION ORENLARGEMENT FROM ORIGINAL PLANS.2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.3. ANTENNA AND MW AT&T SPECIFICATIONS REFER TOANTENNA SCHEDULE AND TO FINAL CONSTRUCTIONRFDS FOR ALL RF DETAILS.8'4'2'1'02'SCALE3/8"=1'-0"1NEW ANTENNA PLANNEW ANTENNA PLAND3D2D1A4A3A2A1C1C2C3B4B3B2B1PROPOSED AT&T PANEL ANTENNAS(TYP. 4 PER SECTOR, 16 TOTAL)PROPOSED AT&T FRP SCREENEXISTING BUILDING PARAPETPROPOSED AT&T ROOFMOUNTED CABLE TRAYFUTURE VERIZON ANTENNAS, TYP.PROPOSED AT&T RRU(TYP.- 12 PER SECTOR, 48 TOTAL)PROPOSED AT&T SUPPORT FRAMEPROPOSED AT&T RRU (TYP.-12 PER SECTOR, 48 TOTAL)PROPOSED AT&T SUPPORT FRAMEPROPOSED AT&T DC9 SURGE SUPPRESSOR(TYP.- 2 PER SECTOR, 8 TOTAL)D4S E C T O R " A " AZ I M U T H : 3 0 °SECTOR "B"AZIMUTH: 120°SECTOR "C"AZIMUTH: 210°SECTOR "D"AZIMUTH: 300°C4PROPOSED AT&T PANEL ANTENNAS(TYP. 4 PER SECTOR, 16 TOTAL)PROPOSED AT&T DC9 SURGE SUPPRESSOR(TYP.- 2 PER SECTOR, 8 TOTAL)1'-8"TYP.1'-9"1'- 9 " 1'- 9 " 3'-0"TYP.3'-0"TYP.3'-0"TYP.1'-11"TYP. 1'- 8 " T Y P .1'-9"TYP.FUTURE VERIZON ANTENNAS, TYP.FUTURE VERIZON ANTENNAS, TYP.1'-11"5'-6"PC AGENDA PAGE 31 Eukonwww.eukongroup.com65 POST, SUITE 1000IRVINE, CA 92618TEL: (949) 553-8566an SFC Communications, Inc. CompanyCLL011068237 DAVIS ST.DOWNEY, CA 90241REV DATEDESCRIPTIONSUBMITTALSA 12/13/22 90% ZONING DRAWINGSPROJECT INFORMATIONSHEET TITLESHEET NUMBERDRAWN BY:MGGDRBZONINGDRAWINGSIT IS A VIOLATION OF LAW FOR ANY PERSON,UNLESS THEY ARE ACTING UNDER THE DIRECTIONOF THE LICENSED PROFESSIONAL ENGINEER,TO ALTER THIS DOCUMENT.UTILITIESCHECKED BY:A&E CHECKED BY:1452 EDINGER AVE.3RD FLOORTUSTIN, CA 92780NOT FORCONSTRUC T IONA-5EUKON_AT&T_90CD_MONOPOLE TEMPLATE_V1_10-18-22 0 02/02/22 100% ZONING DRAWINGS1 09/19/23 REVISED DESIGN NOTE:1. IF DIMENSIONS SHOWN ON PLAN DO NOT SCALECORRECTLY, CHECK FOR REDUCTION ORENLARGEMENT FROM ORIGINAL PLANS.2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.ELEVATIONSGROUND LEVELSCALE32'16'8'08'4'1/8"=1'-0"2SCALE32'16'8'08'4'1/8"=1'-0"1PROPOSED SOUTHEAST ELEVATIONPROPOSED SOUTHWEST ELEVATIONELEV. 0'-0" (REF)GROUND LEVELELEV. 0'-0" (REF)(113.9' AMSL)PROPOSED AT&T PANEL ANTENNAS(TYP. 4 PER SECTOR, 16 TOTAL)PROPOSED AT&T PANEL ANTENNAS(TYP. 4 PER SECTOR, 16 TOTAL)PROPOSED AT&T FRP SCREENWITH RECESSED DECORATIVE TRIMTO MATCH EXISTING STRUCTUREPROPOSED AT&T FRP SCREENWITH RECESSED DECORATIVE TRIMTO MATCH EXISTING STRUCTURETOP OF EXISTING PARAPETELEV. 37'-5"PROPOSED AT&T PANEL ANTENNAS(TYP. 4 PER SECTOR, 16 TOTAL)PROPOSED AT&T FRP SCREENWITH RECESSED DECORATIVE TRIMTO MATCH EXISTING STRUCTUREPROPOSED FAUX FRP WINDOWS10'-5"RAD CENTER OF PROPOSED AT&T 8' ANTENNASELEV. 46'-10"TOP OF PROPOSED AT&T FRP SCREEN/ANTENNASELEV. 50'-10"BOTTOM OF PROPOSED AT&T ANTENNASELEV. 42'-10"RAD CENTER OF PROPOSED AT&T 31" ANTENNASELEV. 49'-7"TOP OF EXISTING PARAPETELEV. 40'-5"TOP OF EXISTING PARAPETELEV. 37'-5"RAD CENTER OF PROPOSED AT&T 8' ANTENNASELEV. 46'-10"TOP OF PROPOSED AT&T FRP SCREEN/ANTENNASELEV. 50'-10"BOTTOM OF PROPOSED AT&T ANTENNASELEV. 42'-10"RAD CENTER OF PROPOSED AT&T 31" ANTENNASELEV. 49'-6"TOP OF EXISTING PARAPETELEV. 40'-5"TOP OF EXISTING PARAPETELEV. 37'-5"RAD CENTER OF PROPOSED AT&T 8' ANTENNASELEV. 46'-10"TOP OF PROPOSED AT&T FRP SCREEN/ANTENNASELEV. 50'-10"BOTTOM OF PROPOSED AT&T ANTENNASELEV. 42'-10"RAD CENTER OF PROPOSED AT&T 31" ANTENNASELEV. 49'-6"TOP OF EXISTING PARAPETELEV. 40'-5"10'-5"PROPOSED FAUX FRP WINDOWSPC AGENDA PAGE 32